Council archive · source document
Town Planning Consent TPC 2618 - amended 30 May 2013 · 51993.1288.01
Town Planning Consent Permit - TPC 2618 Page 3 10. 11. 12. 13. 14. 15. 16. 17. b. The wall facing the beach shall have an average setback of 2 metres. c. Landscaping on the seaward side of the wall referred to above, shall extend to Council's constructed boardwalk. Existing trees on the site and within road reserves are to be retained, except where required to be removed due to building operations or the conduct of the approved use. This condition does not apply to existing palms within the site Construction work and other associated activities are permitted only during the hours of 7.00 a.m. to 6.00 p.m. Monday to Saturday. No work is permitted on public holidays, except where extended hours are approved by the Building Surveyor. All separate, adjoining lots that form part of this application are to be amalgamated into one undivided lot in accordance with Section 5.11 of the Local Government (Planning and Environment) Act, prior to the issue of a Building Approval. The developer shall bear the cost of alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site, The footpath across the frontage of the site is to be fully paved from the kerb and channel to the property alignment and landscaped to the satisfaction of the Shire Engineer. Connection to Council's existing water supply and sewerage reticulation systems at the developer's expense to the standards and requirements of the Shire Engineer. The developer shall provide metered water connections from the water supply system to the proposed development, in accordance with Council's standards and to the satisfaction of the Shire Engineer. Roof and surface water (including the carparking area) is to be collected on site and is to be discharged through a single underground drain line into existing drainage in Hastings Street to the satisfaction of the Shire Engineer. A Building Approval shall not be granted until the Shire Engineer has approved of the drainage scheme. Provision of refuse chutes, in accordance with Council's Policy for the storage of refuse in bulk containers. Loading areas are to be located off street to the satisfaction of Council's Shire Engineer and Environmental Health Officer. Provision of an imperviously paved area to accommodate all refuse containers to the reasonable satisfaction of Council's Environmental Health Officer. This area is to be aesthetically screened from any road frontage or adjoining property boundary and is to be setback a distance of two (2) metres from any road frontage. A suitable hosecock, hoses and approved drainage outlet to Council's sewer, are to be located in the vicinity of the refuse container area for washing containers.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Town Planning Consent TPC 2618 - amended 30 May 2013Related documentApplication case desk ↗
About this file
- File size
- 155 KB (small file)
- File type
No other editions are linked here.