Council archive · source document
Approved Documents · OPW11/0335
Very large file (25.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
MAINTENANCE SCHEDULE
APPENDIX B
pCi
= Locate rehabilitation zones on the site;
Initlal « Locate spot treatment areas withln zone 2; and
= Identi i id weeds to be removed sic.
= Ensure appl ‘6 weed removal / control has been
Implamented;
Pre-revegetation
Install erosion & sediment control devices (If required); and
works
* Implement plant out; and
_Acquira mulch, fertiliser, grow-tubes, sun-hardened seedlings etc.
| Restoration Ecologist |
& Rehabilitation
Contractor.
| Rehabilitation —
| Contractor.
| Restoration Ecologist _
|
|
Planling | © Erect signage. : & Rehabilitation
| _ meet OTOH
| Monitor seedling health; Replace damaged seedlings; Rehabilltation
Vee io a |» Check tor clsturbances tram pasis (e.g. rabbits, vandals etc); Replace plant guards; Contractor,
the complelion s | Check erosion & sediment control devices are in place and in Re-Instate damaged sediment fencing; and
revegetation works warking order; and Water daily If rainfall has not been sufficient,
Watering. _ _ - _ a
* Monitor plant health; Replenish mulch if necessary;
Contractor,
_ © Check for disturbances from pests;
Gheck for eroslor/sedimentallon;
Monilor weeds; and
» Watering.
Monthly for the
first 6 months
® Check mulch;
* Monitor weeds;
| Check for erosion/sedimentation; and
Quarterly » Monitor regeneration success.
is Complete all required rehabilitation works
= Monilor plant health;
| 2 Gheck for disturbances from pests;
» Monitor weeds; and
12 months |
|
|
| ‘ _ Complete report on the regeneralion success.
Replace plant guards;
Replace damaged seedlings;
Re-instate damaged sediment fencing;
Treat declared weed species and manage spread of
olher weeds; and
Water If rainfall has not been sufficlent.
Replenish mulch if necessary;
Treal declared weed species and spray to maintain
control over spread of other weeds; and
Undartaken any adgitional measures necessary to
temediate any unsuccessful rehabilitation works or
ensure continued / future rehabilitation success
(as suggested by the Rehabilitation Ecologist).
Undertaken any additional measures necessary to “] ‘Rehabliliation
remediate any unsuccessful rehabilitation works or
ensure continued / future rehabilitation success
{as suggested by the Rehabilitation Ecologist).
100611_PR20517_FL_Rehab.doc
i |
| Rehabilitation |
| Rehabllitation
' Gontractor &
» Restoration
' Ecologist.
| Contractor &
| Restoration
| Ecologist.
Page B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved DocumentsRelated documentApplication case desk ↗
About this file
- File size
- 25.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.