Skip to the record
Noosa’s premier civic archive.

Council archive · source document

07/2184 - Preliminary Building Work Assessable Against the Planning Scheme [As Published] · 172007.2184

of 38

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

    
  
 

 

 

    

CPE |
an Be I cy CL >

 
 

sewer; 60
requirements by a qualified tradesperson

      
 
 
     
  
   

 

fr]
N

 

 

 

 

 

 

 

 

 

 

 

 

 
   

col = SHS with galv. finish extemally

 
 
 
 
  
    
   
 

DETAIL, SURVEY

 
 
    
 

    
 
  
  
 
 
  
 

      

2.x min 2500 It water tanks.
as per to M.S.C code requirements ; existing wall to remain
conc. base x contractor {garden}
ee —— _ timber stud wall
with town water top up supply AREA SUMMARY
Existing Floor 174.5 sq.m
Proposed Floor 108.8 squm
Proposed Pergoia's 41.1 sq.m

 

; powder coated finish Intemally Lora onpsss | )00Uté‘(,:*t*dL]CA Oto
) @ PHONE PRTECTOR TOAS 708 1993 | 1415 PERSIMMON DRIVE
fw FLOOR WASTE PEREGIAN BEACH PERGOLA i
1mx i

    
   
 

 

 

    
  

 

 

 

 

 

   
 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 
 
      

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SB) a= ||E
$
BEDROOM. 3
100 stap
a ¥
S 3 [2
= | as 2
PSR & 0924 SW
as - 5
ea) |
aT
Wi
44.00 ° OO' CO"
™ 270" 00'00 wiry wal aka good oat ow floor plan
roof for addition SCALE 1:100

 

 

 

 

£ OF 54 082 126 © TH DEAS AND CONCEPTS CONTAINED WITHERS THER . eae .
ae soe ieee eee eee 145 Persim and n DV to: BUILDING APPROVAL 0716 BA-02
BSA No. 1066058 8 t 2 s + fn AT Peregian Beach, For John & Liz Harrison ( ngs only on
GENERAL NOTES TO BUILDER -drawings to be read in association with -refer to structural engineers drawings for ~waterproofing of wat areas to be In P- panty pst - 200x200 dressed HWD timber post |REV. [DATE |DESCRIPTION
-contractor to confirm all dimensions, levels SPecification and schedules of finishes all footing, slab and all wall details, timber accordance with section 3.8 of the B.C.A OSL Nate Sound Laval x FFL Finished Floor Level hp - gas hot plates - |62.10.07] B.A ISSUE
and site conditions including location -dimensions take precedent over scale and steel framing, Including bracing, tie-down —_-stalrs, handrais & balastrades to be in DP = B00 neried PG Doe ee at, hoor Waste rh - range hood over hot plates
of existing services on site prior to the -do not scale from drawings and sizing of structural members. accordance with section 3.9 of the B.C.A V - Vanity basin wrvd - washing mashina ref. space - refrigerator space
commencement of any works. -tefer specification for relevant -provide tarmite protection in accordance ~concsal all vent pipes and waste pipes WC - Water Closet with dryer space over Wo - wall oven
Australlan Standards with AS 3660 within wall framing unless noted otherwise | C.H - Celling Height 5 - stainless steel sink tile - tiled floor

 

 

Used in these records

About this file

File size
2.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2184 - Preliminary Building Work Assessable Against the Planning Scheme [As Published].pdf · 2.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.