Council archive · source document
Updated Planning Report - Tents · MCU22/0052
As far as development goes with respect to
ecological important areas, the lightweight
glamping tents within cleared sections will
not impact on existing habitat areas or
linkages. They are low impact in this regard.
Given the waterway is only a stream order 1,
the 30m setback is more than appropriate
and in line with best practices of generally
10m.
Development complies with PO1, PO3 and
PO4 and PO5
Bushfire Overlay Comment:
Development will be located within mapped
potential impact buffer and medium potential
bushfire buffer intensity. Water tanks will be
provided on site and can be conditioned by
Council accordingly. Pathways will be
provided with signage to allow safe access
and provide directions for firefighting vehicles
while enabling easy departure for visitors in
the event of a bushfire. Given management
will be present at all times on site, any
existing or possible situations which may
occur in the area can and will be monitored
by staff.
Development complies or can be
conditioned to comply with PO1 to PO8.
Flood Hazard Overlay Comment:
Page 12 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Updated Planning Report - Tents.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.8 MB (small file)
- File type
No other editions are linked here.