Council archive · source document
Approved Documents · OPW11/0335
Very large file (25.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
“B Koala Habitat Management Plan - 215-219 David Low Way, Peregian Beach Appropriate vegetation management strategies are outlined below. i. iii. iv. vi. Vii. Prior to the commencement of any vegetation clearance, the Contractor shall identify all native vegetation to be retained across the development site on construction plans and in the field. All vegetation retention areas will be fenced and clearly identified as a ‘Vegetation Protection Area’ prior to the commencement of any works on the subject site. These exclusion fences shall be maintained throughout the construction period. Access to vegetation retention areas will only be allowed for the purposes of weed removal by a suitably qualified restoration team. Within these zones the following activities shall not be permitted: Storage and mixing of materials; Vehicle parking; Liquid disposal; Machinery repairs and/or refuelling; Construction site office or shed; Combustion of any material; Stockpiling of soil, rubble or debris; Any filling or excavation including trench line, topsoil skimming and/or surface excavation, unless otherwise approved by the Project Manager; and e Unauthorised pesticide, herbicide or chemical applications. All activities in an area adjacent to any protected vegetation shall be carried out in such a manner as to minimise any damage to trees and / or the conserved area. Tree limbs (of trees to be retained) that are likely to be in the way of earthworks shall be pruned by a qualified tree surgeon prior to construction activity commencing. Tree roots (of trees to be retained) that are likely to interfere with machinery shall be cut (by a qualified tree surgeon or horticulturalist) and the remaining roots shall be treated with a suitable fungicide. The erosion and sediment control measures shall be in accordance with the erosion and sediment control plans. The Project Manager shall undertake inspections on a weekly basis during the construction phase to ensure that all recommendations are being followed. Q10024/HB/Final JAMES WARREN AND ASSOCIATES 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved DocumentsRelated documentApplication case desk ↗
About this file
- File size
- 25.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.