Original source · versioned page text
2018-12-11 S&O Agenda - Attachment 1 to Item 16 - Road Infrastructure Asset Management Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn 8.5 Traffic Management – Service Level Catalogue
Service Output TRAFFIC & TRANSPORT
Provision of an efficient and safe transport network as well as
provide facilities and programs supporting public transport.
Service Activity Traffic Management & Operations
The activities include analysis of issues, investigations and
implementation of measures to improve road safety and manage
traffic as well as programs aimed at reducing traffic and parking
congestion.
Responsible Area xxii Department Branch
Infrastructure Services Infrastructure Planning, Design &
Delivery
Cost Centres Transport Infrastructure Planning 2100
Traffic & Transport Operations 2101
Sustainable Transport Levy 2104
Department Management – 1900
Director Infrastructure Services 2000
Key Statistics Traffic Lights (Council owned) 2 installations
Traffic counters (permanent) xxiii 11 permanent induction loop counters
5 permanent piezo strip counters
Cycle counters 4 permanent
Free Holiday Bus 66,242 trips (FY 2016/17)
# Participants Walk-and-Ride 2 (program still developing)
(Schools)
Legislative responsibility to Under the Land Act 1994 local government is trustee of road reserve and
provide the service has responsibility to manage use of reserves.
Heavy Vehicle National Law 2012
ACTIVITY SERVICE LEVEL TARGET
Maintenance
[Activities include cyclic inspections and routine maintenance of traffic management infrastructure such as
traffic lights]
Note: maintenance of other traffic management infrastructure such as signs & traffic control devices is
undertaken as part of routine road maintenance activities.
Cyclic work Traffic light installations inspected Quarterly
(contract)
Scheduled work Work as identified from quarterly inspections
Reactive work [customer Traffic lights maintenance/timing 30 business days
requests] issues (contract)
Operations
[Activities include road safety investigations, audits and minor improvements such as speed limit adjustments,
traffic noise complaints, visibility & sight line issues, requests for new signs and lines and other measures to
ensure that the road network is safe and traffic movements are effectively controlled and processing
applications for heavy vehicles to use local roads]
Asset Management Plan: Roads Infrastructure Page 34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.