Decision Notice - 010.2008.00002078.001 [As Published] · 132008.2078
2008/2078
19. All building materials containing asbestos, including asbestos cement sheeting or roofing and
lagging, must be removed from the building and disposed of in accordance with industry best
practice.
20. Waste generated during construction must be stockpiled in a centralised location and covered
as required to prevent material being blown onto adjoining properties including the road
reserve or food waste from generating vermin. All site waste must be disposed of to an
approved waste disposal facility either directly or via an approved waste receptacle and
collection service. Storage areas are to be located near the temporary access to the site so
that access can be gained with out damage to infrastructure.
21. All building materials containing asbestos products must be disposed on in accordance with
industry best practice.
22. A temporary crossing must be provided to protect road reserve infrastructure including kerb
and channel;
23. Any damage to footpaths, street plantings, kerb and channel or roadways at the removal site,
the relocation site or between the sites must be repaired or reinstated to at least pre-existing
conditions.
24. All disturbed areas must be revegetated or otherwise stabilised at the completion of the works.
Disturbed areas are revegetated using species identified in PSP3 – Landscaping Plants and
Guidelines.
25. The transportation of all materials to and from the site must be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying out materials either to
or from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
26. A Waste Management Plan shall be submitted for the demolition to the Land Use Section of
the Sunshine Coast Regional Council – Tewantin office, prior to the development permit for
building works being issued. The Plan shall contain the following information:-
MATERIALS ON-SITE DESTINATION
Re-use and Recycling Disposal
Expected waste Estimated volume On-site *specify Off-site *Specify
materials (m³) proposed reuse or *specify contractor &
onsite recycling contractor & landfill site
methods recycling outlet
Excavation
material
Green waste
Bricks
Concrete
Timber –
please specify
Plasterboard
Metals – please
specify
Asbestos
Other – please
specify
NOTE: Details of site area to be used for onsite separation, treatment and storage (including
weather protection) shall be provided on the plan drawings accompanying your application.
Page 4 of 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00002078.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 205 KB (small file)
- File type
No other editions are linked here.