Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2018-12-11 S&O Agenda - Attachment 1 to Item 16 - Road Infrastructure Asset Management Plan

of 55

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
  8.5     Traffic Management – Service Level Catalogue

 Service Output                       TRAFFIC & TRANSPORT
                                      Provision of an efficient and safe transport network as well as
                                      provide facilities and programs supporting public transport.

 Service Activity                     Traffic Management & Operations
                                      The activities include analysis of issues, investigations and
                                      implementation of measures to improve road safety and manage
                                      traffic as well as programs aimed at reducing traffic and parking
                                      congestion.

 Responsible Area xxii                Department                           Branch

                                      Infrastructure Services              Infrastructure Planning, Design &
                                                                           Delivery
 Cost Centres                         Transport Infrastructure Planning    2100
                                      Traffic & Transport Operations       2101
                                      Sustainable Transport Levy           2104
                                      Department Management –              1900
                                      Director Infrastructure Services     2000

 Key Statistics                       Traffic Lights (Council owned)       2 installations

                                      Traffic counters (permanent) xxiii   11 permanent induction loop counters
                                                                           5 permanent piezo strip counters

                                      Cycle counters                       4 permanent

                                      Free Holiday Bus                     66,242 trips (FY 2016/17)

                                      # Participants Walk-and-Ride         2 (program still developing)
                                      (Schools)

 Legislative responsibility to        Under the Land Act 1994 local government is trustee of road reserve and
 provide the service                  has responsibility to manage use of reserves.

                                      Heavy Vehicle National Law 2012
 ACTIVITY                                                                  SERVICE LEVEL TARGET
 Maintenance
 [Activities include cyclic inspections and routine maintenance of traffic management infrastructure such as
 traffic lights]

 Note: maintenance of other traffic management infrastructure such as signs & traffic control devices is
 undertaken as part of routine road maintenance activities.
 Cyclic work                         Traffic light installations inspected Quarterly
                                     (contract)
 Scheduled work                      Work as identified from quarterly inspections

 Reactive work [customer              Traffic lights maintenance/timing    30 business days
 requests]                            issues (contract)

 Operations
 [Activities include road safety investigations, audits and minor improvements such as speed limit adjustments,
 traffic noise complaints, visibility & sight line issues, requests for new signs and lines and other measures to
 ensure that the road network is safe and traffic movements are effectively controlled and processing
 applications for heavy vehicles to use local roads]



Asset Management Plan: Roads Infrastructure                                                            Page 34
Log in to download the original file

2018-12-11 S&O Agenda - Attachment 1 to Item 16 - Road Infrastructure Asset Management Plan(PDF, 5MB).pdf · 4.8 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.