4.0 Rehabilitation Management

4.1 Initial Weed Management Phase (Pre-construction/Construction)

 

Management Actions: j
1, Locate and clearly demarcate rehabilitation zones (Figure 2.1); |
2. All contractors will be made aware of restrictions applying to the rehabilitation area; |
3. Erect wire fauna fence to prevent any unauthorised access to parkland areas;
4,

. Weed control In accordance with the methods outline in Table 3.1 Is to be undertaken along the interface of the |
parkland area and adjacent to the gabion wall where necessary (rehabilitation zone 2 & 3) (Figure 2.1); |

5, Weed removal within rehabilitation zone 1 (Caravan Park) is to be undertaken using mechanical control methods. Alt
| weed material is to be scrapped by an excavator into the caravan park site where it Is to be stockpiled and removed
off-site.

The use of chemicals should only be underiaken by a suitably qualified person (i.e. Agriculture Ghemical Distribution
Control certified) and must be used in accordance with the Material Safety Data Sheet (MSDS);

7. No broad scale spraying or overspray methods are to be employed at the site;

8. Existing rubbish, other foreign material and any ald fencing will be removed;

. All native vegetation cleared from the site is to be mulched, and spread over bare portions of the rehabilitation zones
at a maximum thickness of 300mm; and

10. Sediment fencing Is to be Installed along the boundary of the parkland rehabilitation area to prevent the potential for
erosion to occur.

Pp

©

Performance Criterla:
= All treatments (je. weed control) for rehabilitation zone 1 completed;
| = All treatments (1.6. spot weed control} for rehabilitation zone 2 and 3 completed;
» Weed removal on peripheral edges of the parkland area are completed and maintained;
|= Allrubbish, foreign material, ald fencing etc removed; and
= Fauna and sediment fencing in place.

 

 

 

4.2 Revegetation Phase (Post-constructian)

 

Management Actlons: |
4. Rehabilitation zone 1 is to be revegetated in accordance with the approved Landscape Plan; |
2. Infill planting with prescribed species and densities for AE12.2.7 listed in Appendix A js to occur within spot i

treatment areas In rehabilitation zone 2; |

3. Infill planting wilh prescribed species and densities for RE12.2.7 listed in Appendix A is to occur within spot |
treatment areas in drier areas of rehabilitation zone 3. Infill planting with prescribed species and densities for |
RE12.2.12 & RE12.2.15 listed in Appendix A is to occur within spot treatment areas in wetter areas of rehabilitation

| zone 3;

4. Revegetation and infill planting in rehabilitation zone 1, 2 and 3 is to commence as soon as the construction phase
has been completed; |

5. Areas Is to be revegetated / infill planted 10 be undertaken in accordance with methods described in Section 3.2; and |

6. Signage i is to be erected to demarcate the rehabilitation zones.

| Performance Criteria:
» Rehabilitation zone 1, 2 and 3 planted;
* No (negligible) weed species in rehabilitation zones; and
= Fencing intacL

 

100611_PR29517_FL_Rehab.doc Page 13

Used in these records

About this file

File size
25.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Documents.pdf · 25.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.