Original source · versioned page text
Approved Plans - MCU21-0228 & OPW21-0364
The original of this document is very large (10.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Distribution
April 2022
Copies Recipient
1 Electronic Copy (PDF) Altum Constructions
1 File Copy Arboriculture Contractors Australia
This document was prepared for the sole use of Altum Constructions.
No other party should rely on the information contained herein without the prior written
consent of Altum Constructions.
Disclaimer
No responsibility will be taken for the ongoing vitality of retention trees or damage that
they may cause in the future due to the dynamic nature of environmental change.
Follow up assessments are paramount to monitor plant health, structural integrity and
reduce any potential risk of harm.
3
© Use or disclosure of information contained on this sheet is subject to the restriction on the distribution page of this document
Document Set ID: 21942379
Version: 1, Version Date: 26/05/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.