Council archive · source document
07/2184 - Preliminary Building Work Assessable Against the Planning Scheme [As Published] · 172007.2184
“ INTEGRATED PLANNING ACT 1997 Development within the limits of a port For more information refer to Guide 18. For information ahout prescribed tidal work refer to Guide 24. you answered "YES’ to Qt2, the application triggers referral to the Port Authority. The Port Authority is a cancurrence agency if the development is — . * within 200m of a shipping channel or an entry and exit shipping corridor for the port © within 1000m of a swing basin, a commercial shipping wharf, a mooring, anchorage or spoil grounds; - . * within 1000m of a planned port facifity identified in a land use plan approved under the Transport Infrastructure Act 1994. in all other situation the Port Authority is an advice agency. IDAS Assessment Checklist, Version 20, 2 April 2007 12. Does the application involve development below high water mark’ and within the limits of a port under the Transport Infrastructure Act 1994? Gro Dl yes- complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work Service as an advice agency. Marinas For more information refer to Guide 18, For information about whether a marina is prescribed tidal work refer to Guide 24. The local govemment is the assessment manager for all prescribed tidal wark, if you answered "YES" to Q13, the application triggers referral to Queensland Fire and Rescue Tidal works in strategic post tand‘tidal areas . For more information refer to Guide 18. Unless you answered “NO” to Q14, the relevant Port Authority is the assessment manager for the application and the Environmental Protection Agency (EPA) and Queensland Transport (QT) are concurrence agencies for the application. Heritage For further information refer. to Guide 19. Ifyou answered “YES” to Q15, the application triggers referral to the Queensland Heritage Council as concurrence agency for the application. Unless you answered “none of the above” to Q15(b), the application involves referral to the Environmental Protection Agency as an advice agency for the application 13. Does the application involve operational work that is tidal work for a marina’ with more than 6 vessel berths? [NO LI YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work 14. Does the application involve tidal works within a strategic port land tidal area20? [ENO , (11 YES - complete Part M of Form 1 15. Does the application involve development in a heritage registered place as defined under the Queensland Heritage Act 1992? Zane) (71 YES - complete Part C of Form 1 15(b) The application involves: (tick applicable boxes) LJ (i) a material change of use assessable against the planning scheme and the lot shares a common boundary with a protected area or registered place under the Queensland Heritage Act 1992; reconfiguring a lot if the lot shares a common boundary with a protected area or registered place under the Queensland Heritage Act 1992; none of the above. iii) mii Declared catchment areas For more information, including a list of the declared catchment areas within Queensland, tefer to Guide 13. Untess you answered “none of the above” to Q16, the application requires assessment by the Department of Natural Resources and Water (NRW). if an agency other than NRW is the assessment Manager for the application, NRW is a concurrence agency for the application in relation to this matter. 16. The application is in an area declared to be a catchment area under the Water Act 2000 and involves: (tick the applicable box/es) DQ) reconfiguring a tot if any lot resulting from the reconfiguration is less than 16 hectares; Ci (i) development assessable against the planning scheme involving the establishment or expansion of a waste water disposal system, other than a disposal system for carrying out an environmentally relevant activity under the Environmental Protection Act 1994: Aili) none of the above 18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide. 19 Marina is defined in the Transport Operations (Maritime Poltution) Regulation 1995. 20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land. Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2184 - Preliminary Building Work Assessable Against the Planning Scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.