A #NoosaConnects networking event was held by Council in conjunction with CCIQ at The J in
March 2016. This business networking evening was attended by over 200 people to connect
with industry and government funding and other support bodies. It was very well received by
the Noosa business community.
During 2015/16, Council approved 98% of development applications with the number of
applications showing a steady increase in activity. We met statutory assessment timeframes
for most types of applications except for MCUs. The complexity and issues involved in MCU
applications meant that statutory timeframes were met between 60% and 80% of the time.
Building and Plumbing approval timeframes remained significantly better than statutory
requirements. There has been a significant improvement in building approval times in the last
two years.
Other Activities
Of course, not everything that Council has done in the last 12 months falls neatly into the seven
key priorities outlined above. In no particular order, some other key issues during 2015/16
included:
Local Government Election - March 2016
Although managed by the Electoral Commission of Queensland, the March 2016 Council
election was a milestone event seeing the conclusion of our first term following de-
amalgamation and the commencement of our second term. The retirement of Mayor Noel
Playford and Deputy Mayor Bob Abbot saw the departure of over 50 years of local government
experience. Cr Tony Wellington was elected as Mayor and there were also three new
Councillors elected. As such, an extensive and intense induction program was developed to
smooth the transition process from April to June 2016. That has been successfully achieved.
Audit and Risk Committee
Our Audit and Risk Committee continues to work quietly on ensuring that good governance
practices are in place. Although not high profile, this Committee plays an important role in
making sure that Council “dots the i’s and crosses the t’s” both in governance and in the
management of risk. Council received an unqualified audit from the Queensland Audit Office
(QAO) for its financial statements and during the external audit process no issues of concern
were raised by the QAO. Council’s Internal Audit Program included internal audits on Cash
Handling and the Waste Charges system.
Establishment of Enterprise Risk Management
We are significantly more advanced over the last 12 months in embedding risk management
practices into Council operations. An Enterprise Risk Management Policy and Framework has
been adopted by Council and risk registers established. The Leadership Team reviews
strategic risks on a quarterly basis and operational risk registers have been established at a
Departmental level. A comprehensive Business Continuity Plan is all but complete and will be
tested in 2016/17.
Disaster Management
Our Noosa Disaster Management and Disaster Recovery Plans have been adopted by Council.
Specific Disaster Management Plans were also developed for the Pomona and Daintree Estate
areas. In 2015/16, we undertook a major training exercise for a wild fire event. Luckily,
throughout the year, we were spared any major flooding events unlike some other SEQ
Councils. We have undertaken significant training for our staff to ensure that we are ready for
disaster events and the level of volunteering for this role by staff remains high.
Noosa North Shore
Council is well advanced with planning for a refurbishment of the Noosa North Shore
Wilderness Camp. At the same time, negotiations are continuing with DNRM to sort out
historical tenure issues on the Noosa North Shore and these negotiations are progressing well.
Noosa Council Annual Report 2015/16 Page 11
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Annual Report 2015-16(PDF, 16MB).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.