Council archive · source document
Attachment C - Soil Survey Report · MCU18/0013
Attached to the e-mail Response to info request part 1- MCU18/0013.
Project No. 1-20119
March, 2018
Ref: 1-20119, 2018-03-02, BR VER 2
Sam Hopper – Slope Stability Assessment and Geotechnical Report - Proposed Residence, 24 Arakon Crescent, Sunshine Beach
B.0 ASSESSMENT GUIDELINES
B.1 State Planning Policy (July, 2014)
B.1.1 General
In 2003 the Queensland State Government adopted under the Integrated Planning Act 1997
(IPA) the State Planning Policy 1/03 “Mitigating the Adverse Impacts of Flood, Bushfire and
Landslide” and an associated guideline.
In 2014, the Queensland State Government reissued all the State Planning Policies under a
single document (State Planning Policy July 2014 - SPP). Landslide has now been
addressed under two sections of the document these being:-
Part D – The State Interests and Plan Making policies - Planning for
Safety and Resilience to Hazards.
Making or amending a planning scheme and designating land for community
infrastructure
The planning scheme is to appropriately integrate the state interest by:
For all natural hazards:
3) Identifying natural hazard areas for flood, bushfire, landslide and coastal hazards
based on a fit for purpose natural hazard study, and
4) Including provisions that seek to achieve an acceptable or tolerable level of risk,
based on a fit for purpose risk assessment consistent with AS/NZS ISO 31000:2009
Risk Management, and
5) Including provisions that require development to:
a) Avoid natural hazard areas or mitigate the risks of the natural hazard to an
acceptable or tolerable level, and
b) Support, and not unduly burden, disaster management response or recovery
capacity and capabilities, and
c) Directly, indirectly and cumulatively avoid an increase in the severity of the
natural hazard and the potential for damage on the site or to other properties, and
d) Maintain or enhance natural processes and the protective function of landforms
and vegetation that can mitigate risks associated with the natural hazard, and
6) Facilitating the location and design of community infrastructure to maintain the
required level of functionality during and immediately after a natural hazard event.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment C - Soil Survey Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.