Council archive · source document
Approved Documents · OPW11/0335
Very large file (25.2 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Matrix Projects (QLD)- Essence of Peregian, David Low Way Peregian Beach QLD 4573 Page 14 Prior to construction works, the site arborist should consult with the construction company to outline appropriate tree protection methods during construction, to convey the importance of tree protection, and open communication channels. The construction company is responsible for all tree protection procedures on the site as per these specified recommendations, whenever the site arborist is not on site. It is the responsibility of the builder to advise the site arborist of when their presence is required on site or of any breaches of the tree protection procedures. All trees being retained as specified by Sunshine Coast Regional Council on site should be appropriately marked by the site arborist. Tree Protection Fencing (where used or designated) is to consist of 1800mm high chain mesh fencing as per AS 4970-2009 or similar appropriate fencing approved by the site arborist. TPF is to be installed as per TPZ radius measured as per AS4970-2009, 12 times trunk DBH. The site arborist should document any modification to the TPZ or TPF. All TPF will have signage indicating the importance of tree protection, the arborists contact details, and that it’s a hanging offence to disregard these. The construction workers or subcontractors working on the site are to be informed of tree protection importance by the contractor. The site arborist and the contractor should agree upon and designate storage, dumping and wash areas that will not impact on any TPZ. Any pruning or removal works required (such as deadwood removal or clearance pruning, selective removal of Phellinus infected branches), including root pruning, shall be carried out by the tree contractor to Australian Standards AS 4373 —2007 ‘Pruning of Amenity Trees’. During Construction The site arborist shall be present to supervise any excavation, trenching or construction located on the site that may affect any tree roots within a designated TPZ, and shall keep a record of works to present to the project supervisor after completion of construction. Access within a TPZ for foot traffic will be done only as per guidelines described within 4.5 of AS 4970-2009. Absolutely no machinery traffic is allowed within a TPZ. Where possible the first 500mm of any excavation should be dug by hand or other appropriate method designated by the site arborist to identify any significant tree roots (25mm or greater in diameter). Leaf and Limb Horticultural ConsultancyO Prepared by Samuel Cowie 11" of June 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved DocumentsRelated documentApplication case desk ↗
About this file
- File size
- 25.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.