Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

4. MCU130098 Decision Notice (approval) · MCU13/0098

Attached to the e-mail Operational Works Application to MCU13 0098 42 Hofmann Drive Noosaville.

of 13

Text shows just the words. Original shows the document exactly as it was published.

                                                                                  MCU13/0098



             been paid. Should you require clarification in regard to the amendments to the
             Building and Construction Industry (Portable Long Service Leave) Act 1991 , you
             should contact Qleave on 1800 803 481 (free call) or (07) 3212 6855.
             Co-ordination of Operational Works Assessment
 2.          To assist Council to undertake an integrated assessment of the operational
             works application, all aspects of the works must be included in one (1) application
             and be in accordance with Council's planning scheme. Additional application fees
             apply to applications where the different aspects of the works are lodged
             separately. Significant savings in application fees will result if all works are
             lodged in a single application.
             Preparation of a Preliminary Construction Management Plan
 3.          The works identified in this Decision Notice will be required to be carried out in
             accordance with a Construction Management Plan endorsed by Council through
             an approval for Operational Works . To ensure expedient assessment of any
             Operational Works application , the applicant is advised to submit a preliminary
             Construction Management Plan that addresses the requirements of the planning
             scheme. In particular, the preliminary Construction Management Plan should
             address the following :
       (a)        provisions that ensure the proposed construction does not unduly impact on
                  the surrounding area and ensure the site is safe for members of the public,
                  implementing appropriate traffic signage in accordance with the Manual of
                  Uniform Traffic Control Devices (MUTCD) and making provision for safe
                  pedestrian access across the frontage of the site both during daily
                  construction and after daily construction has ceased .
       (b)        it is acknowledged that the Construction Management Plan will be a draft
                  document requiring finalisation upon appointment of the Principal Contractor
                  employed to construct the works and a final document will be required to be
                  submitted at the Pre-Start Meeting for the project.
             Qualified Person
 4.          For the purpose of certifying that the design of the stormwater harvesting system
             is in accordance with the requirements of this decision notice, a qualified person
             is considered to be a Registered Professional Engineer of Queensland (RPEQ),
             builder or plumber.


I 9.     PROPERTY NOTES

 Not Applicable.

j10.     PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME

 Not Applicable.




 PO·OA-FM 1420s/4-01 / 1012013                                                          Page 8 of 11

Used in these records

About this file

File size
436 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

4. MCU130098 Decision Notice (approval).pdf · 436 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.