NEGOTIATED Decision Notice 142005.1803
NOOSA COUNCIL IDAS Development Application Decision Notice 4
19. The person acting on this permit shall ensure that its consultants and contractors take all reasonable care
during the construction of the engineering works to ensure that Council property, road pavements or
facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, etc.)
are protected against any damage or interference whatsoever. If any Council property or facilities should
be damaged by the Applicant or any of its Consultants or Contractors through any cause whatsoever in the
course of, directly or indirectly, carrying out the engineering works, the Applicant and/or its Contractors
shall forthwith notify the Manager-Land Development and shall forthwith rectify the damage to that
property or facility at its cost and to the satisfaction of the Manager-Land Development, prior to the
commencement of the use or, alternatively, the Applicant may request the Council to carry out the
rectification work at the Applicant’s cost, such cost being paid by the Applicant to the Council prior to the
commencement of the use, provided that in the case of emergency the Council shall be entitled to rectify
such damage at the cost of the Applicant, such cost being paid prior to the commencement of the use.
20. Sediment and erosion control measures must be in place prior to works commencing. If such measures
are not in place or are not satisfactory, “on the spot“ fines may be issued. Such fines can be issued if
sediments from the site are found to enter or have the potential to enter Council’s stormwater system or
natural waterways. Although the sediment and erosion control measures have been approved on drawing
No S3064/05/ER1, Council’s Manager – Land Development may request further controls to be installed
should approved measures be inefficient.
21. The Consulting Engineers for the project shall be currently Registered Professional Engineers of
Queensland. The consulting engineers are responsible for arranging all inspections, with Council’s
inspector or nominated staff.
22. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project. (This
person will be the contact for the project).
23. These works are also to be in compliance with the relevant conditions of Development Permit No.
2005/307.
KP https://noosacouncil-my.sharepoint.com/personal/kristen_preece_noosa_qld_gov_au1/documents/desktop/negotiated
decision notice.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
NEGOTIATED Decision Notice 142005.1803Related documentApplication case desk ↗
About this file
- File size
- 190 KB (small file)
- File type
No other editions are linked here.