Change to an Existing Approval
Integrated Planning Act 1997
I refer to your request to make a change to an existing approval. On 18 April 2008 Council decided
your requested changes.
Details of the decision with the consolidated conditions are as follows:
1 APPLICATION DETAILS
Application No: 22441 DA
Street address: 10 Park Road, Noosa Heads
Real property description: Lot 55 RP 52918
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
Council on 12 June 2003 decided to issue the following type of approval: -
Development Permit for Material Change of Use - Dwelling
In relation to the request to make a change to the existing approval, Council on 13 December 2007
decided to:
A. Approve the change with amendment to Conditions 1, 10 and 21
B. Include the following additional Conditions: -
1. The driveway and garage are not approved in their current location and shall be sited in
accordance with the Footing Plan prepared for The Robertson Residence
2. A qualified arborist shall be present on site to supervise works around the root zones of all
trees required to be retained. Prior to commencing any works safety fences shall be
installed around the trunks and as much of the root zone as possible to minimise the risk
of compaction and damage.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 9 pages
Page 2
-2-
C. Refuse to change Condition 36.4 as the use of vibratory equipment is likely to adversely
impact on the slope and surrounding properties and the geotechnical report has not
satisfactorily addressed this matter
D. Issued a Compiled Decision Notice
In relation to the request to make a change to conditions of the Development Approval, Council on
18 April 2008 decided to:
A. Approve a change to Condition 10
B. Issue a Decision Notice – Change to an Existing Approval
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this development permit is 4 years from the date that this development
approval takes effect.
4 ASSESSMENT MANAGER CONDITIONS
Land Use
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are numbered WD.002 (Entry Tree
Study) dated January 2007, WD.003 Issue T1 (Tree Study) dated 09.10.07, WD.101 Issue T2
(Site Plan) dated 20.09.07, WD.201 Issue T2 (Basement Plan) dated 20.09.07, WD.202 Issue
T3 (Lift Landing) dated 20.09.07, WD.203 Issue T3 (Ground Floor) dated 20.09.07, WD.204
Issue T2 (First Floor) dated 20.09.07, WD.205 Issue T2 (Second Floor) dated 20.09.07 and
WD.601 Issue T2 (Section) dated 20.09.07 all prepared by Kidd & Co Designers as submitted
to Council on 11 October 2007, and as may be amended by these conditions.
2. The use and all activity on the site, including construction and excavation, is to be carefully
controlled and interference with vegetation kept to an absolute minimum to ensure that the
proposed use does not undermine or compromise the Noosa Hill Development Control Plan
and the Strategic Plan objective of preserving the natural character and appearance of Noosa
Hill. The approval is to be implemented with this objective as the overriding factor.
3. All roofing of the structures on site are to be of a non-reflective nature and coloured with
muted earth tones. All structures are to use colours that integrate with the natural
environment and be of muted earth tones of browns, greens, ochres, greys etc. A colour
scheme showing compliance with the above is to be submitted for approval prior to release of
the development permit for operational works.
4. The glass provided along the western elevation of the dwelling house is to be angled
downwards towards the slope of the site so as not to be reflective. Non reflective glass shall
also be utilised for the development.
5. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
6. The open space and setback areas are to be landscaped in accordance with Council’s Policy
on Landscaping Guidelines and a properly prepared landscape plan is to be prepared and
submitted for approval. The landscaping is to be completed prior to the premises being
occupied and maintained at all times thereafter. The landscape plan is to clearly indicate:-
6.1. the retention of vegetation and reinforcement planting of endemic species on the site;
and
6.2. the provision of shallow rooted vegetation above the underground garage with species
provided that are endemic to the Noosa Heads area; and
Page 3
-3-
6.3. the proposed means of protecting trees to be retained, particularly during the
construction process.
Additionally, the applicant is to submit a survey plan of existing vegetation on the site, where
this plan is to denote vegetation proposed to be removed and that proposed to be retained.
To this end, as indicated on plan 000705/B dated 16/07/02 and prepared by Ken Hicks &
Associates, only one substantial tree is to be removed. All trees identified on the plan for
retention are to be marked and numbered for retention prior to construction on site.
7. No fencing is permitted to be erected across the Park Road frontage of the site.
8. Security in the form of a cash bond or trading bank guarantee to the sum of $100000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for operational works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
9. The requirements of this development approval are to be satisfied, prior to the commencement
of the use of the premises. Council reserves the right to call upon the bond or guaranteed sum
referred to in this approval to effect compliance with conditions.
10. The Development Permit for a material change of use of premises lapses if the use has not
happened by 13 December 2009, unless an application to extend the currency is approved by
Council.
11. The developer must obtain all of the other Development Permits referred to in the Decision
Notice, prior to obtaining a Development Permit for building works.
Land Development
Vehicle Access
12. A vehicular access driveway to serve the site shall be constructed from the Park Road
frontage of the site with a maximum width of 3.0 metres.
The driveway shall be designed and constructed to Council’s design standards and to grades
that prevent vehicles from scraping and/or bottoming. Should any driveways be constructed to
grades that do not comply with AS2890.1-1993 and AS2890.2-1989, Council will require that
the driveway be removed and reconstructed to levels that do comply.
13. All vehicles shall enter and leave the site in a forward direction.
14. All vehicles shall enter the site via a right turn and exit the site via a left turn.
15. Council Officers must approve vegetation trimming within the road reserve required to improve
the sight distance in conjunction with the Development Permit for Operational Works (access).
However, no trees are to be removed from the road reserve.
Carparking
16. Carparking shall be provided within the site as shown on drawing number 81093B02/DD02 C
dated 3 December 2002 submitted by Ken Hicks and Associates, except as modified herein.
17. A minimum of 2 covered carpark spaces shall be provided on site.
18. The carparking area shall be designed to comply with the provisions of AS 2890.1-1993 for
user class 1 except the minimum head clearance (headroom) at any point shall be 2.3m.
Stormwater Drainage
19. All stormwater drainage shall be collected on site and discharged to Council’s existing
drainage structures on the eastern side of Park Road. The design shall incorporate some
means of reducing the head of the discharge prior to entry to Council’s system. In this regard,
plans shall be prepared by a Registered Professional Civil Engineer and submitted to Council
prior to obtaining a Development Permit for Operational Works.
Page 4
-4-
20. The stormwater drainage system shall be designed in accordance with plan titled, ‘Stormwater
& Sewerage Details, Robertson Residence’ by whaleycg consulting group.
21. The site shall be connected to Council’s existing sewerage reticulation systems in Park Road
and be constructed in accordance with Council’s standards and requirements at no cost to
Council.
To ensure Council’s sewer main is accessible for maintenance purposes and is protected from
risk of damage, no structures requiring a building permit (eg. buildings, retaining walls
exceeding 1m in height, raised terraces, etc) shall be constructed within the ‘zone of influence’
or within 1.5m of the centreline of the sewer main, whichever is the greater. As such the
applicant shall indicate the location of the sewer main and setback distance on the Building
plans to ensure compliance.
Sewer Mains
22. The site shall be connected to Council’s existing sewerage reticulation systems in Park Road
and be constructed in accordance with Council’s standards and requirements at no cost to
Council.
23. The sewerage system shall be designed in accordance with plan titled, Stormwater &
Sewerage Details, Robertson Residence’ by Whaleycg Consulting Group.
Town Water Supply
24. The site shall be connected to Council’s existing town water supply in Park Road and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
25. Each water connection to the water reticulation system shall extend to the property boundary
and be metered.
Geotechnical Issues/Construction
26. The disposal of sand, soil or any materials created by the construction of the dwellings shall
be removed in accordance with the Construction Management Plan with trucks greater than 5
metres in length not permitted. Details of the method of this disposal of materials are to be
submitted to Council at the Building Application stage. Not more than one vehicle at a
particular time will be parked in Park Road for the removal of, or the delivery of, materials
associated with the site and no such vehicle shall remain overnight. No materials are
permitted to be stored within the road reserve.
27. A programme of works is to be submitted with any application for any Development Permit for
Operational Works detailing the construction schedule and proposed environmental protection
measures, including a vegetation management plan, which addresses stabilisation of
disturbed areas.
Where the program is changed for any reason whatsoever, a copy of the revised program
shall be submitted to Council’s Works Inspector within seven (7) days.
28. A Traffic Management Plan for the Construction of the Dwelling addressing the access to the
site, the locating of equipment and any potential conflicts with local traffic shall be submitted
and approved by Council prior to Development Permit for Operational Works. It should be
noted that workers vehicles are to park in Allambi Rise, with no vehicles associated with the
construction of the dwelling permitted in Park Road.
29. Prior to the issue of a Development Permit for building works the builder shall submit written
acknowledgment that building works shall proceed in accordance with the 9 tonne load limit
applicable to Park Road, unless varied by Council.
30. At the completion of construction the consulting geotechnical engineer will certify that all works
were carried out in accordance with their recommendations and that the structures and the
site are stable.
Page 5
-5-
Erosion and Sediment Control
31. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
General
32. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
33. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
34. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
35. Where the existing retaining wall along the Park Road frontage of the site is removed to create
the driveway crossover the retaining wall shall be remediated immediately following the
completion of the earthworks for the driveway. A Development Permit for Operational Works
shall be obtained for these frontage works.
Building
36. The Geotechnical report submitted as part of your application has been appraised and
approved subject to the following conditions:-
36.1. There is to be no uncontrolled discharge of water onto the slope;
36.2. Stripping of vegetation for construction purposes should be minimised. If vegetation is
destroyed it should be reinstated immediately after that stage of construction is
completed;
36.3. Additional load due to fill, construction equipment or stockpiled materials should not be
located on the dune slope;
36.4. The use of vibratory equipment of any kind is not permitted to be used, including
vibrating rollers, the use of vibrating installation techniques for sheet piling and other
construction vibrations caused by excavating, earthmoving or demolition machinery or
other similar construction techniques;
36.5. All construction works on site shall accord with the Building Construction Report
prepared by Whaleycg Consulting Group dated December 2002 and the Morrisson
Geotechnic reports dated 1/9/00, 25/5/01.
36.6. A condition survey is to be carried out of adjoining buildings, structures and services
prior to any demolition works or construction works taking place on site. If distress
already exists, a photographic survey shall be undertaken, the distress measured and a
plan to monitor changes to distress shall be implemented. A copy of this report is to be
submitted to Council within 5 business days of survey and prior to construction work
proceeding;
36.7. Copies of all inspection reports by engineers are to be submitted to Council within 5
business days of the inspection taking place;
Page 6
-6-
36.8. A RPEQ is to be engaged by the client to oversee the piling works and copies of all
inspection reports are to be submitted to Council within 5 business days of the
inspection taking place;
36.9. The applicant’s Geotechnical engineer will be required to be on site for the whole of the
time during any excavation. The construction of the whole of the foundations is to be
supervised and directed on site by a consulting Geotechnical engineer. No work of any
such kind relating to the foundations shall be carried out if he is not on the site and
supervising and directing this work. Such works shall only be carried out during dry
weather conditions and if there is a risk of sand movement occurring, all work shall be
suspended until such steps, approved by the applicant’s Geotechnical engineer and the
Council’s Building Surveyor, have been taken to ensure that no further slippage will
result.
36.10.The builder, landscaper and all workers associated with construction of the works shall
at all times comply with the directions of the consulting geotechnical engineer.
37. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with the
minimum required floor level and the maximum building height above natural surface, required
by the provisions of the Planning Scheme.
Additional Conditions
1. The driveway and garage are not approved in their current location and shall be sited in
accordance with the Footing Plan prepared for The Robertson Residence
2. A qualified arborist shall be present on site to supervise works around the root zones of
all trees required to be retained. Prior to commencing any works safety fences shall be
installed around the trunks and as much of the root zone as possible to minimise the
risk of compaction and damage.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Nil
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
WD.002 Tree Entry Study – Kidd & Co Jan 07
Designers
WD.003 T1 Tree Study – Kidd & Co Designers 09.10.07
WD.101 T2 Site Plan – Kidd & Co Designers 20.09.07
WD.201 T2 Basement Plan – Kidd & Co Designers 20.09.07
WD.202 T3 Lift Landing – Kidd & Co Designers 20.09.07
WD.203 T3 Ground Floor – Kidd & Co Designers 20.09.07
WD.204 T2 First Floor – Kidd & Co Designers 20.09.07
Page 7
-7-
WD.205 T2 Second Floor – Kidd & Co Designers 20.09.07
WD.601 T2 Section – Kidd & Co Designers 20.09.07
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Building Works All Building Works
Development Permit for Operational Landscaping, Carparking, Access, Frontage Works,
Works Stormwater Drainage, Site Civil Works, Sewer
Reticulation & Water Reticulation
11 SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Nil
12 SUBMISSIONS
There were three (3) properly made submissions about the application.
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
Page 8
-8- During the appeal period, you as the applicant may make written representations to Council about the conditions contained within the development approval. If Council agrees or part agrees with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will continue after Council makes its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997). 15 OTHER DETAILS Should you wish to obtain more information about Council’s decision electronic copies of Council’s decision are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices. DECISION NOTICE HISTORY Original Decision Notice issued 12 June 2003. Compiled Decision Notice issued 13 December 2007 with amendment to Conditions 1, 10 and 21, additional Conditions 1 & 2 and refuse to change Condition 36.4. Decision Notice - Change to an Existing Approval (Change to conditions of approval) issued 18 April 2008 with amendment to Condition 10. Yours faithfully, Kerri Coyle SENIOR PLANNING OFFICER
Page 9
-9-
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
The following is an extract from the Integrated (5) If an application is processed under section
Planning Act (Chapter 4). 6.1.28(2), appeal rights for submitters for the
application are available only for the aspects of the
Division 8 - Appeals to court relating to
development that would have required public
development applications
notification under the repealed Act.
Appeals by applicants
(6) If an application involves assessment against a
4.1.27.(1) An applicant for a development application concurrence agency code, appeal rights for
may appeal to the court against any of the following- submitters for the application are not available against
(a) the refusal, or the refusal in part, of a development the part of the approval that represents the
application; concurrence agency’s response for the code.
(b) a matter stated in a development approval, Appeals by advice agency submitters
including any condition applying to the 4.1.29.(1) An advice agency may, within the limits of
development, and the identification of a code its jurisdiction, appeal to the court about the giving of
1
under section 3.1.6; a development approval for a development
(c) the decision to give a preliminary approval when a application if-
development permit was applied for; (a) the development application involves impact
(d) the length of a currency period; assessment; and
(e) a deemed refusal. (b) the advice agency told the applicant and the
(2) An appeal under subsection (1)(a) to (d) must assessment manager to treat its response to the
be started within 20 business days (the “applicant’s application as a submission for an appeal.
appeal period”) after the day the decision notice or (2) The appeal must be started within 20 business
negotiated decision notice is given to the applicant. days after the day the decision notice or negotiated
(3) An appeal under subsection (1)(e) may be decision notice is given to the advice agency as a
started at any time after the last day a decision on the submitter.
matter should have been made. Appeals for matters arising after approval given
Appeals by submitters (co-respondents)
4.1.28.(1) A submitter for a development application 4.1.30.(1) For a development approval given for a
may appeal to the court about- development application, a person to whom any of the
following notices have been given may appeal to the
(a) the giving of a development approval, including court against the decision in the notice-
any conditions (or lack of conditions) or other
provisions of the approval; or (a) a notice giving a decision on a request for
extension of the currency period for an approval;
(b) the length of a currency period for the approval.
(b) a notice giving a decision on a request to make a
(2) The appeal must be started within 20 business minor change to an approval.
days (the “submitters appeal period”) after the day
the decision notice or negotiated decision notice is (2) The appeal must be started within 20 business
given to the submitter. days after the day the notice of the decision is given
to the person.
(3) If a person withdraws a submission before the
application is decided, the person may not appeal the (3) Subsection (1)(a) does not apply if the
decision. approval resulted from a development application
(superseded planning scheme) that was assessed as
(4) If an application involves both impact if it were an application under a superseded planning
assessment and code assessment, appeal rights for scheme.
submitters are available only for the part of the
application involving impact assessment. (4) Also, a person who has made a request
mentioned in subsection (1) may appeal to the court
against a deemed refusal of the request.
(5) An appeal under subsection (4) may be started
1
at any time after the last day the decision on the
Section 3.1.6 (Preliminary approval may override local matter should have been made.
planning instrument)
Page 10
- 10 -
Division 9 - Appeals to court about other matters (a) the refusal, or the refusal in part, of a development
Appeals for matters arising after approval given application;
(no co-respondents) (b) a matter stated in a development approval,
4.1.31.(1) A person to whom any of the following including any condition applying to the
notices have been given may appeal to the court development, and the identification of a code
3
against the decision in the notice- under section 3.1.6;
(a) a notice giving a decision on a request to change (c) the decision to give a preliminary approval when a
or cancel a condition of a development approval. development permit was applied for;
2
(b) a notice under section 6.1.44 giving a decision to (d) the length of a period mentioned in section 3.5.21
change or cancel a condition of a development currency period;
approval. (e) a deemed refusal.
(2) The appeal must be started within 20 business (2) An appeal under subsection (1)(a) to (d) must
days after the day the notice of the decision is be started within 20 business days (the “applicant’s
given to the person. appeal period”) after the day the decision notice or
(3) Also, a person who has made a request negotiated decision notice is given to the applicant.
mentioned in subsection (1)(a) may appeal to (3) An appeal under subsection (1)(e) may be
the court against a deemed refusal of the started at any time after the last day a decision on the
request. matter should have been made.
(4) An appeal under subsection (3) may be started The Registrar for the Building and Development
at any time after the last day the decision on Tribunal may be contacted at the website
the matter should have been made. http://www.localgovernment.qld.gov.au/
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises or
the erection of a building or other structure permitted
by the planning scheme may appeal to the court
against the decision or the conditions applied.
(2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.
For Building Works Only
Rights of appeal conferred by Section 4.2.9 of the
Integrated Planning Act 1997 as follows:
Division 3 – Appeals to tribunals relating to
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
2
Section 6.1.44 (Conditions may be changed or
3
cancelled by assessment manager or concurrence Section 3.1.6 (Preliminary approval may override local
agency in certain circumstances) planning instrument)
Used in these records
SUPERSEDED Decision Notice - Change to an Existing Approval - 010.2001.00210331.003 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 71 KB (small file)
- File type
No other editions are linked here.