Council archive · source document
Approved Documents · OPW11/0335
Very large file (25.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
4.0 Rehabilitation Management 4.1 Initial Weed Management Phase (Pre-construction/Construction) Management Actions: j 1, Locate and clearly demarcate rehabilitation zones (Figure 2.1); | 2. All contractors will be made aware of restrictions applying to the rehabilitation area; | 3. Erect wire fauna fence to prevent any unauthorised access to parkland areas; 4, . Weed control In accordance with the methods outline in Table 3.1 Is to be undertaken along the interface of the | parkland area and adjacent to the gabion wall where necessary (rehabilitation zone 2 & 3) (Figure 2.1); | 5, Weed removal within rehabilitation zone 1 (Caravan Park) is to be undertaken using mechanical control methods. Alt | weed material is to be scrapped by an excavator into the caravan park site where it Is to be stockpiled and removed off-site. The use of chemicals should only be underiaken by a suitably qualified person (i.e. Agriculture Ghemical Distribution Control certified) and must be used in accordance with the Material Safety Data Sheet (MSDS); 7. No broad scale spraying or overspray methods are to be employed at the site; 8. Existing rubbish, other foreign material and any ald fencing will be removed; . All native vegetation cleared from the site is to be mulched, and spread over bare portions of the rehabilitation zones at a maximum thickness of 300mm; and 10. Sediment fencing Is to be Installed along the boundary of the parkland rehabilitation area to prevent the potential for erosion to occur. Pp © Performance Criterla: = All treatments (je. weed control) for rehabilitation zone 1 completed; | = All treatments (1.6. spot weed control} for rehabilitation zone 2 and 3 completed; » Weed removal on peripheral edges of the parkland area are completed and maintained; |= Allrubbish, foreign material, ald fencing etc removed; and = Fauna and sediment fencing in place. 4.2 Revegetation Phase (Post-constructian) Management Actlons: | 4. Rehabilitation zone 1 is to be revegetated in accordance with the approved Landscape Plan; | 2. Infill planting with prescribed species and densities for AE12.2.7 listed in Appendix A js to occur within spot i treatment areas In rehabilitation zone 2; | 3. Infill planting wilh prescribed species and densities for RE12.2.7 listed in Appendix A is to occur within spot | treatment areas in drier areas of rehabilitation zone 3. Infill planting with prescribed species and densities for | RE12.2.12 & RE12.2.15 listed in Appendix A is to occur within spot treatment areas in wetter areas of rehabilitation | zone 3; 4. Revegetation and infill planting in rehabilitation zone 1, 2 and 3 is to commence as soon as the construction phase has been completed; | 5. Areas Is to be revegetated / infill planted 10 be undertaken in accordance with methods described in Section 3.2; and | 6. Signage i is to be erected to demarcate the rehabilitation zones. | Performance Criteria: » Rehabilitation zone 1, 2 and 3 planted; * No (negligible) weed species in rehabilitation zones; and = Fencing intacL 100611_PR29517_FL_Rehab.doc Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved DocumentsRelated documentApplication case desk ↗
About this file
- File size
- 25.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.