Original source · versioned page text
DA Form 1 - 62 Gympi Tce TEwantin
6.3) Additional aspects of development LJ Additional aspects of development are relevant to this development application and the details for these aspects that would be required under Part 3 Section 1 of this form have been attached to this development application C1 Not required 6.4) Is the application for State facilitated development? C1 Yes - Has a notice of declaration been given by the Minister? [No Section 2 — Further development details 7) Does the proposed development application involve any of the following? Material change of use LJ Yes — complete division 1 if assessable against a local planning instrument Reconfiguring a lot oO Yes — complete division 2 Operational work [Yes - complete division 3 Building work (1 Yes - complete DA Form 2 - Building work details Division 1 — Material change of use Note: This division is only required to be completed if any part of the development application involves a material change of use assessable against a local planning instrument. 8.1) Describe the proposed material change of use Provide a general description of the Provide the planning scheme definition | Number of dwelling | Gross floor proposed use (include each definition in a new row) units (if applicable) area (m?) (if applicable) 8.2) Does the proposed use involve the use of existing buildings on the premises? 8.3) Does the proposed development relate to temporary accepted development under the Planning Regulation? LJ Yes — provide details below or include details in a schedule to this development application C1 No Provide a general description of the temporary accepted development Specify the stated period dates under the Planning Regulation Division 2 — Reconfiguring a lot Note: This division is only required to be completed if any part of the development application involves reconfiguring a lot. 9.1) What is the total number of existing lots making up the premises? 9.2) What is the nature of the lot reconfiguration? (tick all applicable boxes) LJ Subdivision (complete 10) LJ Dividing land into parts by agreement (complete 11) LJ Boundary realignment (complete 12) (J Creating or changing an easement giving access to a lot from a constructed road (complete 13) Queensland Government
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.