4.4 Roles &
Contractors undertaking rehabilitation works must be instructed directly of the requirements of this plan. A
copy of this ERP is to be retained and displayed on site at all times during rehabilitation activities. The site
manager should ensure that all relevant contractual documents specify the ERP as a responsibility. The
roles and responsibilities assigned to individuals are outlined in Table 4.1.
TABLE 4.1 Rioves & RESPONSIBILINES
Implement the requirements of the ERP;
"= Replace plant mortalities; and
i = Ongoing maintenance.
| Rehabilitation contractor Rehabilitation works.
oe BT caterer orl reeled
| Restoration Ecologist Ensure the rehabilitation contractor is } "Monitoring of rehabilitation works to i
Implementing the requirements of the ERP. ensure compliance with the ERP;
Report to Project Manager. _* Sign off at end of malntenance period;
and
\ =» Recommend amendments, where |
| | necessary. i
Matrix Project Pty Ltd / Ensure the rehabititation contractor has the i » Review moniloring reports to ensure
Project Manager necessary access to the site. Ensure the | compliance.
rehabilitation contractor is implementing the |
requirements of the ERP. t
100611_PR20517_FL_Rehab.doc Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved DocumentsRelated documentApplication case desk ↗
About this file
- File size
- 25.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.