Skip to the record
Every meeting, every word.

Council archive · source document

Request for Further Information - 010.2008.00001787.001 [As Published] · 132008.1787

of 5

Text shows just the words. Original shows the document exactly as it was published.

                                            -4-


18.   Preliminary written details of the anticipated construction period, anticipated traffic
      impacts due to construction and measures to be undertaken to minimise interruption
      to Hastings Street traffic flow, residents and businesses.


Land Development
Carparking
19.   Demonstrate how vehicles can pass at the two internal 90 corners of the access
      driveway. The vehicle paths and vehicles sizes shall be in accordance with AS/NZS
      2890.1:2004.
20.   Demonstrate how vehicles parked in proposed spaces 8 & 15 can reverse from the
      space and exit the aisle in a forward gear in a total of 2 movements.
21.   Demonstrate how vehicles can manoeuvre and exit the site in a forward gear if the
      security gate is closed and all of spaces 1-2 and 9-15 are occupied. The manoeuvring
      must be in a total of 3 movements (forward gear entry, reverse and forward gear exit).
22.   Demonstrate how a motorbike parked in the rear isolated parking space of the four
      can exit the space when all spaces are occupied.
Site/building stability
23.   Please provide comment from a suitably qualified geotechnical/structural engineer
      with regard to the site location and the possible affects of wave action and water
      inundation in a major storm event.
Sewer
24.   It is noted that a Council sewer main traverses the development site. The
      development plans show buildings located over the sewer. Provide plans showing
      buildings designed clear of the Council sewer within the development site, or a
      diversion of the sewer. A sewer diversion will require plans and longitudinal sections
      of the diverted sewer, the relationship to the proposed building and an easement over
      the sewer in accordance with the Noosa Plan - Planning Scheme Policy No. 6.
      Please note that No buildings or structures are permitted to be located within a sewer
      easement.
Stormwater
25.   There is a discrepancy between the architectural plans and the stormwater
      management plans with regard to the location and extent of the retention and
      detention tanks. Please provide consistent plans.
Works
26.   Confirm that separate male & female shower / change facilities and lockers will be
      provided for staff.
27.   Demonstrate that the ramped public access path along the western boundary is
      compliant with the Disability Discrimination Act.
28.   Demonstrate that the Bicycle parking spaces comply with AUSTROADS Guide to
      Traffic Engineering Practice, Part 14 – Bicycles, Section 10 and provide details of the
      proposed security category level to be provided.
Building
29.   A report addressing Probable Solutions S1.1 to S1.6 if the Building Removal,
      Relocation & Demolition Code.

Used in these records

About this file

File size
24 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Request for Further Information - 010.2008.00001787.001 [As Published].pdf · 24 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.