Sam Hopper – Slope Stability Assessment and Geotechnical Report - Proposed Residence, 24 Arakon Crescent, Sunshine Beach
6.0 ENGINEERING STABILITY RECOMMENDATIONS
6.1 General Recommendations with Respect to Construction
Continued long term stability of the site is subject to development of the site taking place in
accordance with the guidelines of this report and relevant Australian Standards and good
building practices.
Based on the field observations, published hazard mapping and observed subsurface
conditions, it is concluded that provided the proposed development is undertaken using
our recommendations, it would not adversely affect the slope stability conditions at this
site. This conclusion is qualified by the following provisions:-
The earthworks should be designed and constructed in accordance with sound and
proper engineering principles.
Likewise, the future construction should be planned designed and constructed in
accordance with sound and proper engineering principles, and more specifically in
accordance with good hillside construction practices (refer Appendix J).
All construction works to be carried out in accordance with the recommendations of this
report.
The access and drainage infrastructure must be properly and effectively maintained, to
ensure that all stormwater is intercepted and controlled. This requirement extends to all
owners and occupiers being aware that ongoing maintenance of the site drainage is
essential for continued site stability.
The following recommendations should be adopted:-
All engineering works should follow the appropriate codes i.e.:-
o Earthworks - AS 3798 "Guidelines on Earthworks for Commercial and
Residential Developments".
o Footings for buildings - AS 2870 'Residential Slabs and Footings'.
o Retaining structures - AS 4678 ‘Earth Retaining Structures’.
Vegetation - where possible, the prompt re-establishment of ground cover should be
undertaken to reduce the risk of surface scour during and following rainfall. Where not
possible, other forms of surface protection should be adopted.
6.2 Stormwater Drainage
Appropriate drainage provisions are essential in any development. Adequate subsoil and
surface drainage should also be incorporated in any retaining wall construction.
Preferably, where possible, roof water should be taken via piped conduits to the road drainage
system or to water storage tanks. Any overflow from water storage tanks should be piped to the
road drainage system. Any outlet for pool backwash will also be required to be discharged into
an adequately designed system and piped to the road drainage.
Given the topography of the site however, we understand that provision of stormwater runoff
tank will be required to be installed near the rear of the residence. This will also cater for
capturing roof water.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment C - Soil Survey Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.