Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Approved Documents · OPW11/0335

of 68

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (25.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Matrix Projects (QLD)- Essence of Peregian, David Low Way Peregian Beach QLD 4573 Page 14

 

Prior to construction works, the site arborist should consult with the
construction company to outline appropriate tree protection methods during
construction, to convey the importance of tree protection, and open
communication channels.

The construction company is responsible for all tree protection procedures on
the site as per these specified recommendations, whenever the site arborist is
not on site. It is the responsibility of the builder to advise the site arborist of
when their presence is required on site or of any breaches of the tree protection
procedures.

All trees being retained as specified by Sunshine Coast Regional Council on
site should be appropriately marked by the site arborist.

Tree Protection Fencing (where used or designated) is to consist of 1800mm
high chain mesh fencing as per AS 4970-2009 or similar appropriate fencing
approved by the site arborist. TPF is to be installed as per TPZ radius
measured as per AS4970-2009, 12 times trunk DBH. The site arborist
should document any modification to the TPZ or TPF.

All TPF will have signage indicating the importance of tree protection, the
arborists contact details, and that it’s a hanging offence to disregard these.

The construction workers or subcontractors working on the site are to be
informed of tree protection importance by the contractor.

The site arborist and the contractor should agree upon and designate storage,
dumping and wash areas that will not impact on any TPZ.

Any pruning or removal works required (such as deadwood removal or
clearance pruning, selective removal of Phellinus infected branches), including
root pruning, shall be carried out by the tree contractor to Australian Standards
AS 4373 —2007 ‘Pruning of Amenity Trees’.

During Construction

The site arborist shall be present to supervise any excavation, trenching or
construction located on the site that may affect any tree roots within a
designated TPZ, and shall keep a record of works to present to the project
supervisor after completion of construction.

Access within a TPZ for foot traffic will be done only as per guidelines
described within 4.5 of AS 4970-2009.

Absolutely no machinery traffic is allowed within a TPZ.
Where possible the first 500mm of any excavation should be dug by hand or

other appropriate method designated by the site arborist to identify any
significant tree roots (25mm or greater in diameter).

 

Leaf and Limb Horticultural ConsultancyO
Prepared by Samuel Cowie 11" of June 2009

Used in these records

About this file

File size
25.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Documents.pdf · 25.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.