Compiled Approved Plans MCU16 0138 & OPW16 0257 pdf
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn ath
1.18 1.24 Fo otp
-
ace
1.20 * 1.35
c ords
e Terr
1.2 1.21 m Re
i
1.06 tra L
in e F
ro
NOOSA COUNCIL
Gymp
*Tels WM
Notes From
Rec or
d s*
Denotes Fill
r Lin e 1.26
Sewerage to discharge to existing
sewer in accordance with A.S. 3500. 1.19 1.25
1.24 *Wa te
1.24
75 °0
'
1.44
to be confirmed APPROVED PLAN
by Operational
wer*
1.58
TELE PIT
1.19 1.08 1.22 15.3
29
MCU16/0138 & OPW16/0257
ead Po
SCREW 1.31
Works plans by RPEQ
Block
1.27
Stabilised cut and fill batters to be a 1.18 Fo otp
ath
9 MAY 2017
*Overh
1.19
Wa ll
D/Way
minimum of 1000mm away from 1.23
1.27
footings 1.26
1.26 1.24
and are to have 1 in 1 max. gradient. 1.2 1.26 1.27
1.23
1.25 1.27
Grade finished surface level PP1.22
75 °0
'
1.23 1.26
1.27
from slab and footings.
Po ol E
1.25 05
18.1
2750
Position of proposed building to 0
xc ava
2751.33
Fall
1.25 1.26 1.29
be verified by builder on site. WM 1.22
tion
1000
1.20
3.63 1.25
Location of existing services to be
1.29
1.28
Top of Awning
18
verified by builder prior to
Fall
1.26
Fall
construction. 1.24 1.35
Pool Excavation
All stormwater drainage shall be in 1.29 1.22
Step
1.26 1.27
accordance with A.S. 3500.3. 1.2
s
CARPORT 1.34
1.16
All stormwater drainage shall be in
Blo ck
1.22
accordance with NSC. 1.28
Re ta
Paving
1.34
1.2
ining
All stormwater drainage design is 1.2
Wall
1.2 1.22
1.24
Fall
preliminary and shall be confirmed 3.63 1.16
Ove rg
Top of Awning
by a RPEQ civil engineer. Minimal fill to this location
Fall
rown
to provide surface drainage. 1.10
Gard
IO
Block up footing
165°
Divert all stormwater from roof
40.2
en
1.28
0'
storage to subfloor
34
1.18
to driveway side of building where 1.19
Septic Tank
2.46
possible. 1.14
1.28
1.08 Top of Wall
1.08 3.68 1.15 CP
1.28 Deck Level BUP104209
1.38
40.2
344°5
1.27 1.26
34
1.05
40.2
4'
344°5
1.28 1.26
34
1.30
4'
1.38 1.04 1.09
Paving
Proposed Landscaping 1.02
1.30
In accordance with operational works and landscaping 1.29
1.30 1.24 1.32
designer plans. 1.30
1.36
Landscaping Required : 369m2
Landscaping Achieved : 556.2m2 1.26 1.39
Palm Clump
Green Hatch Soft Landscape: 277.5 m2 (111 & 113)
Light Blue Hard Landscaping : 278.7 m2 (111 & 113)
Fall
1.60 1.08
Total Sites m2 = 1343m2 1.05 2.47
1.33 Top of Wall
Total Soft Landscaping % = 20.66% 1.07 1.16
1.04 1.15
1.09
Total Landscaping % = 20.7% 1.14 1.05
5
RP79817 1.32
1.22
1.20
1.05
Clothes Line
1.18
1.11
Block up 1.17
2.47
footing storage 1.21 1.4 Top of Wall
Minimal fill to this location to subfloor 1.6
to provide surface drainage. 1.13 Pool 1.33 1.39
1.8
2 2.45
Divert all stormwater from roof Excavation 1.34
2.2 59
15.2
to driveway side of building where 1.19 1.30
1.45 2.41 2.4 0'
1.39 25 5°
possible. Pool Bank
Top of
Excavation 1.92 2.30 2.40
Timbe
r Fen
ce
cords*
Fro m Re
1.39
er Line
1.17
1.35 *Sew
1.2 1.33
1.25
1.35
CP
1.21
05 BUP103813
1.30 18.1
25 5°
0' Emt C
r Fen
ce
Recor
ds*
RP817453 PROPOSED SITE WORKS
1.31 Timbe e From
er Lin *
*Sew
Fro m Re
cords * Refer to civil engineering operational works plans
e
er Lin Emt D
*Sew (guide only)
C COPYRIGHT The Drawing and the design depicted on this sheet remains the property of Icon Building design. Reproduction in part or whole is prohibited unless written permission is obtained from Icon Building Design. Plans are design for use on the job address specified in the titleblock only. RP817422
Revision Schedule Client Name: The Property Clinic
Revision Number Revision Description Revision Date Issued by Project Address: No. 113 Gympie Terrace, Noosaville Sheet Number: 04 Project Number:16-024
A DA Set 1.0 07/03/2017 B.Hunt
Climate Zone: 2
B RFI - COUNCIL 11/12/2016 B.Hunt
Wind Category: To engineers spec.
Proposed Site Works
Phone: 0488209840
email: [email protected] Project Issue Date: 07/03/2017 Project Status: DA Set 1.0 - RFI Scale: As indicated
website: www.iconbuildingdesign.com.au Checked/Signed By Director: Bradley Hunt Drawn By: BJH QBCC LIC# 126221
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.