Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Town Planning Consent TPC 2618 - amended 30 May 2013 · 51993.1288.01

of 4

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Town Planning Consent Permit - TPC 2618 Page 3

10.

11.

12.

13.

14.

15.

16.

17.

b. The wall facing the beach shall have an average setback of 2 metres.

c. Landscaping on the seaward side of the wall referred to above, shall extend to
Council's constructed boardwalk.

Existing trees on the site and within road reserves are to be retained, except where
required to be removed due to building operations or the conduct of the approved
use. This condition does not apply to existing palms within the site

Construction work and other associated activities are permitted only during the hours
of 7.00 a.m. to 6.00 p.m. Monday to Saturday. No work is permitted on public
holidays, except where extended hours are approved by the Building Surveyor.

All separate, adjoining lots that form part of this application are to be amalgamated
into one undivided lot in accordance with Section 5.11 of the Local Government
(Planning and Environment) Act, prior to the issue of a Building Approval.

The developer shall bear the cost of alteration of any public utility or other facilities
necessitated by the development of the land or associated construction works external
to the site,

The footpath across the frontage of the site is to be fully paved from the kerb and
channel to the property alignment and landscaped to the satisfaction of the Shire
Engineer.

Connection to Council's existing water supply and sewerage reticulation systems at
the developer's expense to the standards and requirements of the Shire Engineer.

The developer shall provide metered water connections from the water supply system
to the proposed development, in accordance with Council's standards and to the
satisfaction of the Shire Engineer.

Roof and surface water (including the carparking area) is to be collected on site and
is to be discharged through a single underground drain line into existing drainage in
Hastings Street to the satisfaction of the Shire Engineer. A Building Approval shall
not be granted until the Shire Engineer has approved of the drainage scheme.

Provision of refuse chutes, in accordance with Council's Policy for the storage of
refuse in bulk containers. Loading areas are to be located off street to the satisfaction
of Council's Shire Engineer and Environmental Health Officer.

Provision of an imperviously paved area to accommodate all refuse containers to the
reasonable satisfaction of Council's Environmental Health Officer. This area is to be
aesthetically screened from any road frontage or adjoining property boundary and is
to be setback a distance of two (2) metres from any road frontage. A suitable
hosecock, hoses and approved drainage outlet to Council's sewer, are to be located in
the vicinity of the refuse container area for washing containers.

Used in these records

About this file

File size
155 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Town Planning Consent TPC 2618 - amended 30 May 2013.pdf · 155 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.