Attachment C - Soil Survey Report · MCU18/0013

Attached to the e-mail Response to info request part 1- MCU18/0013.

of 71

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Project No. 1-20119                                                                                                        Page | 26
March, 2018
Ref: 1-20119, 2018-03-02, BR VER 2
Sam Hopper – Slope Stability Assessment and Geotechnical Report - Proposed Residence, 24 Arakon Crescent, Sunshine Beach




      2) Structural Solution - This method includes the construction of retention systems
         (temporary or permanent) along the boundaries to support the material on the
         neighbouring properties and road. Given that the excavation is expected to be up to
         7m deep overall, a braced retaining wall will be required. This retaining wall should be
         installed prior to excavation to ensure stability of the sand profile.
         Several types of retaining walls could be employed including steel sheet piles,
         contiguous CFA piles or diaphragm wall. Each of these have relative advantages and
         disadvantages (technical and economic) which are best evaluated at the detailed
         design/tender stage.

Given the existing system on site (understood to be anchored sheet piles), it would be expected
that this system would again be utilised and improved upon (refer Section 7.4).

Once the preferred retention option for the site boundaries has been selected, SSE should be
contacted to provide further design detail (if required).

    7.4 Retaining Walls

           7.4.1       General

It is understood that retaining walls will be required for parts of the site. The lateral earth
pressure distribution that affects the retaining walls on the site will depend upon the following
parameters:-

          In-situ and backfill material properties
          Design water regime at the rear of the wall
          Wall and cut geometry
          Surcharges affecting the wall
          Wall type
          The structural bracing of the wall and the timing of backfilling behind the wall

           7.4.2       Pressure Distribution

The following situations should be considered:-

          For cantilever walls, which allow some movement at the top, (i.e. at least 0.005H in
           clays) the active case (Ka) applies with a triangular distribution in both the short and
           long term situations.
          For cantilever walls which cannot tolerate this movement, the at rest case (Ko) applies
           with a triangular distribution in both the short and long term situations.
          For structurally braced walls the wall design should be checked for both a trapezoidal
           (clay soils - short term conditions) and triangular distribution with Ko values (long term
           conditions).
The pressure distributions as referred to above are shown in Figures 5 and 6. The parameters
selected for use in the figures are dependent on the preconstruction geometry of the face being
retained. It is expected that without battering, the earth parameters will control

The lateral pressure distributions shown in Figures 5 and 6 include hydrostatic pressure and
show typical pressure distributions due to surcharge loadings. It is recommended that where

Used in these records

About this file

File size
4.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment C - Soil Survey Report.pdf · 4.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.