-5-
Erosion and Sediment Control
31. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
General
32. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
33. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
34. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
35. Where the existing retaining wall along the Park Road frontage of the site is removed to create
the driveway crossover the retaining wall shall be remediated immediately following the
completion of the earthworks for the driveway. A Development Permit for Operational Works
shall be obtained for these frontage works.
Building
36. The Geotechnical report submitted as part of your application has been appraised and
approved subject to the following conditions:-
36.1. There is to be no uncontrolled discharge of water onto the slope;
36.2. Stripping of vegetation for construction purposes should be minimised. If vegetation is
destroyed it should be reinstated immediately after that stage of construction is
completed;
36.3. Additional load due to fill, construction equipment or stockpiled materials should not be
located on the dune slope;
36.4. The use of vibratory equipment of any kind is not permitted to be used, including
vibrating rollers, the use of vibrating installation techniques for sheet piling and other
construction vibrations caused by excavating, earthmoving or demolition machinery or
other similar construction techniques;
36.5. All construction works on site shall accord with the Building Construction Report
prepared by Whaleycg Consulting Group dated December 2002 and the Morrisson
Geotechnic reports dated 1/9/00, 25/5/01.
36.6. A condition survey is to be carried out of adjoining buildings, structures and services
prior to any demolition works or construction works taking place on site. If distress
already exists, a photographic survey shall be undertaken, the distress measured and a
plan to monitor changes to distress shall be implemented. A copy of this report is to be
submitted to Council within 5 business days of survey and prior to construction work
proceeding;
36.7. Copies of all inspection reports by engineers are to be submitted to Council within 5
business days of the inspection taking place;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - Change to an Existing Approval - 010.2001.00210331.003 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 71 KB (small file)
- File type
No other editions are linked here.