4. MCU130098 Decision Notice (approval) · MCU13/0098

Attached to the e-mail Operational Works Application to MCU13 0098 42 Hofmann Drive Noosaville.

of 13

Text shows just the words. Original shows the document exactly as it was published.

                                                      Sunshine Coast Regional Council ABN J7 876 973 911
Sunshine Coast                                        locked A 9 12 Sur~r ne Coa8t Mall Centre Qld 45o0
                                                      T 07 5475 727'2 F 01 5415 1211 rna ,..~sunsh ecoast qld gov a•,
                                                      www.sunshinecoast.qld gov au


                                                          Officer:                   Glen Conforti
                                                          Direct Telephone:          (07) 5449 5379
                                                          Our Reference:             GC007:TS:MCU13/0098
                                                          Your Reference:            n/a

         2 October 2013


         Soul Space
         23 Paluma St
         SUNRISE BEACH QLD 4567


         Dear Sir/Madam

                                                   Decision Notice
                                            Sustainable Planning Act 2009

         I refer to your application and advise that on 30/09/2013, Council decided to approve the
         application in full subject to conditions .

          Details of the decision are as follows:

        11.        APPLICATION DETAILS


         Application No:                        MCU13/0098
         Street Address:                        42 Hofmann Dr NOOSAVILLE QLD 4566
          Real Property Description:            Lot 2 SP 222982
          Planning Scheme:                      The Noosa Plan (8 August 2011)

        I 2.        DECISION DETAILS

          The following type of approval has been issued:

          Development Permit for a Material Change of Use of Premises - Industrial Business
          Type 2 Production, alteration, repackaging & repairing

        I 3.        RELEVANT PERIOD OF APPROVAL

          The relevant period for this development approval is 4 years starting the day that this
          development approval takes effect.

        I 4.       ASSESSMENT MANAGER CONDITIONS

          PLANNING

                    When Conditions must be Complied With
          1.        All conditions of REC12/01 06 must be complied with and the plan of survey
                    sealed prior to the use commencing .


          PD-DA-FM1420s/4-01 /10/2013                                                                             Page 1 of 11

 Caloundra office • Orlrc. '1 Avem.. e C<.~loJnd i:l Qld 455• Maroochydore office 11 -P Ocear St eet Maroochy re Q d 45FJ8
 Nambour office Cn Cu ne and BJry St•ec•s 'IJ<.~r1bour Q d 4560     Tewantin office 9 Pc c n Street Tew<.~nt1r Old 4565
Full text of the other 12 pages

Page 2

                                                                                 MCU13/0098



2.       Unless otherwise stated, all conditions of this Decision Notice must be complied
         with prior to the use commencing , and then compliance maintained at all times
         while the use continues.
         Approved Plans
3.       Development authorised by this approval must be undertaken generally in
         accordance with the Approved Plans listed within this Decision Notice. The Plans
         must be amended to incorporate the amendments listed within this Decision
         Notice and resubmitted to Council prior to the issue of any Development Permit
         for Operational Works*.
          *(Refer to Advisory Note)

         Building Height

4.       The maximum height of the development must not exceed 8 metres above the
         finished ground level and natural ground surface.
5.       Certification must be submitted to Council from a Licensed Surveyor which
         certifies that the building does not exceed the maximum height requirement of
         this Decision Notice.
          Performance Bond
6.       Security in the form of a cash bond or trading bank guarantee to the sum of
         $5000 must be submitted to Council , to secure performance of all conditions of
         this approval, prior to the issue of a Development Permit for Operational Works .
         The cash bond or trading bank guarantee will be returned on performance of the
         conditions of approval less any costs incurred by Council in respect of enforcing
         performance of this permit. Council reserves the right to call upon the bond or
         guaranteed sum to effect compliance with conditions .
          Street Identification
7.        The street address of the development must be clearly visible and discernible
          from the primary frontage of the site by the provision of a street number and ,
          where appropriate, the building name.
          Building Appearance
8.        The building must incorporate a minimum of 600mm eaves to the front and side
          elevations (north , south & east elevations). Amended plans must be submitted
          prior to the issue of a Development Permit for Operational Works
9.        The roof and walls indicated on the approved plans as "colorbond metal wall
          finish " must not be plain galvanised in colour. In this regard the colour palette for
          the development must be submitted to Council for approval prior to the issue of a
          Development Permit for Operational Works .
          Signage
10.       All advertising signage must comply with the Advertising Devices Code.
LANDSCAPING
11.       The development site must be landscaped . The works must be undertaken in
          accordance with an Operational Works approval and The Noosa Plan 's Planning
          Scheme Policy 3 Landscaping Plants and Guidelines for that specific area and
          must include in particular:




PO-OA-FM1420s/4-01/1 012013                                                             Page 2 of 11

Page 3

                                                                                    MCU13/0098



         (a)        The works shown on the approved Landscape Design 2 Planting Layout
                    plan , except where amended by conditions contained herein
         (b)        The provision of 4 with a minimum pot size of 45L native tree species
                    within the carpark area to screen the bulk of the development and provide
                    shade to the carpark
          (c)       All plantings near storm water infrastructure are to be coordinated with the
                    approved hydraulics plans and must not interfere with the operational
                    function of the storm water devices, either by root interference, shading or
                    other means.
          (d)       Landscaping plans must show the location of all water quality devices
          (e)       Vegetated screening of any hydrants/transformers/bin areas/or other
                    bulky infrastructure from Rene Street, designed such that 60% of the
                    infrastructure will be screened within 3 years OR at maturity
          (f)       Maintenance access to the side and rear boundary landscaping areas.
12.       All landscape works must be established and maintained in accordance with the
          approved design for the life of the development, and in a manner that ensures
          healthy, sustained and vigorous plant growth. All plant material must be allowed
          to grow to full form and be refurbished when its life expectancy is reached .
ENGINEERING
          Access, Carparking and Bicycle facilities
13.       A minimum of 26 car parking spaces must be provided and marked on the site
          and made available and accessible at all times while the use is open for
          business.
14.       Sealed parking areas, loading bays and access driveway must be generally in
          accordance with the approved plans and take into consideration other relevant
          development permits associated with this site. The works must be undertaken in
          accordance with an Operational Works approval and must include but not limited
          to the following :
          (g)       Vehicle access is limited to the constructed driveway only.
          (h)       The staff parking spaces be marked and sign posted .
          (i)       A disable parking space marked and signed posted in accordance with
                    the current engineering standards.
          U)        Signage must be provided to direct visitors and customers to the car
                    parking , bicycle and motorcycle spaces provided on site as may be
                    necessary.
          (k)        Provision of vandal resistant public lighting with intensities to satisfy the
                     requirements of Australian Standard AS1158 : Public Lighting Code.
          All parking areas and access driveways must be maintained exclusively for
          vehicle parking and manoeuvring and kept in a tidy and safe condition at all
          times.
15.       The access to the carpark and loading bays must not be restricted by a security
          gate.




PD-OA-FM1420sf4-01 f 10(2013                                                              Page 3 of 11

Page 4

                                                                                   MCU13/0098



16.      Bicycle facilities in accordance with AS2890.3 Bicycle Parking Facilities must be
         provided for the development. The facilities must be indicated on the plans and
         submitted in accordance with an Operational Works approval and must include in
         particular:
         (a)        a total of 19 bicycle parking spaces
         (b)        end of trip facilities involving a minimum of 10 lockers and 1 shower
                    cubicle with an ancillary change room.
          Earthworks and Retaining Walls
17.      All retaining walls must be designed and constructed in accordance with the
         planning scheme and must be certified by an RPEQ where exceeding 1.0m in
         height.
HYDRAULICS AND WATER QUALITY
          Stormwater Drainage
18.       The site must be provided with a stormwater drainage system connecting to a
          lawful point of discharge. The works must be undertaken in accordance with an
          Operational Works approval and QUDM, and must include in particular:
          (a)       the works shown on the Referenced Plans listed in this Decision Notice
          (b)       collection and discharge of stormwater to the existing stormwater
                    easement along the frontage of the site.
          (c)       the use of gravity stormwater drainage and not surcharge pits.
          Stormwater Quality Management
19.       A stormwater quality treatment system must be provided for the development.
          The works must be undertaken in accordance with an Operational Works
          approval and the Bioretention Technical Design Guidelines (Water by Design ,
          20 12), and must include in particular:
          (a)       stormwater quality treatment devices of a size and location generally in
                    accordance with those shown on the integrated water cycle management
                    plans listed in this Decision Notice
          (b)       bioretention devices which :
                    (i)       are designed generally in accordance with IPWEQA Standard
                              Drawing No. WSUD-001
                    (ii)      are provided with a free-draining outlet from the sub-soil drainage
                              system
20 .      Permanent educational signage* must be erected to educate the customers to
          the development about the function of the bioretention device(s).           The
          dimensions, standard, presentation and location of the educational signage must
          be in accordance with an Operational Works approval.
          *(Refer to Advisory Note)
21.       All stormwater quality treatment devices must be maintained in accordance with
          the Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version
          1). The approved Operational Works drawings for the stormwater quality
          treatment system and detailed life cycle costing of the system must be attached




PD-DA-FM1420s/4-0 1/10/2013                                                              Page 4 of 11

Page 5

                                                                                 MCU13/0098



          as an addendum to this document. Records of all maintenance activities
          undertaken must be kept and made available to Council upon request.
          Stormwater Harvesting
22.       Operating stormwater harvesting tanks must be provided for the development.
          The tanks must be provided in accordance with an Building Works approval and
          must include in particular:
          (a)       the details identified in drawing 2783-2 of the integrated water cycle
                    management plan listed in this Decision Notice
          (b)       a total tank capacity of 22 500 litres
          (c)       a catchment of 90% of the building roof area
          (d)       a distribution of 50% of the total capacity for stormwater harvesting and
                    the balance for detention purposes
          (e)       re-use of harvested stormwater for internal non-potable uses and outdoor
                    uses.
ENVIRONMENT
          Waste Management
23.       Refuse storage, removal and collection facilities must be provided in accordance
          with the following:
          (f)       Provision of separate bins (2401 wheelie bins or 1.1 m3 bulk bins) for
                    general and recyclable waste for the site.
          (g)       Collection by service vehicles from within the site or from the kerbside of
                    the internal service road.
          (h)       Provision of a hardstand impervious area within the site for the permanent
                    storage location of the bins, having minimum dimensions of 0.36 m2
                    (600mm x 600mm) per wheelie bin or minimum dimensions of 0.36 m2
                    (600mm x 600mm) per bulk bin.
          (i)       Provision of a 1.5m high purpose built enclosure to the storage location
                    which is screened from the street.
                    Provision of a wash-down area in the vicinity of the permanent storage
                    location fitted with a hose-cock and a drain connected to the sewer that
                    has a stormwater catchment area of no more than 1m 2 •
UNITYWATER
24.       Connection to Unitywater live water mains and the Unitywater live sewer system
          must be undertaken by Unitywater at the applicants cost.
25.       Construction activities must not impede the access of Unitywater or Fire Brigade
          personnel to vital infrastructure (eg. valves, fire hydrants and sewer access
          chambers).
26.       The fire-fighting demand on Unitywater's water supply system from the
          development must not exceed 30 litres per second .
27.       A single Unitywater installed primary water meter must be provided immediately
          inside the property boundary. Additional water meters must be installed for each
          title of a community title or sub-lease scheme. Meters must be Unitywater




PO-OA-FM1420s/4-01 /1 0/2013                                                           Page 5 of 11

Page 6

                                                                                MCU13/0098



          approved , installed in accordance with Unitywater requirements and remain
          accessible at all times for reading and maintenance purposes.
 28.      Water meters must be located on alternative boundaries to electrical pillars.
 29.      Buildings and other structures must maintain a minimum clearance of 1.5 metres
          from Unitywater sewer mains, and 1.0 metre from a sewer manhole chamber or
          sewer inspection opening.
 30 .     Storm water retention systems and gross pollutant traps must maintain a
          minimum clearance of 1.5 metres from Unitywater water supply and sewerage
          infrastructure.
 31 .     Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
          Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
          Landscaping plants within these clearances must be low growing when mature,
          and suitable approved varieties .
 32.      Construction works undertaken in the vicinity of Unitywater water supply or
          sewerage infrastructure must not adversely affect the integrity of the
          infrastructure. All costs associated with repair, replacement or alteration of
          infrastructure must be met by the applicant.
 33.      A Trade Waste permit is required prior to any storm water, groundwater or sump
          pump discharge into Unitywater's sewerage system .
 34.      Plans and documentation must be submitted to Unitywater with a completed
          application for a trade waste permit. This is required prior to obtaining a plumbing
          approval from Council.


I 5.    REFERRAL AGENCIES

 Not Applicable.

I 6.    APPROVED PLANS

 The following plans are Approved Plans for the development:

 Approved Plans
 Plan No.           Rev.      Plan Name                                       Date
 DA01               B         Site Plan, prepared by Soul Space Building      14 June 2013
                              Design
 DA03               B         Mezzanine Plan , prepared by Soul Space         14 June 2013
                              Building Design

 The following plans require amendment prior to becoming Approved Plans for the
 development:

 Plans Requiring Amendment
 Plan No.                             Rev.   Plan Name                                    Date
 DA02                                 B      Ground Floor Plan , prepared by Soul         14 June
                                             Space Bu ilding Design                       2013




 PD-DA-FM1420s/4-01/10/2013                                                           Page 6 of 11

Page 7

                                                                                 MCU13/0098



                      Amendments     1. Include bicycle spaces and end of trip facilities
 DA04                                B      Roof Plan, prepared       by Soul    Space      14 June
                                            Building Design                                 2013
                      Amendments     1. Include eaves to the front and side elevations of the
                                        building
 DA05                                B      Elevations, prepared by Soul Space 14 June
                                            Building Design                         2013
                      Amendments     1. Include eaves to the front and side elevations of the
                                     building .

17.     REFERENCED DOCUMENTS

 The following documents are referenced in the assessment manager conditions :

 Referenced Documents
 Document No.           Rev.   Document Name                                       Date
 2783-2                        Stormwater Drainage and Quality, prepared by        11-07-13
                               Construction Hydraulics
 2783-3                        Stormwater Quality Details, prepared by             11-07-13
                               Construction Hydraulics
 2783-4                        Stormwater Quality Maintenance , prepared by        11-07-13
                               Construction Hydraulics
 A3                            Landscape Design 2 Planting Layout, prepared        12/09/2013
                               by Greenscapes Nursery & Design

I 8.    ADVISORY NOTES

 The following notes are included for guidance and information purposes only and do not
 form part of the assessment manager conditions:

 ENVIRONMENT
 1.       Food preparation areas must be constructed and equipped in accordance with
          the provisions of the Food Act 2006 and the Food Standards Code. The operator
          of the premises must be licenced in accordance with the Act and the premises in
          compliance with the code prior to the use commencing . Please Contact Council's
          Healthy Places Unit via the Customer Service Centre for further information and
          the licence application form .
 ENGINEERING
          Building and Construction Industry (Portable Long Service Leave) Levy
 1.       The Building and Construction Industry (Portable Long Service Leave) Levy must
          be paid prior to the issue of a development permit where one is required for the
          'Building and Construction Industry' . This applies to Building Works, Operational
          Works and Plumbing and Drainage Works applications, as defined under the
          Sustainable Planning Act 2009, where the works are $80 ,000 or more and
          matching the definition of 'Building and Construction Industry' under the Building
          and Construction Industry (Portable Long Service Leave) Act 1991. Council will
          not be able to issue a Decision Notice without receipt of details that the Levy has




 PD-DA-FM1420s/4-01/10/2013                                                            Page 7 of 11

Page 8

                                                                                  MCU13/0098



             been paid. Should you require clarification in regard to the amendments to the
             Building and Construction Industry (Portable Long Service Leave) Act 1991 , you
             should contact Qleave on 1800 803 481 (free call) or (07) 3212 6855.
             Co-ordination of Operational Works Assessment
 2.          To assist Council to undertake an integrated assessment of the operational
             works application, all aspects of the works must be included in one (1) application
             and be in accordance with Council's planning scheme. Additional application fees
             apply to applications where the different aspects of the works are lodged
             separately. Significant savings in application fees will result if all works are
             lodged in a single application.
             Preparation of a Preliminary Construction Management Plan
 3.          The works identified in this Decision Notice will be required to be carried out in
             accordance with a Construction Management Plan endorsed by Council through
             an approval for Operational Works . To ensure expedient assessment of any
             Operational Works application , the applicant is advised to submit a preliminary
             Construction Management Plan that addresses the requirements of the planning
             scheme. In particular, the preliminary Construction Management Plan should
             address the following :
       (a)        provisions that ensure the proposed construction does not unduly impact on
                  the surrounding area and ensure the site is safe for members of the public,
                  implementing appropriate traffic signage in accordance with the Manual of
                  Uniform Traffic Control Devices (MUTCD) and making provision for safe
                  pedestrian access across the frontage of the site both during daily
                  construction and after daily construction has ceased .
       (b)        it is acknowledged that the Construction Management Plan will be a draft
                  document requiring finalisation upon appointment of the Principal Contractor
                  employed to construct the works and a final document will be required to be
                  submitted at the Pre-Start Meeting for the project.
             Qualified Person
 4.          For the purpose of certifying that the design of the stormwater harvesting system
             is in accordance with the requirements of this decision notice, a qualified person
             is considered to be a Registered Professional Engineer of Queensland (RPEQ),
             builder or plumber.


I 9.     PROPERTY NOTES

 Not Applicable.

j10.     PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME

 Not Applicable.




 PO·OA-FM 1420s/4-01 / 1012013                                                          Page 8 of 11

Page 9

                                                                             MCU13/0098



l11.       FURTHER DEVELOPMENT PERMITS REQUIRED

 •     Development Permit for Operational Work (Access, Stormwater, Earthworks,
 Landscaping )
 •     Development Permit for Building Work (All Building Works)

l12.       SELF ASSESSABLE CODES

 The following codes for self-assessable development related to the development
 approval issued under this Decision Notice must be complied with.

       •    Advertising Devices Code

l13.       SUBMISSIONS

 There were no submissions about the application.

l14.       REASONS I GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME

 Not Applicable.

l15.       RIGHTS OF APPEAL

 You are entitled to appeal against this decision. A copy of the relevant appeal provisions
 from the Sustainable Planning Act 2009 is attached.

 During the appeal period, you as the applicant may suspend your appeal period and
 make written representations to Council about the conditions contained within the
 development approval. If Council agrees or agrees in part with the representations, a
 "negotiated decision notice" will be issued. Only one "negotiated decision notice" may
 be given. Taking this step will defer your appeal period, which will commence again
 from the start the day after you receive a "negotiated decision notice".

l16.       OTHER DETAILS

 If you wish to obtain more information about Council's decision, electronic copies are
 available on line at www.sunshinecoast.qld .gov.au, or at Council Offices.

 Yours faithfully

 C>~JL__
 DENIS WALLACE
 SENIOR DEVELOPMENT PLANNER

 Cc         Unitywater

 Enc:       Adopted Infrastructure Charge Notice
            Approved Plans/Documents
            Appeal Rights




 PD-DA-FM1420s/4-01/1 012013                                                       Page 9 of 11

Page 10

                                                                                                        MCU13/0098




Sunshine Coast                                         Appeal Rights
I
Regional Council
                                                       SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING
                                                       REGULATION 2009



The following is an extract from the Sustainable Planning Act 2009 (Chapter 7).
MATERIAL CHANGE OF USE, RECONFIGURING A LOT & OPERATIONAL WORKS

Division 8          Appeals to court relating to development applications and approvals

461     Appeals by applicants
(1)     An applicant for a development application may appeal to the court against any of the following-
        (a) the refusal, or the refusal in part, of the development application;
        (b) any condition of a development approval, another matter stated in a development approval and the
             identification or inclusion of a code under section 242 ;
        (c) the decision to give a preliminary approval when a development permit was applied for;
        (d) the length of a period mentioned in section 341 ;
        (e) a deemed refusal of the development application.
(2)     An appeal under subsection (1 )(a), (b), (c) or (d) must be started within 20 business days (the applicant's appeal
        period) after-
        (a) if a decision notice or negotiated decision notice is given-the day the decision notice or negotiated decision
             notice is given to the applicant; or
        (b) otherwise-the day a decision notice was required to be given to the applicant.
(3)     An appeal under subsection (1 )(e) may be started at any time after the last day a decision on the matter should
        have been made.

462     Appeals by submitters-general
(1)     A submitter for a development application may appeal to the court only against-
         (a) the part of the approval relating to the assessment manager's decision about any part of the application
              requiring impact assessment under section 314; or
         (b) the part of the approval relating to the assessment manager's decision under section 327.
(2)      To the extent an appeal may be made under subsection (1 ), the appeal may be against 1 or more of the
         following-
        (a) the giving of a development approval ;
        (b) any provision of the approval including-
              (i)  a condition of, or lack of condition for, the approval ; or
              (ii) the length of a period mentioned in section 341 for the approval.
(3)     However, a submitter may not appeal if the submitter-
        (a) withdraws the submission before the application is decided ; or
        (b) has given the assessment manager a notice under section 339(1 )(b)(ii).
(4)   The appeal must be started within 20 business days (the submitter's appeal period) after the decision notice or
      negotiated decision notice is given to the submitter.

463 Additional and extended appeal rights for submitters for particular development applications
(1) This section applies to a development application to which chapter 9, part 7 applies.
(2) A submitter of a properly made submission for the application may appeal to the court about a referral agency's
    response made by a prescribed concurrence agency for the application.
(3) However, the submitter may only appeal against a referral agency's response to the extent it relates to-
    (a) if the prescribed concurrence agency is the chief executive (environment)-development for an aquacultural
          ERA; or
    (b) if the prescribed concurrence agency is the chief executive (fisheries )-development that is-
          (i)  a material change of use of premises for aquaculture; or
          (ii) operational work that is the removal , damage or destruction of a marine plant.
(4) Despite section 462(1 ), the submitter may appeal against the following matters for the application even if the matters
    relate to code assessment-
    (a) a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries);
    (b) a referral agency's response mentioned in subsection (2).

464 Appeals by advice agency submitters
(1) Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat
    the response as a properly made submission .
(2) The advice agency may, within the limits of its jurisdiction , appeal to the court about-
    (a) any part of the approval relating to the assessment manager's decision about any part of the application
         requiring impact assessment under section 314; or
    (b) any part of the approval relating to the assessment manager's decision under section 327.
(3) The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is
    given to the advice agency as a submitter.




PO-OA-FM1420s/4-01 / 10/2013                                                                                   Page 10 of 11

Page 11

                                                                                                      MCU13/0098


(4)   However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice
      agency may not appeal the decision.

465 Appeals about decisions relating to extensions for approvals
(1) For a development approval given for a development application, a person to whom a notice is given under section
    389, other than a notice for a decision under section 386(2), may appeal to the court against the decision in the
    notice.
(2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person.
(3) Also, a person who has made a request under section 383 may appeal to the court against a deemed refusal of the
    request.
(4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have
    been made.

466 Appeals about decisions relating to permissible changes
(1) For a development approval given for a development application , the following persons may appeal to the court
    against a decision on a request to make a permissible change to the approval-
    (a) if the responsible entity for making the change is the assessment manager for the application-
         (i) the person who made the request; or
         (ii) an entity that gave a notice under section 373 or a pre-request response notice about the request;
    (b) if the responsible entity for making the change is a concurrence agency for the application-the person who
         made the request.
(2) The appeal must be started within 20 business days after the day the person is given notice of the decision on the
    request under section 376.
(3) Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the
    request.
(4) An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have
    been made.

467 Appeals about changing or cancelling conditions imposed by assessment manager or concurrence agency
( 1) A person to whom a notice under section 378(9)(b) giving a decision to change or cancel a condition of a
     development approval has been given may appeal to the court against the decision in the notice.
(2) The appeal must be started within 20 business days after the day the notice of the decision is given to the person .




PO-OA-FM1420s/4-01 /10/2013                                                                                 Page 11 of 11

Page 12

                                                                                  Locked Bag 72, Sunshine Coast Mail Centre, QLD 4560
                                                                                  Phone (07) 5475 7272         Fax (07) 5475 7277
                                                                                  ABN 37 876 973 913



                 ADOPTED INFRASTRUCTURE CHARGE NOTICE
To :        Soul Space
            23 Paluma St
            SUNRISE BEACH            4567                                                    Date of Issue:   03 October 2013
                                                                                             Adopted Charge Notice No: 525
                                                                                             Rev No: 0


  LAND TO WHICH THE INFRASTRUCTURE CHARGE APPLIES:
  Planning Scheme:      The Noosa Plan
  Property Description: Lot 2 SP 222982
  Property Address:     42 Hofmann Dr NOOSAVILLE

  DEVELOPMENT TO WHICH THE ADOPTED INFRASTRUCTURE CHARGE APPLIES
  The adopted infrastructure charge applies to the following development type: Material Change of Use
  Development Approval/Compliance reference number: MCU1310098

  AMOUNT OF THE ADOPTED INFRASTRUCTURE CHARGE
  •     The adopted infrastructure charge has been calculated in accordance with an adopted infrastructure charges resolution
        under the Sustainable Planning Act 2009.
  •     The amount of the adopted infrastructure charge is to be escalated in accordance with relevant legislation from the date on
        the notice to the date of payment.


  ADOPTED INFRASTRUCTURE CHARGE AMOUNT (@Jun 2013 index)= $89,256.00

  APPORTIONMENT OF ADOPTED INFRASTRUCTURE CHARGE:

                               Allocation of adopted infrastructure charge to trunk infrastructure networks
       Entity
                                                                                            Charge           Offset I Rebate       Net Payable
                                                                                                                                 (@ Jun 2013 Index)

                  Water Supply                                                                       $0.00              $0.00                  $0.00
  Unitywater
                  Sewerage                                                                           $0.00              $0.00                  $0.00
                  Transport                                                                   $46,001 .00               $0.00           $46,001.00

                  Public Parks & Land for Community Facilities                                 $8,118.00                $0.00             $8,118.00
       Council
                  Stormwater (Residential)                                                           $0.00              $0 .00                 $0.00

                  Stormwater (Non-Residential)                                                $35,137.00                $0.00            $35,137.00
                                                                            TOTAL-
                                                                                              $89,256.00                $0.00           $89,256.00
                                 (Subject to indexation applicable at date of payment)

  Basis of rebate:

  PAYMENT OF THE ADOPTED INFRASTRUCTURE CHARGE
  •     The adopted infrastructure charge is payable in accordance with the Sustainable Planning Act 2009.
  •     The due date for payment of the adopted infrastructure charge is: Before the Change of Use happens.
  •     The charge is to be paid to Sunshine Coast Regional Council via the Infrastructure Charges Officer, tel: (07) 5441 8679.
        Please contact Sunshine Coast Regional Council, Infrastructure Policy Branch, prior to making payment.
  •     Compound annual interest at 11% calculated daily is to be applied on an overdue charge.

  Notice is hereby given under the Sustainable Planning Act 2009 and the Local Government Act 2009 that the adopted infrastructure charge
  notice is levied by the Sunshine Coast Regional Council on the described land . The adopted infrastructure charge is DUE AND PAYABLE BY
  THE ABOVE DATE . The adopted infrastructure charge plus any arrears and interest may be recovered by legal process without further notice if
  unpaid after the expiration of the DUE DATE.

Page 13

                       ADOPTED INFRASTRUCTURE CHARGE
                                   NOTICE
                              IMPORTANT NOTICE

      1. PAYMENT

          This notice is due and payable by the due date shown. Cheques, money orders or postal
          notes should be made payable to Sunshine Coast Regional Council and crossed "Not
          Negotiable". Change cannot be given on cheque payments. Property owners will be liable for
          any dishonour fees.

     2. ADOPTED INFRASTRUCTURE CHARGES TAKEN TO BE A RATE:
        An adopted infrastructure charge levied by a local government is, for the purposes of recovery,
        taken to be a rate within the meaning of the Local Government Act 1993. This means:
        a.   an adopted infrastructure charge may be recovered by court action for a debt;
        b.   an adopted infrastructure charge may be recovered from the person for the time being
             owning the relevant land, regardless of who was the owner or other person upon whom
             the charges was imposed;
        c.    Interest is payable on overdue payments; and
        d.    If charges are unpaid for 3 years, the land can be sold to recover the outstanding
             charges.

     3. INTEREST:
        Compound interest at the rate of 11% per annum calculated daily is payable on all
        infrastructure charges outstanding after the due date shown on this charges notice.

     4. OVERSEAS PAYEES:
        Please forward your infrastructure charges payment by way of a bank draft for the required
        amount in Australian dollars.

      5. GOODS AND SERVICES TAX:
         The federal government has determined that rates and utility charges levied by local
         government will be GST free. Accordingly, no GST is included in this infrastructure charges
         notice.

     6. ADOPTED INFASTRUCTURE CHARGE IS SUBJECT TO PRICE VARIATION:
        The amount of the adopted infrastructure charge is subject to escalation in accordance with
        relevant legislation from the date of the notice until the date the payment is made.
          PLEASE CONTACT THE INFRASTRUCTURE CHARGES OFFICER BEFORE MAKING
          PAYMENT FOR UPDATED CURRENT AMOUNT

     7. INFRASTRUCTURE CHARGES ENQUIRIES:
        Enquiries regarding this infrastructure charges notice should be directed to Council's office,
        Phone (07) 5441 8679, during office hours or e-mail: [email protected] OF PAYMENT
 ~~~fi~!~~~Bc~r~~~L~pplicable lnfra~:~u:tur~1!
  Charge and mail immediately with your
, payment to:
                                                 PAYMENT AT COUNCIL OFFICES


                                                 Regional    Council    Customer
                                                                                          _ l_ _ - -
                                                 Present this notice intact with an updated
                                                 payment advice notice to Sunshine Coast
                                                                                     Service
                                                                                                   PAYMENTS METHODS NOT ACCEPTED

                                                                                                                accepted
                                                                                                   Infrastructure Charges.
                                                                                                                           for
                                                                                                                                  -- - -
                                                                                                   Payments via credit card transactions will
                                                                                                   not    be                   payment    of
                                                                                                                                              1




                                                                                                                                              ·
  Sunshine Coast Regional Council,
: Locked Bag 72.
                                        '
                                          Co""tec.                                             I                                              !
' Sunshine Coast Mail Centre QLD 4565.


                                                                                               J                                           __ j

Used in these records

About this file

File size
436 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

4. MCU130098 Decision Notice (approval).pdf · 436 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.