Council archive · source document
Approved Documents · OPW11/0335
Very large file (25.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Matrix Projects (QLD)}- Essence of Peregian, David Low Way Peregian Beach QLD 4573 Summary 1, Samuel Cowie Arborist/Horticulturist and Principal of Leaf & Limb Horticultural Consultancy, have been engaged by Matrix. [have been engaged for the purpose of investigating and reporting on options rejated to the retention or remoyal, and protection of the existing irees located on ihe site being developed as The Essence of Peregian, and advise on any relevant on-going tree management that is required between trees and proposed development works, | inspected the site and trees on the 14” of April 2010 and the 7" of June 2010. The site inspection and this report were conducted as per SCRC’s DA conditions, specifically conditions No 17, 18, and 49, The report also addressed issues with condition No 16. This forms the brief of the report. Condition No 16 Given the extensive nature of the bulk earthworks agross the majority of the site. the overall age/poor health and structure of the Melaleucas on the site, retention of any trees outside of the building footprints isn’t possible for a long-term health and structural arboricultural perspective. Condition No 17 The requirement to install sheet piling outside of the building located in the south-castern corner of the site will impact heavily on Trees No 1, 2,3 and 4. Tree No | has a poor retention value due to the basal structural defect and poor useful life expectancy, where as Trees No 2, 3 and 4 will be severely impacted by the sheet piling. Combined with their overall small stature, therefore lacking significance when compared to larger trees, removal and replacement of all 4 trees is the best option and will increase the future teeescape of the nature strip and site. ‘Tree No 5 is neither in good health or structure, therefore removal and replacement with a supertor specimen at the landscape phase is the best option. Tree No 6 has a short useful life expectancy due to the loss of a major first order branch, including a major future structural issue, therefore the retention value is low and removal is recommended. Trees No 7, 8 and 9 are also poor specimens for retention, This is due to their advanced age and prevalence of the decay fungus Phellinus throughout their branch structure. The client requests and prefers the retention of these trees, and given the driveway footprint, retention maybe possible under supervision of a qualified sit arborist and as per AS4970-2009. Condition No 49 Assessment of the KIIMP by James Warren and Associates found no trees specified for relention due to Koala activities, therefore the requirements of this condition aren't applicable. Tree Prviection (Wesiern Reserve) Although not addressed under the conditions of DA consent, the trees and vegetation located on the western side of the gabion wall are retainable (no obvious impacts or future targets in their vicinity}, Protection of the vegetation and trees maybe done by installation of appropriate fencing and signage with the assumed erosion contro! measures placed on the western side of the gabion wall during construction, Tree Protection prior, during and after development works ‘The tree management and protection plan recommended in this report (6.3) should be implemented to preserve and relain trees numbered 7, 8 and 9 if requested by the client. Leaf and Limb Horticultural Consultancy Prepared by Samuel Cowie 11" of June 2010
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved DocumentsRelated documentApplication case desk ↗
About this file
- File size
- 25.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.