Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

W6107 de f15.pdf - form 15 frame design · OPW16/0220

Attached to the e-mail Operational works application OPW16/0220.

of 5

Text shows just the words. Original shows the document exactly as it was published.

MASONRY SPECIFICATION.

Construction:                masonry work to comply with AS3700.
Masonry Unit Strength:       f'uc = 15mPa (unconfined strength)
Mortar:                      cement 1, lime 1/2, sand 41/2 + methyl cellulose water
thickener
Grout:                       f'c = 20mPa (confined test) with 10mm aggregate with pouring
                                     consistency & a minimum cement content of
300kg/cubic metre
Steelwork cover:                        as indicated on drawings but not less than 20mm from
                                the face of the grout to the reinforcement face.
Reinforcement laps:             deformed bars - 40 times* bar diameter
Grout placement & compaction, careful placement to avoid segregation & disturbance of
mortar joints and compact with a 25mm rod. Note - all lintels must be fully propped during &
for a minimum of 14 days (or for longer if required) after the construction of upper walls,
slabs, roofs or other structural elements.




W6107 de                                     5

Used in these records

About this file

File size
429 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

W6107 de f15.pdf - form 15 frame design.pdf · 429 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.