Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2015-03-03 Planning & Organisation Agenda

of 147

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

                      AGENDA


Planning & Organisation
   Committee Meeting


            Tuesday, 3 March 2015


                commencing at 1.30pm
       Committee Room, 9 Pelican Street, Tewantin



Committee: Crs Frank Wilkie, Noel Playford, Joe Jurisevic, Tony Wellington
Log in to download the original file

2015-03-03 Planning & Organisation Agenda(PDF, 17MB).pdf · 18.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of sections 2 to 88 (of 147)

Section 2

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA               3 MARCH 2015


TABLE OF CONTENTS

ITEM                                                                     PAGE
ATTENDANCE & APOLOGIES                                                      -
PRESENTATIONS                                                               -
PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS                                3
DA Planning & Environment                                                   3
1      DEVELOPMENT OF A NOOSA SHIRE KOALA POLICY                            3
2      MCU14/0103 MATERIAL CHANGE OF USE APPLICATION FOR A DETACHED
       HOUSE IN CONSERVATION ZONE SITUATED AT 146 SOLAR ROAD, COOROY
       MOUNTAIN                                                            11
3      DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR A
       DETACHED HOUSE SITUATED AT 71 SEAVIEW TERRACE, SUNSHINE BEACH
       - MCU14/0084                                                        19
4      NEGOTIATED DECISION REQUEST FOR RECONFIGURING OF 3 LOTS INTO 17
       LOTS - REC13/0146 SITUATED AT 55 LAKE MACDONALD DRIVE, COOROY       37
Strategic Land Use Planning                                                68
5      NOOSA COMMUNITY PROFILE & DEMOGRAPHIC REVIEW                        68
CORPORATE SERVICES DEPARTMENT REPORTS                                      80
Finance                                                                    80
6      DECEMBER 2014 QUARTERLY BUDGET REVIEW REPORT                        80
Property and Facilities                                                    98
7      COMMUNITY PURPOSE LAND AND INFRASTRUCTURE TENURE POLICY             98
EXECUTIVE OFFICE REPORTS                                                  109
8      NOOSA BIOSPHERE RESERVE MANAGEMENT - FUNDING ARRANGEMENTS
       AND LEASE OF DOONELLA HOUSE                                        109
Community Engagement                                                      127
9      COMMUNITY ENGAGEMENT ACTIVITY AND PROJECT OVERVIEW                 127
Governance                                                                134
10     COUNCILLOR REQUEST GUIDELINES                                      134
11     CONTACT WITH LOBBYISTS POLICY                                      139
12     PUBLIC INTEREST DISCLOSURE POLICY                                  143
CLOSED SESSION                                                        -




                                                                Page 2 of 147

Section 3

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  3 MARCH 2015



PLANNING & INFRASTRUCTURE DEPARTMENT REPORTS
(Planning & Development Sections only)

DA Planning & Environment
1    DEVELOPMENT OF A NOOSA SHIRE KOALA POLICY
Author           Principal Environment Officer, Peter Milne
                 Planning & Infrastructure Department

Index            ECM/Fauna Management/Koala

Attachments      Noosa Shire Koala Policy-Background Paper


EXECUTIVE SUMMARY
There have been calls from the community over the years for Noosa Council to consider
measures to protect koala populations in Noosa Shire. The development of a Koala Policy
would build on existing state regulations and guidelines and give local level policy guidance
to future koala conservation efforts. To assist in the development of a Koala Policy for Noosa
Shire, an initial public consultation process is recommended. This will enable Council to
consider a wide range of community views prior to developing the policy. This report seeks
approval to proceed with both the public consultation and also the subsequent development
of a Noosa Shire Koala Policy 2015.

RECOMMENDATION
That Council note the report by the Principal Environment Officer to the Planning &
Organisation Committee Meeting dated 3 March 2015 and:
A.   Undertake public consultation through Council’s ‘Your Say Noosa’ webpage to inform
     the development of Noosa Shire Koala Policy and through targeted consultation with
     key interest groups; and
B.   Endorse the development of a Noosa Shire Koala Policy.



REPORT
Koalas are known to occur at a range of locales across the Noosa Shire. Statistics and
anecdotal information suggest that local koala numbers are declining and that additional
management action may be needed. However, more information is required to get a clearer
picture of the numbers, health and long term sustainability of populations. Koala protection
should occur in concert with a range of measures aimed at improving biodiversity throughout
the Noosa Shire. Nonetheless, there is a community expectation that koalas as a species
will receive special consideration. This expectation is reflected in a number of federal and
state government laws and policies. There are also species specific provisions in the Noosa
planning scheme.

1.   Planning Instruments & Government controls.

The Australian Government has developed a National Koala Conservation and Management
Strategy 2009-14 and under national law koalas are listed as “vulnerable” in Queensland,
New South Wales and ACT. Under Queensland legislation the koala is listed as “vulnerable”



                                                                                   Page 3 of 147

Section 4

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                     3 MARCH 2015


in SEQ. Under the Single State Planning Policy Guidelines local councils are required to
address koala conservation and koala habitat offsets to ensure loss of koala habitat is
avoided or compensated for.

The federal government has recently released referral Guidelines to assist proponents and
decision makers in navigating the requirements of the Environmental Protection and
Biodiversity Act 1999 (EPBC Act) as it relates to koala conservation. It is the responsibility of
the landholder, owner, business or individual to determine if any new activity or development
requires referral under national environment law.

The South East Queensland Koala Conservation State Planning Regulatory Provisions 2010
(SPRP) apply to local planning instruments. This is the overarching planning instrument that
regulates new development at the development assessment stage. This incorporates priority
koala assessable development areas. Parts of Noosa Shire are included in this designation.
In relation to planning and development assessment the SPRP supersedes the State Nature
Conservation (Koala) Conservation Plan 2006 and Management Program 2006-2016 (koala
plan) and has retained provisions such as sequential clearing, use of a koala spotter and
other matters. The ‘koala plan’ addresses a number of issues and identifies strategies to
help avoid the decline of koalas in relation to habitat protection, controls on vegetation
clearing and reducing vehicle mortality and dog attacks. The koala plan also discusses
issues with translocation and the role of research, zoos, public education and rehabilitation
of sick, injured and orphaned koalas.

If residual impacts on Matters of State Environmental Significance (MSES), such as koalas,
cannot be avoided The Queensland Environmental Offsets Policy (2014) provides the
mechanism for the state Planning Minister to declare an area to be a Biodiversity
Development Offset Area (BDOA). Offsets provisions for koalas have already occurred in the
Noosa Shire (e.g. Settlers Cove development) and will likely occur into the future.

The State's Koala-sensitive Design Guideline: A guide to koala-sensitive design measures
for planning and development activities (2012) provides information for managers, land-use
planners, infrastructure providers and development proponents to benefit koalas. These
guidelines are referred to in the Noosa Plan Biodiversity Overlay Code as a guide for new
development to assist in the survival of koalas and provide for koala movement across the
landscape.

With the complexity of koala legislation and policy, it would be useful to have a simplified
local Noosa Shire policy to help guide koala conservation efforts for Council and the
community.

2.    Developing a Koala Policy

A Sunshine Coast Koala Summit was held in September 2012. The resulting report provided
a number of recommended steps to improve conservation of koalas on the Sunshine Coast.
Various koala proponents and activists have regularly put forward ideas for helping conserve
koalas. In addition there are a number of scientists working in South East Queensland who
can provide expert advice on koala conservation. Many residents also have their own ideas
about how koalas in the Shire might be better managed.

In order to develop a Noosa Shire Koala Policy, it is proposed to utilise the Your Say Noosa
interactive portal on Council's website for the purpose of public consultation. A background
paper will be provided on the website with general information on koalas, government
requirements and what a Noosa Koala Policy may consider (see Attachment 1). Links to
National and State koala legislation, policies and plans will also be provided.



                                                                                      Page 4 of 147

Section 5

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  3 MARCH 2015


Depending on the recommendations received, a range of measures might be considered by
Council for dealing with koala populations in the Noosa Shire. These may include:
a.  Habitat Protection.
b.  Better understanding of local koala populations.
c.  Guidelines for Koala Biodiversity Offsets.
d.  Infrastructure to benefit koalas such as signs, wildlife crossings etc.
e.  Pest control, particularly wild dogs.
f.  Community awareness and education.

As well as soliciting responses on the Noosa Council website, staff will also seek appropriate
advice from identified experts in the fields of koala research and koala conservation.

It is proposed to advertise the public consultation period. The public consultation will
continue for a period of 6 weeks beginning April 2015. Following the consultation process, a
recommended Koala Policy will come to a future Council meeting for determination.

Previous Council Consideration
Nil.

Finance & Risk
The implementation of a proposed koala policy may require resourcing and consideration in
future budget deliberations.

Consultation

External Consultation - Community & Stakeholder
The development of the Koala Policy will involve consultation with key stakeholders, experts
and the community.

Internal Consultation

CEO, Director Planning & Infrastructure, Manager Planning and Environment, Principal
Strategic Planner, Executive Manager, Community Engagement Manager, Councillor Tony
Wellington.

Departments/Sections Consulted:

       Community Services                   x   Planning & Infrastructure
       Disaster Management & Public Order       Building & Plumbing Services
       Waste & Environmental Health         x   DA Planning
       Community Facilities                 x   Strategic Land Use Planning
       Cultural Facilities                      Asset Design & Investigations
                                                Asset Planning
                                                Civil Operations
                                                Environment

x      Executive Office                         Corporate Services
x      Community Engagement                     Finance
       Customer Service                         ICT
       Executive Support                        Procurement & Fleet
       Governance                               Property & Facilities
       Human Resources                          Revenue Services




                                                                                   Page 5 of 147

Section 6

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA    3 MARCH 2015


                                                   Attachment 1




                                                      Page 6 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                            3 MARCH 2015

                                                                                         Attachment 1

                     NOOSA SHIRE KOALA POLICY BACKGROUND INFORMATION

                PREAMBLE FOR YOUR SAY NOOSA WEBPAGE
                Noosa Council is developing a Koala Management Policy to provide direction
                for the conservation of koalas in the Noosa Shire. We understand that there is
                significant public concern about the future of our local koala populations.
                Noosa Council seeks your valuable contribution to this process. Council will
                also be liaising with experts working in koala conservation to ensure we have
                a viable and responsive Policy.
                You are invited to contribute to the development of the Noosa Shire Koala
                Policy. Email your thoughts to [email protected]
                BACKGROUND DOCUMENT
                POLICY PURPOSE
                The Noosa Council acknowledges the Noosa public's concerns regarding the
                viability of local koala populations. Accordingly Council aims to develop a
                Koala Policy. The proposed Policy will dovetail with the Noosa Council's
                broader objective of protecting and enhancing Noosa's overall biodiversity
                values.
                The specific objective of the Noosa Council Koala Management Policy will be:
                To provide a coordinated and structured framework to effectively
                manage and conserve natural free ranging koala populations across
                their range within the Noosa Shire.

                BACKGROUND INFORMATION ABOUT KOALAS
                Koalas are an iconic species. As such they attract considerable attention,
                funding and effort. They are not the most vulnerable species within the Noosa
                Shire, however they are the species that engenders the most concern.
                There are four Australian States where koalas exist in the wild. Although it is
                often claimed that koalas are nationally "endangered", in fact they are listed
                under National legislation as "vulnerable" in Queensland, NSW and the ACT.
                They are not declared in Victoria or South Australia. Nowhere are they
                currently declared endangered.
                In South Australia, particularly at locales such as Kangaroo Island and the
                Adelaide Hills, koalas have been introduced and are now abundant in places
                where they do not historically belong. In some Victorian locales, koalas are so
                abundant that "they put unsustainable pressure on tree species, which poses
                a direct threat to the health of forests." (Victorian Koala Management
                Strategy)

                                                                                             Page 6 of 147

Section 7

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                    Page 7 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                          3 MARCH 2015

                At the other end of the spectrum, koala populations in many parts of
                Queensland and New South Wales are in rapid decline. The animals here
                face an increasing threat from urban expansion, disease, habitat loss, vehicle
                strike and predation by dogs.
                Koalas are solitary animals and very territorial. They often act aggressively
                towards other individuals. Males are more aggressive.
                The home range of an individual koala will depend on the habitat including
                available food trees. Within a socially stable group, home ranges overlap at
                the edges, and that is where any social interaction takes place.
                Koalas are very fussy eaters. They consume foliage of certain eucalypts,
                although some non-eucalypts may contribute to the diet. Females produce
                just one young per year.
                It is not known how many Koalas there are in the Noosa Shire area.
                Locally, koalas have been sighted at Peregian, Weyba, Sunshine Beach,
                Noosa National Park, Tewantin, Tewantin National Park, Tinbeerwah,
                Cooroibah, Cootharaba, Doonan, Lake Macdonald, Ringtail Creek, Yurol
                Forest, Pomona, Cooran, Kin Kin, Woondum National Park and elsewhere.
                Recently there have been verified reports of a koala on Noosa North Shore.
                The current population of koalas in the Noosa Heads National Park Headland
                section on the northern side of the Park are probably related to the two males
                and three females purposely released there in 1966. These 5 koalas were
                translocated from forestry sites on Bribie Island.
                As the Queensland Koala Conservation Plan notes, small fragmented
                populations may result in inbreeding and thus a reduction in genetic variation.
                This in turn can reduce the health potential and long-term viability of
                fragmented populations.
                Koalas are subject to a range of diseases. Most significant and commonplace
                is Chlamydiosis, which causes blindness, infertility and sometimes death.

                TRANSLOCATION OF KOALAS

                Translocation is controlled by the State Government. There are strict rules
                that must be met. Currently, koalas must be returned in close proximity to
                their place of origin. This is commonplace amongst regulations covering
                rehabilitated wildlife generally. It is designed to prevent indiscriminate
                translocations and to increase survival rates. Translocating animals to new
                areas has the potential to upset existing territories and also spread pathogens
                to new populations.

                                                                                            Page 7 of 147

Section 8

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                    Page 8 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                            3 MARCH 2015

                 However the practice of sending koalas back to where they came from may
                 mean that koalas in dangerous environments are returned to meet further
                 misfortune.

                 In discussions about translocation with experts at the Australia Zoo Wildlife
                 Hospital, it appears that:
                a) Koalas tend to be faithful to their home ranges and will attempt to return if
                    moved out of them. Translocating koalas over 4 years of age, and
                    particularly males, can be problematic because they have a tendency to
                    want to find their original territory.
                 b) It is not a simple matter to transfer koalas from different habitats. For
                    example, koalas in seaside locales have very different nutrient loads to
                    those in hinterland environments. Trying to put a coastal koala into an
                    inland forest and vice-versa is not considered good practice. The experts
                    also warned that coastal koalas are considerably less healthy as a result
                    of the poor nutrients in trees growing on sandy soil.
                Translocation is a complex issue, and rarely the easy solution that some
                 people may believe. Noosa Council will need to take a cautious approach to
                translocation proposals.
                GOVERNMENT REQUIREMENTS
                At the national level, environment protection of the Queensland, NSW and
                ACT koala populations as vulnerable species has strengthened the existing
                state protections for koalas. National environment protection doesn't mean
                that all activities in these areas will require federal environmental approval.
                Only projects likely to have a very significant impact on the koala population in
                Queensland, New South Wales and the ACT will need to be assessed under
                 national environment law.

                The federal government has released referral Guidelines to assist proponents
                and decision makers in navigating the requirements of fhe Environmental
                Protection and Biodiversity Act 1999 (EPBC Act) as it relates to koala
                conservation.

                At the state level, the South East Queensland Koala Conservation State
                Planning Regulatory Provisions 2010 (SPRP) applies to local planning
                 instruments. This incorporates priority koala assessable development areas.
                 Parts of Noosa are included in this designation. The SPRP regulates
                assessable development only, where that development meets certain triggers.
                There are a range of developments to which the provisions do not apply - e.g.
                self-assessable developments or those that are declared to be significant
                 projects under the State Development and Public Works Organisation Act
                 1977, etc.

                                                                                             Page 8 of 147

Section 9

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                    Page 9 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                         3 MARCH 2015

                The State Government Supported Community Infrastructure Koala
                Conservation Policy (2014) outlines how state public sector entities will
                consider koala conservation outcomes in the planning and delivery of
                government supported community infrastructure such as roads and buildings.
                The Queensland Environmental Offsets Policy (2014) provides the
                mechanism for the Planning Minister to declare an area to be a Biodiversity
                Development Offset Area (BDOA) for the purposes of achieving a net benefit
                for koala conservation. Offsets for koalas have already occurred in the Noosa
                Shire (e.g. Settlers Cove development) and will likely occur into the future.
                Meanwhile the state's Nature Conservation (Koala) Conservation Plan (2006)
                and the Nature Conservation (Koala) Management Program (2006 - 2016)
                prescribe outcomes for Koala Habitat Areas and criteria against which
                development in these areas must be assessed. Parts of Noosa Shire are
                identified as "Koala Conservation Areas" and also "Urban Koala Areas".
                Notably the mapping for these areas excludes some urban locales where
                koalas are known to exist, and also ignores the bulk of the Noosa hinterland
                where koalas are known to exist. The planning and development provisions in
                the Nature Conservation (Koala) Conservation Plan (2006) and the Nature
                Conservation (Koala) Management Program (2006 - 2016) have now been
                superseded by the South East Queensland Koala Conservation State
                Planning Regulatory Provisions 2010 (SPRP).
                Noosa Council's own planning scheme includes a biodiversity overlay that
                identifies potential koala habitat areas derived from state mapping. There are
                currently inconsistencies and shortcomings in this mapping. For some specific
                developments this mapping may have an impact on vegetation removal,
                although not in respect to the clearing for a house site for example.
                Koala provisions in the Noosa Plan biodiversity overlay code requires
                developments to include measures to assist the survival of koalas and provide
                for koala movement across the landscape. The code calls up design
                measures in the Nature Conservation Plan 2006.

                As guidelines and koala mapping are revised over time, the planning scheme
                will need to be updated to reflect these changes.
                It is important to note that there are restrictions on what Council can and
                cannot do in terms of planning decisions that may impact on koalas. Council
                cannot, for example, readily prevent construction of houses on private
                property where that development is in accord with other government
                instruments and also in accord with aspects of the planning scheme.

                WHAT THE KOALA MANAGMENT POLICY MAY CONSIDER

                The Noosa Council Koala Policy may consider issues such as:

                                                                                           Page 9 of 147

Section 10

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 10 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                            3 MARCH 2015

                 1. Habitat protection - where planning instruments allow and in keeping with
                other Council policies such as The Environmental Levy.
                2. Improved understanding of local koala populations.
                3. Improved mapping of local koala populations.
                4. Consideration of koala offsets where applicable (see Qid Environmental
                 Offsets Policy above).
                5. Infrastructure decisions - such as koala crossing signs, wildlife crossing
                additions as part of new infrastructure, etc.
                6. Pest control - particularly wild dogs.
                7. Community awareness and education.

                                                                                            Page 10 of 147

Section 11

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                    3 MARCH 2015


2                        MCU14/0103 MATERIAL CHANGE OF USE APPLICATION FOR A DETACHED
                         HOUSE IN CONSERVATION ZONE SITUATED AT 146 SOLAR ROAD, COOROY
                         MOUNTAIN
DOCUMENT INFORM AT ION




Author                           Development Planner, Jack Lewis
                                 Planning & Infrastructure Department

Index                            ECM / Application / MCU14/0103

Attachments                      1.   Proposal Plans



         APPLICATION DETAILS

         Applicant                           Carol Gordon C/ Martoo Consulting

         Proposal                            Development Permit for Material Change of Use for a Detached
                                             House

         Properly Made Date                  22 December 2014

         Decision Due Date                   12 March 2015

         Number of Submissions               Nil


         PROPERTY DETAILS

         Property Address                    146 Solar Road, Cooroy Mountain

         RP Description                      Lot 14 on SP223759

         Land Area                           4.325 ha

         Existing Use of Land                Vacant


         STATUTORY DETAILS

         SEQRP Designation                   Regional Landscape and Rural Production

         Locality                            Cooroy & Lake Macdonald

         Zone                                Rural & Open Space Conservation

         Overlays                            Biodiversity Overlay (Riparian Buffer & Environmental Protection)
                                             Natural Resources Overlay (Water Supply Catchment)
                                             Natural Hazard (Bushfire Hazard)

         Assessment Type                     Inconsistent - Impact




                                                                                                    Page 11 of 147

Section 12

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                    3 MARCH 2015


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 3 March 2015 regarding Application No. MCU14/0103 for a
Development Permit for Material Change of Use for a Detached House situated at 146 Solar
Road, Cooroy Mountain and
A.   Approve the application in accordance with the following conditions:
     When Conditions must be Complied With
     1.    Unless otherwise stated, all conditions of this Decision Notice must be complied
           with prior to the use commencing, and then compliance maintained at all times
           while the use continues.
     Approved Plans
     2.    Development undertaken in accordance with this approval must generally
           comply with the approved plans of development. The approved plans are listed
           in the following table unless otherwise amended by these conditions.
      Plan No.            Rev.    Plan/Document Name                            Date
      A101                L       Cover Sheet prepared by Southern Cross        26/11/2014
                                  Design & Drafting
      A102                L       Site Plan prepared by Southern Cross Design   26/11/2014
                                  & Drafting
      A104                L       Ground Floor Plan prepared by Southern        26/11/2014
                                  Cross Design & Drafting
      A105                L       Elevations prepared by Southern Cross         26/11/2014
                                  Design & Drafting
     Landscaping
     3.    Existing trees on the site and within road reserves must be retained, except
           where required to be removed to accommodate the approved dwelling. In this
           regard, the removal of native vegetation must not extend beyond the approved
           building footprint.
     Other
     4.    Earthworks required on site must be carried out in accordance with Council’s
           Planning Scheme Policy PSP5 Engineering Design Standards, so as not to
           cause the additional ponding of water on any adjoining lands or concentrate or
           direct overland flow on to an adjoining property.
     5.    The approved dwelling must be serviced with a rainwater tank having a minimum
           storage capacity of no less than 60,000 litres.
     6.    External colours and finishes of the building must comprise muted/environmental
           tones that blend with the natural environment.
B.   Find the following are sufficient grounds to justify the decision despite the conflict with
     the Planning Scheme:
     1. The proposed development is appropriately sited, will not require the removal of
        any existing vegetation within the Open Space Conservation zone, and is within an
        existing disturbed part of the site.

     2. The proposed house does not conflict with any of the values intended to be
          protected by the Open Space Conservation zone and will not adversely impact on
          the Mount Cooroy Conservation Park.




                                                                                    Page 12 of 147

Section 13

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  3 MARCH 2015


REPORT
1.   PROPOSAL
The application seeks approval for a detached house within the Open Space Conservation
zone at 146 Solar Road, Cooroy Mountain. The 4.325ha subject lot has a split zoning (Rural
and Open Space Conservation). A zoning map of the subject site is included below.




In 2008, the Open Space Conservation zoned portion of the lot was excised from the
adjoining Mount Cooroy Conservation Park by the State, so that all existing buildings,
paddocks and fences were maintained within the relevant lot. The boundary realignment
followed the existing vegetation constraints and allowed for existing stock yard structures to
be incorporated within private land rather than state land.

The applicant proposes to locate the new house within an area zoned Open Space
Conservation. The application is before Council as a detached house is an inconsistent use
within the Open Space Conservation zone.
2.   SITE DETAILS
2.1. Background
On the 11 September 2008, Council issued an approval for a boundary realignment,
following the State’s agreement to do a land swap with part of lot 14 and the Mount Cooroy
Conservation Park, thereby creating the subject lot (08/1226).
2.2. Site Description
The subject site is 4.325 ha and is located 1.5km to the east of Mount Cooroy. The site
gently slopes from the top of a small spur located along the south western portion of the site
down to the north eastern boundary.



                                                                                  Page 13 of 147

Section 14

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   3 MARCH 2015


The site is currently vacant with recent earthworks undertaken on the high point of the site to
establish the proposed house site area. Existing vegetation is limited to a strip along the
eastern boundary and scattered trees in the centre of the site.

Access is gained via an easement from Solar Road, which forms part of the Sunshine Coast
Council local government area.
2.3. Surrounding Land Uses
The site adjoins similar sized rural lots. To the north is the Mount Cooroy Conservation Park,
which forms a continuous parcel that contains the majority of the mountain in state
ownership.
3.   ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of
the following statutory planning instruments to the extent they are relevant to the
development:
   State Planning Policy;
   the South East Queensland Regional Plan;
   State Planning Regulatory Provisions; and
   The Noosa Plan;
Of these, the statutory planning instruments relevant to this application are discussed in the
sections that follow.
3.2. State and Other Statutory Instruments
State Planning Regulatory Provisions
The proposal is for a single detached house within the Regional Landscape and Rural
Production Area and is consistent with the SEQ Regional Plan Regulatory Provisions.
3.3. Statutory Instruments – Planning Scheme
The subject site is located in the Cooroy & Lake Macdonald Locality and is zoned Rural and
Open Space Conservation. The proposed use is identified as an inconsistent use in the
Open Space Conservation zone and is required to follow an impact assessable application
process.
Locality Provisions
The Overall Outcomes for the Open Space Conservation zone seek the natural
environmental values warranting conservation status are protected and appropriately
managed to the general exclusion of development.
The proposed detached house is to be located more than 40m away from the natural
bushland areas within the Mount Cooroy Conservation Park. The development is also
located within a disturbed part of the site, previously used for agricultural sheds. The
proposal is consistent with development on the adjoining rural zoned lots and includes
adequate separation to the vegetated areas to the north.
Council’s Principal Strategic Planner acknowledges that the current zoning does not reflect
the current tenure and the land exchange with the Mount Cooroy Conservation Park area,
which occurred in 2008. The current round of amendments to The Noosa Plan do not
propose to make any changes to individual zonings of properties and this matter will need to
be addressed in the new Planning Scheme.



                                                                                   Page 14 of 147

Section 15

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  3 MARCH 2015


The proposed development is appropriately sited, and will not impact on the adjoining
conservation values of Mount Cooroy Conservation Park, meeting the locality outcomes.
Land Use & Works Provisions
The Detached House Code is the most applicable code relating to the application. The
development generally complies with the code. Standard conditions can be applied relating
to water storage requirements, landscaping and colours of buildings.
Overlay Provisions
The proposed detached house does not trigger assessment against any of the overlays.
4.      CONSULTATION
4.1. IDAS Referral Agencies
Nil
4.2. Other Referrals
The application was forwarded to the following internal Council specialists:
      Coordinator Engineering Assessment
      Ecologist
4.3. Public Notification
The application was publicly notified for 15 business days in accordance with the
Sustainable Planning Act 2009. No properly made submissions were received.
5.      CONCLUSION
The application is for a detached house within the Open Space Conservation Zone. The use
is identified as an inconsistent use within the zone, subject to impact assessment. No
submissions were made during the public notification period.

Despite the proposed detached house being an inconsistent use within the zone, the
application is recommended for approval for the following reasons:
1.      The proposed development is appropriately sited, will not require the removal of any
        existing vegetation within the Open Space Conservation zone, and is within an existing
        disturbed part of the site.
2.      The proposed house does not conflict with any of the values intended to be protected
        by the Open Space Conservation zone and will not adversely impact on the Mount
        Cooroy Conservation Park.

Departments/Sections Consulted:

      Community Services                     x   Planning & Infrastructure
      Disaster Management & Public Order         Building & Plumbing Services
      Waste & Environmental Health           x   DA Planning
      Community Facilities                   x   Strategic Land Use Planning
      Cultural Facilities                        Asset Design & Investigations
                                                 Asset Planning
                                                 Civil Operations
                                                 Environment

      Executive Office                           Corporate Services
      Community Engagement                       Finance
      Customer Service                           ICT
      Executive Support                          Procurement & Fleet
      Governance                                 Property & Facilities
      Human Resources                            Revenue Services




                                                                                  Page 15 of 147

Section 16

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 16 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                               3 MARCH 2015

                Attachment 1 — Proposal Plans

                                                 Sm     "40:                                                      COUNTY of March
                                                        028,   :                            Cs                    AREA: 4325ha
                                                      %,.
                                   és PROPOSED                          .
                                  3  f RESIDENCE                                                              GENERAL NOTES
                                 re                             a             %,
                                  |         oe        —         *           B,%.                               * pres © ocoumencuand cf conecan
                                      aS                                     e %,                              2. Te deniing & rot D exceed BS ative te
                                  |                     POO                    >                                Neate! Gere Lm,
                                 +t    36520-———— nog Wfrehas S3/S                                             a Temmtied mo atice enxmsarves tobe
                                s Zea                oe  ae       \                                            « Trenepeenpeaeanes
                                        SS                    La                                                 = pw Loca fogs anets
                                &¥    Se           SSA                             s                             a
                                2 pS                       rh WA\\\                  ie                        SS Stamwane bone men water tw ant
                                   <     tf Sarees | \ § iy}      \\ \)            2 g                         © Nicaareipee oe Home UIC Numb ot as
                                   y                                                                           7. Atksmensions are m mainetes
                                   |      :    Sete gi        A                     Me                         0 Heamehonte am roter Cngnma’ donagn and dete
                                 \_ tl          I |  \ {i Sea  \  - i  4163             C.                     & Mi dimeraiore to be checked prter to cormrutien
                                a         ‘        | Ni    LX  8 \iiy)                 ,,
                                38                      PSs)    JH}                             1
                                 39                        LUT                                    Pa,
                       garwemees |S y— 4, 4             fy   }//     } -                        et,
                        —             Ss                          {ff                               “ens,
                                    ISSA                            ,                                  "oN
                                  BB       oe Xe
                                  8                    ee        ea
                                   3 ‘3                HE                                             sg
                                      Ly SSF sa                                                        or
                                    (PSS                  et                                         ee

                                ge
                               gg
                               ae                                    4
                                }                                                                      [Name Area |
                                {                                                                     [ving                   844m
                               }
                               }                                                                          [Pergok/deck smi
                               |                                                                       [Verandah underroott __|54.0m?_|
                               !                                                                       Garaget dBm?
                              }                                                                        [Garage2_ 4B Am?
                              {
                              {                                                                       [Pool Decknoroott     |2t.am?__ |
                                                                                                       [Pool Decknoroot2 21.9? _|
                                4045,
                                4.245 Se                                                              JEntrance Portico      16.1?
                                    ™      mee                                                        [eso Se
                                                 A                                                    Grand total             7578m*
                      SITE PLAN
                      Seam 1: 1000

                           Orounwa Ratranw

                                                                                                                               Page 16 of 147

Section 17

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 17 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                            3 MARCH 2015

                                                                  t
                                                                   -

                       TT        ie                         |              kk
                  fF                 Nw                                     |
                       3     3 1                A wTCO            L,   {
                             f  AeA NNN                                if
                                EULICTINPCRPRT eM TL === TELL Ler
                                              it!      Ty     “s    s|\
                           ci                 ——                   un | \ \\
                            beer econ |            — HN               Laks |
                                      ———       ENTRANCE        a   4 sf \

                                                                  |   PROPOSED STUDIO
                                                                      PROPOSED GARAGE
                                                              {   i :  —
                                                                  |      er
                                                                          ‘

                                                                            Page 17 of 147

Section 18

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 18 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                   3 MARCH 2015

                                            ed
                                            =
                                              Bi    IN
                                               -    =
                                           —        es
                                                    i

                                       ip      ==
                                    s / |        i
                                 ,   J |          J

                                   : i          —

                                          yy

                                      ©
                                    ees    21 NER

                                                 a
                                        i                          3
                                          meee                     !
                                          VS oe                    >
                                            .
                                           AN :                    Q
                                            —                      Ma

                                                                    Page 18 of 147

Section 19

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                 3 MARCH 2015


3                      DEVELOPMENT APPLICATION FOR MATERIAL CHANGE OF USE FOR A
                       DETACHED HOUSE SITUATED AT 71 SEAVIEW TERRACE, SUNSHINE BEACH -
                       MCU14/0084
DOCUMENT INFORM AION




Author                         Development Planner, Glen Conforti
                               Planning & Infrastructure Department

Index                          ECM/ Application/ MCU14/0084

Attachments                    1.   Proposal Plans



        APPLICATION DETAILS

        Applicant                          Universal Property Company Establishment
                                           C/ Martoo Consulting

        Proposal                           Development Permit for a Material Change of Use for a Detached
                                           House

        Properly Made Date                 29/10/2014

        Information Request Date           Not Applicable

        Information Response Date          Not Applicable

        Decision Due Date                  12/03/2015

        Number of Submissions              Not Applicable (Code Assessable)


        PROPERTY DETAILS

        Property Address                   71 Seaview Terrace, Sunshine Beach

        RP Description                     Lot 1 RP 197117

        Land Area                          9942m²

        Existing Use of Land               Vacant


        STATUTORY DETAILS

        SEQRP Designation                  Urban Footprint

        Locality                           Eastern Beaches

        Zone                               Rural Settlement and Open Space Conservation

        Overlays                           Biodiversity Overlay – Environmental Protection
                                           Natural Hazards Overlay – Low Potential Acid Sulfate Soils
                                           Natural Hazards Overlay – Landslide Hazard
                                           Natural Hazards Overlay – Medium Bushfire Hazard
                                           Natural Resources Overlay – Coastal Protection Area

        Assessment Type                    Code Assessable



                                                                                                  Page 19 of 147

Section 20

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                3 MARCH 2015


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 3 March 2015 regarding Application No. MCU14/0084 for a
Development Permit for Detached House situated at 71 Seaview Terrace, Sunshine Beach
and approve the application in accordance with the following conditions:
     PLANNING
     When Conditions must be Complied With
1.   Unless otherwise stated, all conditions of this Decision Notice must be complied with
     prior to the use commencing, and then compliance maintained at all times while the
     use continues.
     Approved Plans
2.   Development undertaken in accordance with this approval must generally comply with
     the approved plans of development. The approved plans are listed in the following
     table unless otherwise amended by these conditions.
      Plan No.         Rev.   Plan, prepared by                              Date
      SK 02.02         P1     Survey Plan, prepared by NRA                   23.10.2014

      SK 03.01         P1     Level 1 Floor Plan, prepared by NRA            23.10.2014

      SK 03.02         P1     Level 2, prepared by NRA                       07.10.2014

      SK 03.03         P1     Level 3 Floor Plan, prepared by NRA            23.10.2014

      SK 05.01         P1     Section 1, prepared by NRA                     07.10.2014

      SK 05.02         P1     Section 2, prepared by NRA                     07.10.2014

      SK 05.03         P1     Section 3, prepared by NRA                     07.10.2014

      SK 05.06         P1     3D Views, prepared by NRA                      07.10.2014


     Building Height
3.   The maximum height of the development must not exceed 8 metres above the finished
     ground level and the natural ground surface and 2 storeys.
4.   Certification must be submitted to Council from a Licensed Surveyor which certifies
     that the building does not exceed the maximum height requirement of this Decision
     Notice.
     Performance Bond
5.   Security in the form of a cash bond or trading bank guarantee to the sum of $40,000
     must be submitted to Council, to secure performance of all conditions of this approval,
     prior to the issue of a Development Permit for Operational Works. The cash bond or
     trading bank guarantee will be returned on performance of the conditions of approval
     less any costs incurred by Council in respect of enforcing performance of this permit.
     Council reserves the right to call upon the bond or guaranteed sum to effect
     compliance with conditions.
     Built Form
6.   The proposal must incorporate a green roof as indicated on the approved plans.




                                                                                Page 20 of 147

Section 21

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  3 MARCH 2015


      Setbacks
7.    Earth mounding for the green roof must not exceed 1m above the natural ground level
      within the southern boundary setback area.
8.    The combined height of the block wall and the beam on top of the contiguous piles
      along the western boundary must not exceed 1m above the natural ground level.
9.    The building must be setback 6m from the southern boundary, except for construction
      elements such as contiguous piling and the ‘dry zone’ which must be setback a
      minimum of 1.5m at the light court. The contiguous piling and the ‘dry zone’ to the east
      and west of the light court must be setback in accordance with the approved plans.
      Landscaping
10.   All landscaping works must be undertaken in accordance with an Operational Works
      approval and Planning Scheme Policy PSP3 Landscaping Plants and Guidelines. A
      landscape plan prepared by a suitably qualified person must be submitted and include
      in particular:
      a.   further detail on the ‘green roof’ specific for the development
      b.   area of the roof that is proposed ‘green’ and areas that are proposed off form
           concrete
      c.   species list and density of plantings
      d.   incorporation of screening plants along the southern boundary adjacent to the
           light court and stairs
11.   Existing trees on site must be retained, except where required to be removed to
      accommodate the approved dwelling. In this regard, the removal of vegetation must
      not extend beyond 3m of the building footprint.
12.   No clearing is permitted within the Open Space Conservation zone.
13.   All trees being retained and the Open Space Conservation zone must be protected
      from clearing or construction activities by:
      a.   clearly delineating the Open Space Conservation zone boundary with protective
           fencing
      b.   clearly marking vegetation to be retained with flagging tape
      c.   installing protective fencing around the drip line of the vegetation
      d.   restricting stockpiling, storage and vehicle parking to those areas which are
           already cleared
      e.   using low impact construction techniques around vegetation.
      Coastal Protection
14.   External colours and finishes of the building must comprise muted/environmental tones
      that blend with the natural environment.
      Vehicle Access
15.   The construction and associated activities (deliveries, parking, etc.) must not impede
      the legal use of the access handle by any benefitted property or person.




                                                                                  Page 21 of 147

Section 22

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   3 MARCH 2015


      Construction
16.   A Condition Survey must be carried out on adjoining buildings, structures and services
      prior to any demolition, excavation or construction works taking place on site. If
      distress already exists, a photographic survey should be undertaken, the distress
      measured and a plan to monitor changes to distress must be implemented. Copies of
      these surveys must be submitted to Council for its records.
17.   A Construction Management Plan for the development must be submitted to and
      approved by Council at least 5 working days prior to the commencement of any
      Building works or at least 5 working days prior to the pre-start meeting for Operational
      Works. The Construction Management Plan shall include but not be limited to:
      a.   site working hours
      b.   communication and consultation processes with surrounding premises.
      c.   control and suppression of –
           (i)     noise
           (ii)    vibration;
           (iii)   dust;
           (iv)    odours and exhausts control; and
           (v)     site working hours
      d.   employee and contractor induction and education processes.
18.   A Traffic Management Plan for each separate construction phase of the development
      must be submitted to and approved by Council at least 5 working days prior to the
      commencement of any works or at least 5 working days prior to the pre-start meeting
      for Operational Works. The Traffic Management Plan must include but not be limited
      to:
      a.   limiting the routes for the heavy vehicles to the major road network and define
           the route to the site
      b.   indicate provision for on-site and off-site parking and shuttle buses (if required)
           for the required workforce
      c.   indicate the location of loading and unloading areas within the site
      d.   indicate the location of any “holding” areas for heavy vehicles
      e.   operating hours.
19.   Construction staff must not park within Seaview Terrace, the Council carpark in
      Seaview Terrace, McAnally Drive or any other surrounding street. Parking must either
      be on site or at a suitable off-site location serviced via a shuttle bus. Details must be
      included in the Traffic Management Plans for the site.
      Earthworks
20.   Earthworks required on site must be carried out in accordance with Council’s Planning
      Scheme Policy PSP5 – Engineering Design Standards so as not to cause the
      additional ponding of water on any adjoining lands or the blockage of, or interference
      with, any natural watercourses.
21.   The use of vibratory equipment of any kind is not permitted to be used (including
      vibrating rollers and the use of vibrating installation techniques for sheet piling and
      other construction vibrations caused by excavating, earthmoving or demolition
      machinery or other similar construction techniques) unless approved and supervised
      by a Certified Geotechnical Engineer. Under such circumstances the operator of such
      equipment must at all times comply with the directions of the Geotechnical Engineer.



                                                                                   Page 22 of 147

Section 23

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   3 MARCH 2015


22.   The excavation of the site and the construction of the proposed works must not have
      any adverse effects on the stability of adjoining buildings and/or structures and/or
      services and/or lands. In this respect, a Registered Professional Engineer Queensland
      must supervise the excavation of the site and the construction of the new works to
      determine whether any additional measures are required to protect the stability of
      adjoining buildings and/or structures and/or services and/or lands.
      Site Stability
23.   The design and construction of the development must be carried out generally in
      accordance with the Geotechnical Study prepared by Morrison Geotechnic Job:
      DE14/231 dated October 2014 and the “Structural Design Concept” Job No14517
      Issue B prepared by TOD Noosa dated 29 July 2014. The documents must be revised
      to include the following:
      a.    a contingency plan and alternative design should the piled footing system as
            designed not be achievable due to unsafe working conditions or unexpected
            ground conditions
      b.    the document must be submitted to Council at the time of Operational Works
            approval.
24.   Should the recommendations of the geotechnical report or contingency plan require
      any part of the works (including excavation, retaining structures, tie backs, etc.) to be
      temporarily or permanently constructed within any adjoining property, a letter of
      authority from the adjoining property owner(s) must be obtained prior to the issue of
      the building permit.
25.   A suitably qualified and accredited consultant must undertake a detailed check to
      establish that a stable working platform has been constructed in accordance with the
      design prior to the use of heavy equipment or plant likely to cause vibrations on the
      site. Certification of the works to this stage must be provided to Council.
26.   A suitably qualified and accredited consultant must undertake a detailed check to
      establish that the screw pile and CFA piles have been installed in accordance with the
      design and that the required pile capacities have been achieved. Certification of the
      pile systems must be provided to Council.
27.   At the completion of the development a suitably qualified and accredited consultant
      must provide certification to Council that states that:
      a.    the development has been undertaken in accordance with the design
      b.    the development will not have any long term effects on the stability of the subject
            site or any adjoining properties
      c.    the site has a minimum factor of safety against landslip of 1.5.
      Stormwater
28.   A detailed stormwater drainage design prepared and certified by an RPEQ must be
      provided for the development. The works must be undertaken in accordance with an
      Operational Works approval and must include in particular:
      a.    the development must not cause an increase in the volume and velocity of
            waters discharged into the existing gully at the north of the house site in a Q2
            (0.393AEP), Q5 (0.181AEP), Q10(0.095AEP), Q50 (0.020AEP)and Q100
            (0.010AEP) rainfall event
      b.    all stormwater collected and outlet from the development (including the external
            catchment and driveway areas) must be outlet below the level of 26m AHD




                                                                                   Page 23 of 147

Section 24

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                     3 MARCH 2015


      c.    stormwater outlets must not have potential to create concentrated flow paths or
            generate flows sufficient to erode or scour the loose surface sands
      d.    all stormwater outlet locations must include energy dissipaters designed in
            accordance with QDUM in conjunction with level spreaders constructed parallel
            to the contour to facilitate dispersed sheet to disperse flows across the site to
            pre development velocities in a Q2 (0.393AEP), Q5 (0.181AEP), Q10
            (0.095AEP), Q50 (0.020AEP) and Q100 (0.010AEP) rainfall event at the location
            where waters discharge from the level spreaders
      e.    include detail design which demonstrates that drain outlets do not have any
            realistic potential to create concentrated flow paths or generate flows sufficient to
            erode or scour the loose surface sands
      f.    stormwater infiltration pits are prohibited
      g.    excavation/filling for stormwater infrastructure within the Open Space
            Conservation zone must:
            (i)   be undertaken by hand and not by mechanical means
            (ii) be aligned and located to avoid disturbance to existing vegetation
            (iii) the exact alignment of infrastructure must be determined onsite with a
                  Council delegate
      h.    include Erosion and Sediment Control measures in accordance with industry
            best practice (IECCA and the Manual for Erosion and Sediment Control Volume
            1.2 by Sunshine Coast Regional Council) to demonstrate that erosion is unlikely
            to occur during the construction phase of the development
29.   Until such time all construction, landscaping and building works are complete and the
      site is effectively stabilised, construction and vegetation clearing activities must be
      managed such that appropriate emergency stabilization measures are retained on the
      site and implemented prior to rainfall to prevent erosion.
30.   Pool water overflow must be discharged to sewer.
31.   All site fencing must be installed and maintained to facilitate natural overland flows.
      Fencing must not cause collection and concentration of stormwater flows.
      General
32.   Any damage caused to any public utility during the course of construction must be
      repaired to council’s standards and at no cost to Council.
33.   Any alteration of any public utility or other facilities necessitated by the development of
      the land or associated construction works external to the site must be at no cost to
      Council.
34.   The transportation of all materials to and from the site must be undertaken in a manner
      such that no particle matter escapes onto a public road. All vehicles carrying materials
      either to or from the site must be covered to prevent materials including dust being
      windblown from the vehicle.
      Advisory Notes
      Building and Construction Industry (Portable Long Service Leave) Levy
1.    The QLeave levy must be paid prior to the issue of a development permit where it is
      required. Council will not be able to issue a Decision Notice without receipt of details
      that the Levy has been paid. QLeave contact: 1800 803 481 (free call) or (07) 3212
      6855.




                                                                                     Page 24 of 147

Section 25

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  3 MARCH 2015


      Co-ordination of Operational Works Assessment
2.    Additional application fees apply to Operational Work applications where the different
      aspects of the works are lodged separately. Significant savings in application fees will
      result if all works are lodged in a single application.
      Qualified Person
3.    For the purpose of preparing a Geotechnical Report, and for certifying geotechnical
      stability for the development, a qualified person is considered to be a person who:
      (a) is a Registered Professional Engineer of Queensland (RPEQ); and
      (b) has a degree in civil engineering or engineering geology; and
      (c) has a minimum of 5 years experience in the field of geotechnical engineering or
             engineering geology.

REPORT
1.    PROPOSAL
The proposal is for a Development Permit for a Material Change of Use – Detached House.
The 2 storey 1361m² dwelling is triangular in shape and consists of a curved ‘green roof’ and
3 levels. Level 1 includes a games room, cinema, gym, steam room, sauna,
treatment/relaxation room and an outdoor entertainment area overlooking a pool and
Jacuzzi. Level 2 consists of the kitchen, living, media room and seven bedrooms all with an
ensuite. Level 3 comprises vehicular access, 6 vehicle accommodation, office, entry and a
bedroom. The applicant has provided a Stormwater Management Report, Landscaping
Report for the Green Roof, Structural Report, Geotechnical Report and a Preliminary
Construction Management Plan addressing carparking onsite during construction. The
application is before Council as the site is a prominent location. Figure 1 below shows the
proposal inserted into a photo.




Figure 1 – Photo insert of the proposal



                                                                                  Page 25 of 147

Section 26

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                        3 MARCH 2015


2.    SITE DETAILS
2.1. Background
Council approved a Material Change of Use for a Detached House on 3 October 2011. The
dwelling was assessed against the superseded planning scheme and was impact
assessable. A submitter and the applicant appealed Council’s decision. The applicant
subsequently withdrew from the appeal and consequently the house was refused on 1
November 2013.
2.2. Site Description
The lot has an area of 9942m², is rectangular in shape, adjacent to the southern boundary of
Noosa National Park and accessed by approximately a 6 metre wide shared driveway
easement from the Seaview Terrace cul-de-sac. The lot slopes steeply from the western
boundary to the northeast and east toward a small valley within the Noosa National Park and
the frontal dune of Sunshine Beach. The dune within the lot generally curves around towards
the northwest. Its profile is steeply sloping between 23° and 32°, with a variety of coastal
dune vegetation coverage. A wetland fed from a stream flow from Noosa National Park
exists in the northeast portion of the lot. The location of the subject site is shown in Figure 2
below.




Figure 2 - Subject Site is the most northern residential lot adjacent to the Sunshine Beach and Noosa
National Park.




                                                                                        Page 26 of 147

Section 27

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  3 MARCH 2015


2.3. Surrounding Land Uses
The lot is bounded to the north by Noosa National Park, to the east by Sunshine Beach
(adjacent to the dog beach) and residential dwellings to the south and west.
3.   ASSESSMENT
3.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of
the following statutory planning instruments to the extent they are relevant to the
development:
   State Planning Policies;
   the South East Queensland Regional Plan;
   State Planning Regulatory Provisions;
   any Structure Plan or Master Plan in place for declared areas;
   any Preliminary Approval Overriding the Planning Scheme for the land;
   the Planning Scheme for the local government area; and
   any Temporary Local Planning Instrument in place for the local government area.
Of these, the statutory planning instruments relevant to this application are discussed in the
sections that follow.
3.2. State and Other Statutory Instruments
State Planning Policies

The proposal meets the Integrated Development Assessment requirements of State
Planning Policy 2014.
South East Queensland (SEQ) Regional Plan 2009 - 2031
The site is located within the Urban Footprint of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
State Planning Regulatory Provisions
The following State Planning Regulatory Provisions apply to the application:
   SEQ Regional Plan Regulatory Provisions
The proposal is for an urban activity within the Urban Footprint and is consistent with the
SEQ Regional Plan Regulatory Provisions.
State Development Assessment Provisions
The site is mapped as being located in a Coastal Management District. In accordance with
the Sustainable Planning Regulations a Material Change of Use requires referral to the State
where building work is carried out completely or partly in coastal management district that
has a gross floor area (GFA) greater than 1000m². Therefore, the proposal with a GFA of
1361m² is subject to assessment against Module 10 of the State Development Assessment
Provisions – Tidal works, or development in a Coastal Management District State Code.
The State Code seeks to minimise the potential risks from coastal hazard inundation by
maintaining the protective functions of landforms in a coastal hazard environment. The
proposal complies with the State Code as it is setback between 115m – 200m from the
beachfront and between 60m - 120m from the seaward boundary, well above any impacts
from inundation. The native vegetation within this setback is being retained and is also
protected by the Open Space Conservation zoning and the Biodiversity Overlay of the


                                                                                  Page 27 of 147

Section 28

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                    3 MARCH 2015


Planning Scheme. A preliminary Stormwater Water Management Plan has been submitted
by a suitably qualified engineer to demonstrate stormwater can be addressed without
negative impacts on the dune system.
3.3. Statutory Instruments – Planning Scheme
The subject site is located in the Eastern Beaches Locality and is zoned Rural Settlement
and Open Space Conservation. The proposed use is contained within the Rural Settlement
zone and is therefore identified as consistent use within this zone and is required to follow a
code assessable application process. No building works are proposed within the area zoned
Open Space Conservation.
Land Use & Works Provisions
The application has been assessed against the Detached House Code. The pertinent issues
arising out of the assessment against the codes are discussed below:
Setbacks
The Code requires a 6m setback to the western and southern boundaries and 20m to the
Noosa National Park boundary. Some areas of the ‘green roof’ earth mounds taper down
into the southern boundary 6m setback. These encroachments are mounded fill designed to
allow the ground level to integrate into the off form concrete ‘green roof’ sub-structure. These
encroachments raise no concern because of the landscaping nature of the encroachment.
However, a condition may be imposed to ensure the off form concrete ‘green roof’ sub-
structure maintains the required 6m and the mounded fill does not exceed 1m above the
natural ground level so not to cause any amenity issues.
The proposal complies with other boundary setback requirements apart from some proposed
structural construction elements such as contiguous piling and retaining walls located within
the western and southern setback areas. These class 10b structures are either sub surface,
at ground level or less than 1m above the natural ground level and are exempt from
Schedule 1 – Setbacks of the Planning Scheme.
The driveway is located along the western boundary within the setback. A retaining wall is
proposed along the length of the driveway to support the structural integrity of the western
neighbour’s pool and for the cut of the driveway. The proposal does not raise any amenity or
privacy concerns as the neighbouring pool deck, built close to the boundary, is considerably
higher (approximately 4m higher) than the driveway and is unlikely to be seen by the
neighbour. The structural design of the retaining wall does not allow for any landscaping
along this boundary. However, the ‘green roof’ design will provide a landscaped view from
the neighbouring property which would be softer than viewing a traditional tile or colorbond
roof finish.
Construction issues
Given the building area is located at the end of an access handle, the lot is steeply sloping
and the scale of the building, the proposal presents some significant building challenges. A
slope stability report, preliminary stormwater management plan and a preliminary
construction management plan have been submitted to demonstrate the development can
be constructed safely and can minimise impacts on the surrounding residents.
Parking raises some concern as the site has limited scope for parking contractor vehicles,
given the site constraints and that Seaview Terrace is narrow and parking is limited to only
the western side of the street. To help mitigate parking problems in Seaview Terrace and
surrounding streets, a condition may be imposed prohibiting construction vehicle parking
along Seaview Terrace or surrounds. This has been highlighted with the applicant and has
been addressed in the preliminary construction management plan.




                                                                                    Page 28 of 147

Section 29

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                       3 MARCH 2015


Open Space Conservation zone
Stormwater infrastructure
Given the sloping site and the sandy nature of the landform it is important that stormwater is
managed properly to maintain slope stability and negate any potential impact on the lot,
Noosa National Park and the neighbouring property. Therefore some stormwater
infrastructure is required to traverse the Open Space Conservation zone to disperse
stormwater below 26m AHD where the landform is flatter. The minor excavation required for
the infrastructure (likely to be 1 or 2 small PVC stormwater pipes) is unlikely to negatively
impact on the environmental values of the Open Space Conservation zone. To ensure the
installation does not impact on the vegetation or slope stability, a condition may be imposed
to ensure that low impact construction techniques are used. An operational works application
is required for stormwater management and installation.
Existing pathway
An existing pathway is located within the Open Space Conservation zone and a Coastal
Protection Area. The path is used for beach access and meanders through the property to
the unformed road reserve of the Esplanade and then to the beach front.
The intent of both the Open Space Conservation zone and the Coastal Protection area
overlay provisions are similar. The Coastal Protection provisions seek to ensure ‘that
development does not cause any significant adverse impacts on the coastal resources’ or
‘interrupt the natural cycles of erosion and accretion’. Over the years the path has integrated
with its surrounds and to date has not caused any significant impacts on coastal resources
or impacted on site stability. In terms of erosion and accretion, the path is constructed of
timber and finishes at the lot’s seaward boundary, which is setback approximately 70m from
the toe of the fore dune. It is therefore unlikely the path will interrupt these natural cycles into
the future, given the substantial setback to the fore dune. Retaining the pathway should not
have any adverse impacts on the environmental values of the land, Noosa National Park or
the fore dune. No works to the pathway are proposed as part of this application. Any future
works to the path would be subject to an operational works approval.
Natural Resources Overlay Code
The Natural Resources Overlay Code for Coastal Protection requires a minimum landscape
buffer of 5m to the seaward boundary and a building setback of 6m. The proposal complies
with these provisions being setback between 60m and 120m from the seaward boundary
and is retaining the existing native vegetation.
General
The proposal is sited wholly within the Rural Settlement zone of the lot where the vegetation
has been interfered with historically. The ‘green roof’ will soften the development when
viewed from Noosa National Park, the beach and surrounding properties. Although there is
some extensive cut and fill on a sloping site, the proposal steps down the slope and will
likely visually integrate into the hillside better than the surrounding traditionally designed
dwellings.


4.    CONSULTATION
4.1. IDAS Referral Agencies
The application was referred to the following IDAS Referral Agency:
Concurrence
State Development, Infrastructure and Planning




                                                                                       Page 29 of 147

Section 30

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  3 MARCH 2015


The Department is a concurrence agency as the proposal is for a material change of use,
being a residential use greater than 1000m² in a Coastal Management District. The
Department had no concerns with the proposal subject to conditions that minimise adverse
impacts on coastal resources and their values.
4.2. Other Referrals
The application was forwarded to Unitywater and the following internal Council specialists:
     Engineering Officer
     Environment Officer/Ecologist

5.     CONCLUSION
The proposal is a large scale dwelling that has been designed within the parameters
contained in the Detached House Code. The applicant has provided specialist reports and
engineering drawings that demonstrate the proposal can be constructed to maintain the
stability of the site, the safety of people and property. The proposal complies with the
provisions of the Detached House Code and the Natural Resources Overlay Code and is
recommended for approval, subject to conditions.

Departments/Sections Consulted:

     Community Services                     X   Planning & Infrastructure
     Disaster Management & Public Order         Building & Plumbing Services
     Waste & Environmental Health               DA Planning
     Community Facilities                       Strategic Land Use Planning
     Cultural Facilities                        Asset Design & Investigations
                                                Asset Planning
                                                Civil Operations
                                                Environment

     Executive Office                           Corporate Services
     Community Engagement                       Finance
     Customer Service                           ICT
     Executive Support                          Procurement & Fleet
     Governance                                 Property & Facilities
     Human Resources                            Revenue Services




                                                                                  Page 30 of 147

Section 31

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015


                                                                    Attachment 1




                                                   Page 31 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA         3 MARCH 2015

                                                                                           Attachment 1
                                                       v *
                                                            A
                                                   J          ™~
                                                /                ™
                                                                    \>
                                              if                       Se
                                           is                            N
                                         }                                  \
                                      if                                       J
                                 sia                                        4
                                 Y

                         as,                   ——_——     ot        ‘
                              =a
                         ee       ?                           fe
                     .   a       7
                  , slat      ee, EG                        /
                e        a   :  a %/         oo * :  ~   J       i
                  f                te if                   ;
         =    2          ho! Dre          a           7         =
              als   3    a         4) OIE    1 ee , V4
                                      pote) ee ao,

                                        =             ii      ot
   nr@                                                             2°. SSeS aus
 |    —         |» secon romace aacrne scr | mers                   ee iii ompes BI | | | |
                                                         Page 31 of 147

Section 32

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 32 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                             3 MARCH 2015

                                     5                       3 ie oy tie 3     roa          d, : }
                                                                      ed             fe ; f mea
                                                                 a, Ceti, -      PITTA  LS | enw PF
                                                                »  ae SAY SORT        VST Fe 5 i .
                                                               *?) ;   ¥ _       ayy      iy    5
                                                                a¢,       Saree ERG PD          te |
                                                            Coy              Oo   IM NS>

                                                                  a
                                                                                                 i?

             .                                                                                                  PRELIMINARY

                                                                              Page 32 of 147

Section 33

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 33 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                        3 MARCH 2015

                                                                            Baus
                                                              _    ys                                         y
                                                           ry                  ~ 7     ape: “=               4
                                                             —                      Pe                      €
                           a      EF bes    ‘i           i} =        Ky     . i        a    ‘eg
                       A   SIG                        MS,                  -BUA
                      \    -     =    ~    nN        \.! j — ron,          _—  n oe  J ;       .               wawee
                                 .                  o    oe     ee        eo       J
                                                   Oe ating     SS       an       7 all
                       2) theta,                                                     m                               4

     nra                                                                                                  PRELIMINARY

                                                                        Page 33 of 147

Section 34

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 34 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                    3 MARCH 2015

                                                                          to  '   a       aa
                                                              a nt Pee   a J     _
                                                           a   cs  og            na

                                              “—                                     r
                                         mf =                                   9                        pean ci
                                       ey n. i ery _——                      >
                     X       —             i Ca         = a      » Ps 2 \       ra    y,
                             =e                                     =   OOD    ay
                              Sea etee tt tr epeporh taeee      =o"          4
                             i ta lee see                                 Eat
                                                        _                    —
                                          as                                       <=           cialiaiidheiae

      n ra                                                                                          PRELIMINARY
   |      a           |» seven remace DINOS BRAM  | wee race                         cael va[Soeaes BI |  |  |    |
                                                                    Page 34 of 147

Section 35

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 35 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                  3 MARCH 2015

             nese            J   j                    Se ce                        ce   ee
                                           i i iy     ¥) Pia                                 livia | a0
              ee                                                  Ma

     nra                                                                           Sn
   |      —_          [> TEAR TERRACE. TUNED BEECH | emrows                        ee zi i cari  |   | |        |
                                                                  Page 35 of 147

Section 36

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 36 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA          3 MARCH 2015

        —                -       Pa |e                     ae,
                                 oy, . “wed Pas |   ~~
                                       . ad ir     ee Ss
                                7      oa         -
                                  eS ae            ‘4   i
            :                  Ff | |S. 7           ee
                                 |
                                    —_~«

   nra                                                                                  PRELIMINARY
|                 perme fame i” OL LI
                                                           Page 36 of 147

Section 37

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                      3 MARCH 2015


4      NEGOTIATED DECISION REQUEST FOR RECONFIGURING OF 3 LOTS INTO 17
       LOTS - REC13/0146 SITUATED AT 55 LAKE MACDONALD DRIVE, COOROY
Author             Development Planner, Glen Conforti
                   Planning & Infrastructure Department

Index              ECM/ Application/ REC13/0146

Attachments        1.   Proposal Plans
                   2.   Playground Layout Plans
                   3.   Infrastructure Agreement



APPLICATION DETAILS
                              Valkev Pty Ltd
Applicant
                              Negotiated Decision Request for Reconfiguring of 3 lots into 17 lots
Proposal
                              21/11/2013
Properly Made Date
                              18/12/2013
Information Request Date
                              06/06/2014
Information Response Date
                              12/03/2015
Decision Made Date
                              Not Applicable
Number of Submissions


PROPERTY DETAILS
                              55 Lake Macdonald Drive, Cooroy
Property Address
                              Lots 136 & Lot 137 MCH 978 & Lot 2 RP 173883
RP Description
                              6.04ha
Land Area
                              Vacant
Existing Use of Land


STATUTORY DETAILS
                              Urban Footprint
SEQRP Designation
                              Cooroy and Lake Macdonald
Locality
                              Detached Housing Zone
Zone
                              Biodiversity Overlay – Riparian Buffer
Overlays
                              Cooroy and Lake Macdonald
Assessment Type




                                                                                      Page 37 of 147

Section 38

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  3 MARCH 2015


RECOMMENDATION
That Council note the report by the Development Planner to the Planning & Organisation
Committee Meeting dated 3 March 2015 regarding a request for a Negotiated Decision
Notice for Reconfiguring 3 lots into 17 lots situated at 55 Lake Macdonald Drive, Cooroy and:
A.   Agree to change the Preliminary Approval to a Development Permit with a relevant
     period of 4 years;
B.   Agree to issue a Negotiated Decision Notice and change Condition 1 and 15 to read
     as follows:
           Stormwater Detention and Flooding
     1.    The Development must be carried out in accordance with the revised Stormwater
           Detention and Flooding Report, prepared by BSM, dated 10 February 2015.
           a.    Deleted
           b.    Deleted
           Active Park
     15.   Active park embellishments must be provided generally in accordance with
           drawing number 14/005-S01, titled Erindale Park, Cooroy Proposed Park Land
           Development Concept Plan, prepared by Play Environment Consulting dated
           17.11.14 and 14/005-S02, titled Erindale Park, Cooroy Proposed Park Land
           Development Concept Plan, prepared by Play Environment Consulting dated
           17.11.14. All works to be dedicated are “non-trunk infrastructure” for the
           purposes of the Sustainable Planning Act 2009.
C.   Execute the Infrastructure Agreement for the provision of Park embellishments.



REPORT
1.   BACKGROUND
Council issued a Preliminary Approval on the 18 December 2014 to subdivide 3 lots into 17
lots. The Preliminary Approval was issued instead of a Development Permit because the
applicant provided a flood detention strategy which raised concerns and posed unacceptable
risks to surrounding residents and to Council. A condition was imposed to ensure an
acceptable revised flood strategy was submitted prior to the issue of a Development Permit.

As part of the application the applicant requested to provide a playground in lieu of the Park
portion of the Infrastructure Charges under the provisions of the Sustainable Planning Act
2009. No park embellishments are identified in the Priority Infrastructure Plan and
consequently are not currently identified as Trunk Infrastructure. Therefore, to deliver the
Park embellishments an Infrastructure Agreement was proposed in lieu of the Park Charge
or if the Park Charges is paid, a refund of the Park Contribution amount paid.

The Park embellishments were discussed in the officer’s report at the time it was presented
to Council. The Infrastructure Agreement was not executed at the time as a draft
Infrastructure Agreement was being reviewed by Council’s solicitor.
2.   PROPOSAL
The applicant seeks to upgrade this Preliminary Approval to a Development Permit through
the negotiated decision process. The applicant has provided a revised flood detention
strategy in accordance with Condition 1 of this Preliminary Approval. The Infrastructure




                                                                                  Page 38 of 147

Section 39

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   3 MARCH 2015


Agreement for the Park embellishments has been checked by Council’s solicitor and signed
by the applicant.
The applicant requests:
1.   that Condition 1 be deleted as a conventional flood detention strategy has been
     provided;
2.   the Infrastructure Agreement for Park embellishments in accordance with Condition 15
     be executed; and
3.   condition 15 be amended to reflect the most recent Park embellishment plans.
A copy of the proposal plans are provided as Attachment 1; the Park embellishment layout
plans provided as Attachment 2 and the Infrastructure Agreement as Attachment 3.
3.   SITE DETAILS
3.1. Site Description
The site is traversed by two tributaries of Six Mile Creek, described as the eastern and
western tributaries. The western tributary runs from south to north and the eastern tributary
runs from east to the north west corner of the land. The land is pasture except for a narrow
stand of riparian vegetation along the tributaries and a low lying area to the southwest corner
of the lot. The site slopes gently from the northern boundary toward the tributaries. The
subject site is identified in Figure 1 below.




               Figure 3 - Locality Plan



                                                                                   Page 39 of 147

Section 40

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  3 MARCH 2015


3.2. Surrounding Land Uses
The land adjoins Lake Macdonald Drive to the east, detached housing lots to the north and
south, parkland and undeveloped Detached Housing zoned land to the west and Community
Services land approved for detached housing lots (applications REC13/0148 and
MCU13/0226 approved on 18 December 2014). The northern portion of land is approved for
detached housing (REC14/0008 and REC14/0009 approved by Council on 18 December
2014).
4.    ASSESSMENT
4.1. Instruments for Statutory Assessment
Under the Sustainable Planning Act 2009 the application must be assessed against each of
the following statutory planning instruments to the extent they are relevant to the
development:
    State Planning Policies;
    the South East Queensland Regional Plan;
    State Planning Regulatory Provisions;
    any Structure Plan or Master Plan in place for declared areas;
    any Preliminary Approval Overriding the Planning Scheme for the land;
    the Planning Scheme for the local government area; and
    any Temporary Local Planning Instrument in place for the local government area.
Of these, the statutory planning instruments relevant to this application are discussed in the
sections that follow.
4.2. State and Other Statutory Instruments
State Planning Policies

The proposal meets the Integrated Development Assessment requirements of State
Planning Policy 2014.
South East Queensland (SEQ) Regional Plan 2009 - 2031
The site is located within the Urban Footprint of the SEQ Regional Plan. The proposal is
consistent with the regional policies of the SEQ Regional Plan.
State Planning Regulatory Provisions
The following State Planning Regulatory Provisions apply to the application:
      SEQ Regional Plan Regulatory Provisions
The proposal is for an urban activity within the Urban Footprint and is consistent with the
SEQ Regional Plan Regulatory Provisions.
4.3. Statutory Instruments – Planning Scheme
The subject site is located in the Cooroy and Lake Macdonald locality and is zoned
Detached Housing. The proposed subdivision for detached housing is identified as
consistent within the zone and is required to follow a code assessable application process.
Condition 1 – Flooding
The applicant requests Condition 1 be deleted as a revised flood strategy has been provided
in accordance with the Condition.



                                                                                  Page 40 of 147

Section 41

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                    3 MARCH 2015


A Preliminary Approval was issued instead of a Development Permit because the applicant
provided an unconventional flood detention strategy that relied upon the use of vegetation or
“roughness” of the flood plain for flood detention storage and also proposed extensive re-
profiling of the western tributary. This method was considered unacceptable, given the
unconventionality, the risk to surrounding residents and to Council.
The applicant has provided a revised strategy that uses conventional storage and detention
methods without relying on vegetation ‘roughness’ of the flood plain or extensive re-profiling
of the western tributary. Some re-profiling is still proposed but it is within acceptable limits
with the use of geo-fabric and plantings. It is not agreed to delete the whole of Condition 1
but to change Condition 1 to ensure the development is carried out in accordance with the
revised Flood Report prepared by BSM. Therefore the upgrading of the Preliminary Approval
to a Development Permit is recommended to be supported.
Infrastructure Agreement for Park embellishments
The applicant requests the Infrastructure Agreement be executed and Condition 15
reworded to reflect the most recent playground layout plans and the plans indicated in the
IA.
Infrastructure Agreement
The Reconfiguring a Lot Code requires either a Park Contribution be paid or an active Park
is provided in accordance with the Priority Infrastructure Plan. Given there is no active park
(or planned) east of the railway, the applicant sought to provide an active park to offset the
Park Contributions. This request was supported and approved as part of the Preliminary
Approval issued by Council on 18 December 2014.
Council’s Park Project Officer provided an estimated cost of playground equipment as
proposed by the applicant. The proposed playground is determined to be generally
equivalent to the apportioned Park Contribution for the developments identified in the
Infrastructure Agreement being the subject application, REC13/0148, REC14/0008 and
REC14/0009. These developments subject of the Infrastructure Agreement are shown below
in Figure 2.




Figure 2 - Subdivisions subject of IA




                                                                                    Page 41 of 147

Section 42

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                      3 MARCH 2015


The cost of the playground is proposed to directly offset the apportioned Park Contribution of
the Infrastructure Charges or, alternatively a refund of paid Park Contributions or a
combination of both. It has been confirmed by the Director of Corporate Services that
amounts of up to $150,000 can be refunded in the December quarter of the following
financial year after the completion of works. Balance amounts of over $150,000 can be
refunded in the December quarter in the second financial year after completion of the works.
The majority (Stage A) of the Park embellishments will be provided prior to the sealing of the
plans and the basketball half court and rebound wall (Stage B) provided prior to sealing of
the plans of the last subdivision of the 4 applications identified in the IA. Stage A of the Park
embellishments include:
    Natural play activity mound including the following equipment:
      o Slide
      o Boulder steps
      o Scramble wall
      o Tyre steps
      o Rope walk
    Park signage, lighting and landscaping to the mound
    Raised meeting point
    Water supply and connection points
    Double swing
    Park shelter, settings and benches
Stage B will be provided prior to the sealing of the last plan of subdivision identified in the IA
and consist of:
    Basketball half court
    Rebound wall
At the time of the Preliminary Approval a draft Infrastructure Agreement was being reviewed
by Council’s solicitor. The Infrastructure Agreement has now been reviewed and signed by
the applicant and it is recommended that Council execute the Infrastructure Agreement. A
copy of the Infrastructure Agreement is provided as Attachment 2.
Condition 15
The applicant requests that Condition 15 be changed to reflect the most recent playground
plans which are also identified in the Infrastructure Agreement. It is recommended that
Condition 15 be amended to reflect the revised plans. Only minor changes to the plans have
occurred, such as the inclusion of an additional water connection point, staging of the works
and a location to be determined for the basketball half court and rebound wall.
5.    CONSULTATION
5.1. Referrals
The representations were forwarded to the following Council specialists:
    Engineering Officer
    Infrastructure Planning and Design
    Civil Operations
The flood Strategy was externally peered review by Hydrology & Water Management
Consulting Pty Ltd

6.    CONCLUSION
The applicant has provided a conventional flood detention strategy that meets the provisions
of Condition 1 and the Planning Scheme. The Infrastructure Agreement which secures the



                                                                                      Page 42 of 147

Section 43

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               3 MARCH 2015


Park embellishments has been checked by Council’s solicitor and signed by the applicant.
The Sustainable Planning Act 2009 permits the assessment manager to upgrade a
Preliminary Approval to a Development Permit as part of the Negotiated Decision process. In
this regard, it is recommended this Preliminary Approval is upgraded to a Development
Permit and the Infrastructure Agreement executed.

Departments/Sections Consulted:

   Community Services                      X   Planning & Infrastructure
   Disaster Management & Public Order          Building & Plumbing Services
   Waste & Environmental Health                DA Planning
   Community Facilities                        Strategic Land Use Planning
   Cultural Facilities                         Asset Design & Investigations
                                               Asset Planning
                                               Civil Operations
                                               Environment

   Executive Office                            Corporate Services
   Community Engagement                        Finance
   Customer Service                            ICT
   Executive Support                           Procurement & Fleet
   Governance                                  Property & Facilities
   Human Resources                             Revenue Services




                                                                                Page 43 of 147

Section 44

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015


                                                            Attachment 1




                                                   Page 44 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                3 MARCH 2015

                                                                                                                               Attachment 1

         i          a                                                                                                                  : sascucry anno Pivie
                    LNETYPE LEGEND                                                                                                      (3 STORMAATER GRATE,
                    ei enna                                                                                                             =
                    TITS Ss                                                                                                             Sic
          N         a                                     wom      | oF                     CORDWoop                                     <=               MAX WATTERSON
                    —— =                           Sy                  %                                      PRIVE                     =                   +ASSOCIATES
                    —? — see                           Se,              %                     es                                                           CONSULTING SURVEYORS
                           ie                             Ss              te                  m2                  he              -                             & PLANNERS
                    =                                                            iat          2                                cows}                      ae
                    —-=                                            DO       RRA       5     ES ieee                           ep                          rays
                    a                                              é                ae ae P|                                   1  Covel                   PO Box
                    — stenoonton                  99                 SH              zone \ 3    C    QO        a          Fy         19                  Fax. (07) 54425125
                    —      rarmay               RP881900             ‘e \       NG ——                Boba)   s              ~Emyy-~~ i                    Emall. [email protected]
                                                                  100.                 eee                                                     K
         DEVELOPMENT TO BE COMPLETED FOLLOWING                   eek UN, \           \ viene &    2   Oy                 1                    £          cient VALKEV PTY
            THE COMPLETION OF STAGES 5 & 6 AND                  .         y          eS     is    Ne
               REC13-0148 (Subject to approval)     Ye      RECIS 00058 a8 &6        Lae t)\      Sang        |       RPITS809               3                LTD.
                                                   (\*       <>            YY             STAGE S\.   AQ\   Sf               -              Oo
                                           |   TA           ‘Vs             \              14       NPAT                    PRS
                                              “                               eR          *4   ‘\   c     .                ~                             Project:
                                         |g       } ;    ghar Mf      orxmaway WS           NUS      ay ae ra                                            PLAN OF PROPOSED
                                         S69           a a                                     ee      Ne” poo PSE           )\                          RECONFIGURATION
                              neinnss             Wal    (       aed           WN            SE         WY ae      TS         Cy" uy                     OF LOT 5 ON SP266731
                                         55%      [)) 8        8.    Oos       \\\               is 1.2ha <= SP  _ fp §
                                     &           d    A      4     ee          an     BRIE Lo    B)\ sod cokate noe   85 6            Oo                 & PARTS OF LOT 137
                                   AD            /    ABA                        \\                 Sa aca             ee            J                   ON MCH978 & LOT 2
                                 YY             ik    | Oo [—,          4        \\        ;         w     NIB\ ong          / mor                       ON RP173883.
                  .            vf,          .   iy     Sf 24 mh                   \\                  e   Boxe  i O53 li                                 (STAGE 3).
                    i   33    a               rn “y ~~ Spo         Ig 8 B        BR.                   cea          ee    Ff      4                     PARISH: TEWANTIN
                              LA             Une     d | 4.23 659m?          IT     \                          —        SA
                35      eon? §                HH    4    Fs 29, | fame AL. Is      aa  Ue           Poy             Aw) Kyo                             COUNTY: MARCH
                    f 34°"   i                i    7)    ‘Gos ag J   ,   oe . ‘28. eo eS            ae {     Zi         * Re, 0 HS — 5                   LOCAL GOVT: NOOSA SHIRE COUNCIL
               taf    616m? Boi              ‘V/  PSTAGE 3                   Ray   a RNS            fe —— i                      nn                      LOCALITY: COOROY
              STAGE 4“,                i    i         “omar  NEW     ROAD         er SSS                 fe
              a | Sip                   Ws           AL 20       —            Z          SS)        LY a              Gi      —»
                  : 56 Sot 3H y              Ah §    fe 865m*          7 Pore   4           S\SS                  es                                    Scale: 1:1500 — s
              55 BR  2, ¢ ey.              r     2p      2.07 |     L         ‘           0    S   =       —- <-                                         Datum: AHD      5 rs
             650m? Pon “i                  } }      Is  19   x      S         e O42m*           Se       3 so         ant                                Origin; PM 178243
                  s   57                   ii  ye      660m? ¥                     ¥                       >         9                                     99": RL 108.138  .
              ge |, 831m §                 ( Y5.16W    td                   , ge                    6 Se                                                 Cont. Int: 0.5m 030 APs
               Sa                     hod |! Vs   a   A                     P         OMe            <So,                                                                      is
                o 6                       SR HL      S60 en* =|  18     4                 Sy              oO                                             NOTE:
                SO   emxPy           00 *       peed             990mg               Zope           naP                                                  This plan has been prepared for application
                                 y8P218739 3)   |            Pare =                 , CA       cre                                                       purposes only and may be subject to change.
                    7               %   -       |                  ere 7    og a          wr           Q100 INUNDATION LINE PLOTTED FROM STORMWATER      approtiate ony and subj! to nel survey.
                                 RESERVE OPEN SPACE |             G       »      Z,   “                                                                      ions and areas are
                                               /                          &                              DETENTION & FLOODING REPORT PREPARED BY
                      8                 tM                fe              v                                 BRISBANE STORMWATER MANAGEMENT
                      “Go 9         100      ty  _ PLACE                      &                         Scale 1:1500 - Lengths are in Metres
                                  SP218739     ~
                                 RESERVE OPEN SPACE 10 11,                   £         15   0                             |
                                                Se          12             yy
                                                       219650

                                                                                                                Page 44 of 147

Section 45

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 45 of 147

COWMON NANE             ZONE B] ZONE       \            EASTERN TREUIARY I |                  pron]                     }   5    f    ae  |                 Callaghan & Toth
                  GROUND COVERS / GRASSES                                                                         Ngo       |                            |        }        |        |     ‘fh             Civil, Environmental &
               [___Caleenioene dubia |     Soft bracken     -   [28 | 35 |                                                eS                                              |        |         |         )y) Hiydrautie Engineers
         [Dianella caeruis           | Common Flax tiy    | 28 | so | 50_|                                                          ~    ee                      |                 |                   we          Poo 298
           | Dedonea triquetra      |      ‘Hop bush       | ~~‘ ast                                       9                          CA                                  |        |                  yaya, sta Nats aH
               [__Gobnia espero     |    _Sonseage        | -   | 26 | 36 |                                                          Be = (4                     pf                         |             prone erste fr 514804
               [_____temenara Hysrtix |  Creek Mat Rush   | 28 | so     100_|                                             STAGE 5]    Kaba                                           ee                     rrectloporantothconat
           | tomenda tongifein        |  _Mat Rush        ‘| 25 | 50  | 100_|                                         \              ha Se                STAGE 5                  —I--                    Tau HID DERED
                                                                                                                    a)               Co                                                   N   | [omnes fac] on com 2"
_TTCSd                                                                                              ZONECl              [stace_5 | Rass                                                   N
                                                                                      PASSIVE                                         ba                                                         pervs
               |__Ninio caersieo     |    Native Gnger_—-‘[- [27 | #0 |              PARKLAND  \                         f,    5      Ba                  STAGE 5 I                              SURED EY
           | Baeknousie citrodara | Lemon Scented Myre    | 20 | 25 | 40 |                    tom Sy owe ToP                           eA   A                                                    MAX WATTERSION & ASSOCIATES
           | Becerousio mytifoia |        Cinnamon myrtle | -   | 26 | 40 _|                        ‘                      "am Fou an TORK   VS                                  RP173883        PHONE 54 426 121
          | Breynia obiongitoia      |    Native Coffee   | -   | 26 | 40 _|                                                           a     A
            | Caticorpe pendunculata |    Notive tontona  | 20 | 28   | 40 _|                                             \             oo    BB                                               | (woe
               |____Cordyine rubro   |   Red trited polm iy | 20 | 28 | 40 _|                                                stace 5 | aut            [Stace 5                                || PROPOSED 31 LOT SUBDMSION
                          7                    ‘      -                                                >                                 Oba     <                                          &
               |__Homalanthus nutens |    Bleeding Heort  ‘| -  | 26 | 40 _|              Greater setback                           —    Len         |                                 ei,     J] 55 LAKE MacDONALD DRIVE
               |__Hibiscus neterephylus |  wid Roseta     | -   | 26 | 40 _|          ~~                                                   ES CAG                                     ff         COOROY
           | Nacaranga tanorius      |    Sucks Heart ———‘[ ta   | 28 | 40 |         acTIMifrom top of bank.                  So           aA          10                             ae,
                                                                                                    sae                        1m FROM BANK TOPRGS, = OPS                               uy     +
               [__ Meioleuca sive     [|  SSSCSC~iYOC*dBSC*YC               |       PARKLA'See Conditions                         "         ey    WA                 n         |             le
      [tora                                                      261400]             685MREC14/0008                                         Ya                 Snore                         TS  (cian
                a                                                                                                                             AD              [STAGE 6]                   ne fe
                     a                                                                      — —                \                             me                                             ><) | VALKEV PTY LTD
                                                                                       —                      \               =        ,     i         0                                      Ee
                [____Aphitonia excelss |    Red ash       <i   —~i| ——SidY  |                         so                        a)           ie        YY                     +}           (ey
                                                                                                          o&%  \          ZONE 8B |          ROY        Mag.                        —__/ $A
            | Brochyeniton discotour | _Kurraiong        «|     iY SSS*| S|                                “4, Meo                          By          sf                               i
           | Cotistemon Salignus     | White bottie ousn   | —~(t    | 40                                 Xe                               a             BS         12                       ae
               [__Cerybia gummitera |      Pink Sloodwoos | 15   | 40 | 40 _|                                    \            GS               4        by                                 \ 9   Revecer
               |[_Cryptocarye cbovate | Penperberry Tree  [15 | 40    | 40 |                       ‘            ee         1h         _       "presi            [STAGE 6]                   \>] | MANAGEMENT. PLAN — EASTERN
                                                                                                                                               4p>      x                    j             &\           ATION & REHABILTATION
               |_Groptocorya tripinenis | Three-veined Crypocna | |   «| 40_—|                    _                                     3           $e                          STAGE 2 | © |    LIRIBUTARY STAGE 5 & 6
               [__Eloccorpus grandis |     Ove Quandong   |     |     | 40 _|                          \          \\                                           3                OMPLETED}
            | Eucoyptus gronais      |    Flooded Gum     |     |     | #0 _|                            ‘       ‘                                                                         —L
                                                                                          ~                          §                     gw [Ence 6)                            .
             [Eucalyptus resinifera  | ~——sRed Mohogony ———=«'15—=«| #0—«| =|                                .                                             STAGE 6                           | |] LOT 136 on MCH978
               [____Fieus coronata   | Creek Sandpiper Fig |__| 40    | 40 _|                      5                                        \                                            wend
           | Fieus macrepnyia        |   Moreton Bay fig  [18 | 40    | 40 _|              STAGE 3              we    \                                             =        _        &25]]|     Parish of TEWANTIN
           | Flindersio senottiana |     __Bumpy Asn      |     |     +t _40_|             (FUTURE)               Sf                          a                                “mic           || County of MARCH
           | Giechidion ferainanai   |    Cheese vee      |     +(|   +t -40_|                                      "                 CS    EEE             REFER TO 125-08           “<7     /| | SUNSHINE COAST COUNCIL
          | Gmeiina ieichnarativ     |     White beech    <i   —*(| ——*«Y|— #0                                                            EET         T7100 [FoR 80 BASN oeias           *"/ |) locality of LAKE MacDONALD
                [__Grevites robusta   [|  _Siky Oe        ‘(15 |      | #0 _|                      PPARON_ MAPPING DOWSTRENN                          ark                                  (i
               [_vegera pseudorus |         Foombok      —*| ——+(| 0 | 40 |                         OF THIS. POINT, STREAM. BANK         7                                                 vA
               |_Leehestemon confertus |    Srushtox      | ——*«(t    +t 40                                                                   —[eounett mPaRin OVERLAY]
                                                                                                    USED FOR START OF BUFFER =           oo       ‘SOUTHERN EXTENT OF                     Lin,
           | neisteuce Inerifois | Facieoves Popersax     [18 | 40 |     «0_|                                                                SS                                 tN
            | Welcope elleryona     |      Pink Evo     Sd      |    Yn                                                                         a        “Ws                  OF CREEK ExcH Ste) ~~] [Soe
            | Ropeneo veriabiis     |    _Nuttenwooa     «||          iY                                                                       “ZONE C                       -          -                            ne ,
               |___Stereulia quedrfga [Peanut wee         (|   —*(| ——*iY|~ #0                                                g                                                              |]    sce   us seme cna sxe sxc
                                                                                                                                                           ONE  A                           sa] | My BEM wee
              | —“Syncorpio glomutifers |  Turpentine     [15 | #0 | #0 _|               SS                                     Ra.                      ZONE AT                                     (3) Ge tay diosa Pore
               [_Syzyium oustraie | _Srush chery         «| ——*dt aoa                                         3 WE CLEARER         -                           Pr
            | Waternausia toribunda |    Weeping Liy Ply  [15 | 40 | 40 _|                                   vo etND ats  OR.”        C                      p                     )            (esos S™*~*Y
               Lo        tora                               t50  520    1000                                         r       Bp,                           ;                                   Fee]_revson details ——SSSSSC«de
                                                                                                            24             ee         A                                         .               JA | ISSUED FOR APPROVAL | 10/14)
                                                                                                        on,              Ree   FL       DS                                        Sm WIDE ON BOTH pp
                                                                                   ?                   ¢      4               Se                                                  BANKS FROM CENTRE} }Po[
                 EGEND:                                                                                :       ’             BX     J       ~     ve      .                                      Pe
                   ‘ND:                                                                                ,       5                  ne         oP    ay               ’             UNE OF CREEK  —                       —
                            ZONE A (NEL PUNTING = 926m2                                                Seg            a        \       |        80 BSN”                                                                os
                (EI)        nr Puanmnc reoureo ror 30% OF AREA TO ACHEVE 1 PLANT/1.5m                 23            SA          ao,           Cad             °                                 L
                            REMOVE WEEDS AS REQUIRED TO SECTION 5 OF PLAN 1225-904                              4  >  \       2 ge \ :         O,       \
                                                                                                         -&        STAGE 1      oS             |            a
                            ZONE B = INFILL PLANTING ~ 2163m2                                           -                          fore                   @                                      .       —  ~
                                                                                                      -     \                      t   SU                                                        XA\WOBS\CT Projects in progress\1225 30 lots
                (EI)        vey ourrer tea Punt 70% OF aneas To                                                   OMPLETED)        &   Vga      wr       »
                            ACHIEVE PLANT DENSITY OF 1 PLANT / 1.5m2.                         RAS             \   =      =         hat
                                                                                     Begin 28 ce reas      heaX§    PS, \          ~  ow”                                                            FOR APPROVAL
                            REMOVE WEEDS AS REQUIRED.                                   OPE U2         ee        é     oy,        Pa
                [II]        zone c - reveceranion pLannng - 2752m2                   ES SR Ee Pom          fy    RA       oe       wd
                            RIPARIAN BUFFER AREA PLANT AREA TO ACHIEVE                      BR eer    SH   SF    NRE
                            PLANT DENSITY OF 1 / 1.5m2, CURRENTLY                   —     ~     Se    PO        ah    te Awe                                                                          Sheet 30 of 35 sheets
                            RIPARIAN AREA FROM TOP OF BANK UMITED TO                  7           he         GPO RE                                                                                    Growing number
                            GRASS, NATIVE VEGETANON PRESENT ON BANKS OF                1872                   £ a =   oa
                            WATERWAY, SPRAY GRASS,                                    /      ,                  al x                                                                                  1225-89
                =  == w= m= COUNCIL RIPARIAN BUFFER OVERLAY EXTENTS                             |               ost                                                                                                A

Section 46

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015


                                                                    Attachment 2




                                                   Page 46 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                   3 MARCH 2015
                                                                                                    Attachment 2
                                                                     q         inlay ct           Legend
     ee                                                                Jee.                          oe
      x i    P.   3 }                                                  sh       f                 |  ACTIVITY MOUND
               Ss               (1.4)   >                            é pf  :                      5  PARK TABLE & SEATING
             Bi)             O, gigi                                    a                         oer een
      oe           ,      ae     (ee          OOO          LEE:                                      _—
                      (gers       CAL                    Leys                                    FR mene
        GON           EE OO MARE
       fv PF lag. “ge ©   me         LN Tid        SZ “ ) Yea! oe ei 5 5A @   mf i.              L “Ns
         \\ ;   Hea)   TL fens     (ai    C FHT @.N i Z 4D << LZo «     Ys G@)    wa                RUBBER SURFACE
          Yeon        Oe.              YASS AOA® \V'                             S               a
     OGY    SA         <A             46   RSE                   Goan )                2
    (            » SEBEL?)                                  @ ©
     )           WEN             ce te         yy Oy ano c                                       Penn
     EMO             Lent AI                                                                     wine
     \ 7  : wo       s}  p y Le? Zp TA )    eee) Gs   |  Fey < Z                                  a LOW LEVEL
       3           bo    Oe EO sc. |                                                   ye        oi
            me    \e\    “SEI                   SEE ea
/3      ea     es pri      Le (2) VOLS         ‘Oe US [SEF                                       a5] souers
             ee       Spe pe                               LD         Pe             ety)           x.
                  MO  a                                    eg     “aes a. 73 ey                  Bed LIGHT
  :              ERINDALE PARK SIGN                                    I Z     se
  é                                                                    IX       /
  :                                  a
    HE      THE eon          d)      —        .     .                                              @)
    bd      LS                     ErindalePark xen                   |
    ff       PLAY ENVIRONMENT CONSULTING | | Vauxeyeryit0      ERNOALE Park, coonoy | | Mastienatueshanaeh
    1 ANG i) ; 8/269 Abbotsford Road, Bowen Hills, Qld 4008 Australia con ao DEVELOPMENT | | Bottle ene mu,
    Weld         one! 7) XEN 65.010620927                      CONCEPT PLAN     Si nak poate   [rae spn@an |
                                                                    Page 46 of 147

Section 47

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 47 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                  3 MARCH 2015

    Legend                                                                                       \              2                                  |           |
                                                             Sm ae  ee                                                                             |           /
    !    ACTIVITY MOUND                       &               PY bea                                              \                                            |
    2    RAISED MEETING POINT                 lee      ,     ta                                     x
    3    DOUBLE SWINGS                        a                o                                                           ce
    4    PARK SHELTER                            ee  ,                                                  a                        —
    5    PARK TABLE & SEATING                                     ;                                    Ra    aes,
    6    PARK BENCH SEATS                        >      =                      ’                                          \\                      \
    7    SIGNAGE, LANDSCAPE                   ae                   ;                                            ;                                 |           |
         & PATHWAY                            Pet le parce     yl                                            ts                                   |
                                                                                                            oy  4                                  \           \
    Sy ae                                                                                                    No       RSSNe                        |           \
                                                                                                                    AD                                          \
      jae                                                                                                         =                                             |
      om                                                                |                                               —                                        |
    Jammer             gece a                                         Go                                                                                           |
                      yam       Gea BR                             SON                 LEED                                                                         \
                                                                 LEN Cee OOO, LAL                                                                                   \
    Ed onesie                        2                      = | Se          at) KG Bones                                                                ;            \
                                                         gts       td AP   NS ff fo
   IO TREE                         aU    :              (i Co ee 3 Gz Wie CS Sey                                      — a                  eae
                            = Ad    £2                 % Oe ew O Posia7                     Po                               5      <i                    \
    ama                   a                 SF        IT            RUB AY              Se
    (1, SHRUBS           Re        .                  le!     O Or OS         ry TEIN OXFQXe
      <                                                       2  ey gy taxa cor eh     se
    re LOW LEVEL                                       ay,       Veo            bo )7 Oy
    iF] rns                                             @\      \ ee Ne oes)                                                  os            .                \
        DECKS &                                      £ se        BR            Z ST eZ                                      fT. wae ¥ yu
    (J PLATFORMS                                             j 62     —* NOON a) >                                          4    i,        _   i ‘S
                                                             ONO LE           EEE ee                                             =k |
        BOULDERS           1500                               Ce —        S&S  SON           aS
                                                                 J                              Chee                                                   N\N
                       ——                                                                       7 oe
        TYRE STEPS      a              TIMBER FRAME -                                          EF                                                        x
                                       DRESSED CYPRESS                                                             ty
        ACCESS     8     eee a |       POSTS & RAILS                                                          ©,   ze                                           MG
    el             Jal                                                                                            —          oe                                   %
                                        ERINDALE PARK SIGN                                                         g   y
                   3] J          JL
        LIGHT          |
                                aT
                     | i        I   -—Foonnes                                               LL
                                   |
                     Casal      hacal                                                            a
                                                                                                    a ~~
                                                                                                            Pat
                                            d)          =          a               4                                 oy               y                        C
                                                                                                                 yy                                              Sf
                                          !        ErindalePark    soxc;s0
      4 wer | PLAY ENVIRONMENT CONSULTING | | vatkev pty Ltp                                ERINDALE PARK, COOROY | | 2”9,010,be used ot reproduced wholy or
        fm,                                                        eect                      ae                     These designs and plans are copyright and | | ™@Wing number 4 4/005-S01
      / Nite Fy}     81269 Abbotsford Road, Bowen Hills, Qld 4006 Australia Mia             nee                      Bo hot sao tom the dawg.
      Soll my          Phone: (07) 3252 2262 Fax: (07) 3252 0260                            CONCEPT PLAN             Deregard superseded sues.
       Rel ae                    ABN 55 010 820 327                                                                  Suavey etal ok previes   scale 4:500 @A3
        Lae                                                                                                                                         .
                                                                                                   Page 47 of 147

Section 48

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA          3 MARCH 2015




                                                   Attachment 3




                                                           Page 48 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA               3 MARCH 2015

                                                         Attachment 3

                                NOOSA COUNCIL

                                VALKEV PTY LTD

              INFRASTRUCTURE DEED IN RESPECT OF PROVISION OF PARK AND
            EMBELLISHMENT INFRASTRUCTURE FOR: RECONFIGURATION OF A LOT

          DEVELOPMENT PERMIT/S: REC13/0146, REC14/0008, REC14/0009, REC13/0148

                                     Page 1 of 20

                                                                Page 48 of 147

Section 49

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 49 of 147

U
                                                                                                                                                                                 rm
                                                                                                                                                                                 >
                                                                                                                                                                                 =a
                                                                                                                                                                                 <
                                                                                                                                                                                 za
                                                                                                                                                                                 ©
                                                                                                                                                                                 0
                                                                                                                                                                                 a
                               Sass SsLlLSHPHRHANNNAABAAAHAAAGA9HOAAAA                                         QF nPRWWONNN SESS BSB                                             @
                               eeseeerePnis          or ao     po      CMAN        DA RWD OB      ab wD        =    =     =    ie      Ounb WH                                   >
                               Rwh oa                                                                                                                                            =
                               TUVUONADADAADFYFAZFAVGIAAPFPAAVGVOSOOCASSZSSZMNPSPSHFPUVUSFBZBAOVVZSOZZ                                                                           ¥
                               SseQOQmMmMoameasw®oszpaem2ZoouLhe FLXLoFORBZFRPOROA>REVUDIACGCFA SAFO
                               38S 2 a8 8 ORS eT CSSA GOST RG SR ARS BI VASASISZSER                                                                                              a
                               sok s eset esse ETRE sci ea Rees                                               ask          ssi aer sade g                                        9
                                  .    a     3350      9 ob 9 G           Ts>4236         a    otra SZ       ofS       moc        ot              307                            D
                               oo 8       ~~         a                 a ow       <    ®a na                 :      °       --              =a      oO
                                             cc =                 ocHoes          oO      o + >      Us      : oo      :       =:      a    a a> oO
                               cogs:         55      oo?       35       fesa2@raQgae                 oom:      £€ DW   >  925327          a.      oom
                               e280          Be OSS        soe mea                  OGSSZSLES GER                         SAA2CFOB8:           SERA                              Q
                               SSS           se ee SEZ OSssss                       246:       oF F9E SIF                 FBEFQZS:                FBS                            Oo
                               poor  Dee             ® op ®@ gp OC      az:  ®WA:    §    oO:  m     S    =e:5 Cc      :       8fCp 3:         :  ™:i  O                         =
                               if    i a@i   gxzaAazeSmMsSs    Pp: 6: s:                     i: WO72GF: G2 HQ:            FOB:         Roi     ii:
                               fof:       :    °     =o; m           uv   fof.         : od:         :    QD:     a    :       Oo:  AS i:      3: :
                               PPP     ei    BE9FLomeSs eS                   £52     Fig:      E85     FF Smo:            FSH i mo:          fF                                  =
                               Pod     Bi    BSZ2S     RFC,       oA ds:     tf iti  $i   F:   OE:     Sei aaosd:        FZ26:      oF:     i: iii:                              mr)
                               iii     *?    Be@o:     F%e:       S39:       5:2:    Bi   Sims:        FSi S03:            Mai      moi     i  iii:                               |
                               i  iob  it    e@em:     Pi    Bi   ezri       i tii:       &i   of:     SFr gzg i:           aS:     Moi     i  i  i i:
                               Poi obo opoieaa       bobo:     :  @    :  bobo bod   Gop  @          : >  i  ie     Prop    rs:     geiii         i i:                           m
                               obo obo fo:     oti:       :  OF    RPA:      i i:iii      si:  aS:     i  i:ies ari       iti  gi   f     PoP Po bo io:
                               ii    bit     FST:      fi    2:   B22:    iit        i:   @;   BRFi    ii: SD          ii:     Bi   ieaiiiiiioea                                 m
                    u          Pi ob   bop   ge § Mi   ti    wi   wi   ii:     ii    bb   ii   Mii     bo bi B@:i      i  i i  @i   i  Fi   ii    iiiée™
                    a          Poi obo bop   @aQMii       i: Bi:     io ii   i bo iob  i  i  fopoboio i   big Gio:        i boii    io:   bopioiiis                              =
                    oO         rr                  GM: :  : pei:    ft ft ob fb bo f bo ob ob bob bb   bt mo me        tb lb                                                     mT
                               fob oto fo too        poof      f  fo ¢ ¢  $  $ $f £ $$ $  F  2 £  £  t f  fos     ™:   :  $ ¢: ¢$ $ ¢: $$ ¢: f$ ¢ ¢ ff t  _
                    N          boot of ott     <= W:   :  :  Ms: :   3 fF tf bo ob bf ob ot boob blll lc lt         Poot of bb      Dc    Et
                    °          Por obo opo:ros    Gio:    io:  ?  Pb Po Po:iof Pop   Poi  por  borpopo ip bo itOO:io:     i io iio obo boro obo boiotoiom                        m
                    al         Por of of  ft wm B    Por ob ob bo ob bf Poffo pop of obo bo bobo ob  to opopo:p@ Zio:     ft : ot to boi  fr to i foi:    gw
                    XN         bib     ii   opBei iid:            io:  bid op     iio bo boboi    bi:     bipg Pi      tii     bb iii     pi:     iipig                           a4
                               PPP?          SS SAi    iit     ibi     i:    EEE     EE:  EPi     EL   EE? Si;         ELPiEiEPi:ipiiia                                          Z
                               Pipi?         @R@iitpiiE:iibEELLEiidi:a                               EE:     PSiiEtiEPEaEPbiaEd                   ia                             Q
                               Pobof   ft ft @ Q@yaio:    io to bobo obo pot bo obop fob  bobo obo bo oboporo:    2 $  $  $ $  ¢  fb Pot  :ororpriPrii:
                               Pio bo io:    @$mi      fi:     bdo:    boii    bob   boi  bio:    bi:     bp Sio:      bid     b  bib     bio:    bi                             >
                               bos ot  §  $  @ Ai    ft f £  so fb to to ft ¢ fo: fo F Fo ft tot  to ¢ fo tot Bs    &  Ft F fs    fo & F  ft Ft   Fes:                           q@
                               Sr                                                                               ©
                               iioii      i  Foi:      i  iid:    bi:     iid     bid     bib  i  iii     bi@:i     i  iii     iii:       bi   iii:                              m
                               bof ob  & ft    asi: i:    ::   :  ¢  $: € §  ¢ $  $  $ $  £$ $ «$ &  $ «$ *£PtEgs   &  ft &  Es $s t   fis ¢ fi $s fits os
                               i of ob bob   @ @i    bt   EE   io:   EE   EP bo boE  EE   bobo obo oboi obit Bi     bo pobo bob obo oP do obopo bo pi                            =
                               23h                                                                                                                                                Oo
                               iioboiobo dod      bobo bo bob  bo bobo i  boa  bo bobop   bib  bo bobob   boi@ i    bib     i  iii     bid:       id:                            >
                               bobo:   Popo bob   bo bob oP  Eo bobo boboP   Po bob  bop  bo:  bobo bobo bob @i     boiobi     boi  iodo boi   boii:
                               Pod ob ob  bod obo op ob ob obo bop bop poi   io bob  bob  bo oboib EE  Pi    :Poi   bi    io bi   io:  i  bi   pid
                               bobo Gobo dodo dod    bobo bob ob obo op ob pop bobo ob bop ob  Po boP  Pioig i      boii    io io boi:    bi   boi:
                               Poof ob cb a mt
                               iio obo:   bob ob  PE   Eo:   Eb i pod ob obob  EP    iE   Ed   i  i  io:  bo: Si    bo bob:    EP Eid:    i i  iit;
                               ss    3: $$ 8 : 38 ¢: $ &  $  &$ $ $  $ $  $8 § $$ $  $ &  $ $$ $  $  $ $§$ ¢ $$ SB Sst ¢ &$ §$ §$ § & §$ §$ £ §$ § & 8 8
                               iio bo boi    bi:     i i  i  bb   bo: oid    boi  bob  boi   i i  i  bobbi @iob        i  boboi   di   i  bib     bi
                                        a          a    a
                               Poioioio io i   i  bo bod  boi  do io:  i  boi od  fob  d  bob  i  bid     bi @ bi      ibd     i  bi   id:     pid
                               Poi oi  bobo bob   bof  fo:   io poi op bob   bE bob:   Ei:     iid     bb    i Qi:     :  iii     bi   id   i:   ita;
                                obo obo bobo obo Pbopobo bo bor bo bobo obo borbobo Po borobo obo bobo io obo boi Bio: bobo bobo oiob  boi obo bobo:
  a)                           bobo obo bob odo bob ob bob   Pod obo ob EB bob ob Eo bob oPoE  EP obo:Po EP :P igi  i  i  i ii    ii:     bp   bid:                              wo
  2                            bobo ob Po oPopopor   tof  Eobopo topo bopop ot    bo obororo obo borobo boii @ io boioiroio bi      bot   t fboborpoie: 3                        =
ie)                            Popo ob Gobo ob Popo bo bio:    bo bod  bobo: ob   Eb io:  bo doi  boi  dob   E@ i   bb    id   bb   i  bob:    dob  EG
  ©                            iio; oi    bob ob  PE   boi:    dodo}   bo bob  EP    i EE:     i  dod  bo: ob     bf EE:    EE    Ei   iid     iii;                              >
  AS                           SS                                                                                 io: of  ¢ $  fo: obo otoritPbt  ir:                            e)
  ©                            NS>S235353555000TC OC OFC OOD DH ODKDORARMRMDM                                     BDDAMANNNNNOUAAAA                                               QO
  °                                                                                                                                                                              <
  >                                                                                                                                                                              NO
  =                                                                                                                                                                               So
 rs                                                                                                                                                                              —
  N                                                                                                                                                                              o

Section 50

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 50 of 147

”            ao                                                                              .
=
z            aiid                                                                            5
N
O            iid)                                                                            =
©              hull)                                                                         5
 oO          a                                                                               °
Qa                TEE
<               nn)
2                              =
=             oe
oc              TEE            or
             aaa
ow                   ul                                                                      ‘o
<x               tH |                                                                        ©
Lu                             i
©                              i
9            cee    He                                                                       o
x                              !
<             eee     Tr                                                                     &
e                              1
O                              i
                               i
<                              i
E                              i
uu                             i
Ww                             i
Ww                             !
                               '
EF                             i
=                              i
=                              i
oO                             i
                               1
=                Ht                                                                 oO
Oo                        il                                                        N
—            NWA                                                                    6
                                                                                    om
Ww                       AT                                                         oO
                                                                                    D
=                                                                                   a
E            ¢, 3
=
ec                   ua
Oo
za              ves    ee
é                  fre    eed
                 vee    Pe   a 3
<                   rere     Hi
Qo.                     22355
                       nant:
                           =a
                             555
                             aa 3
                             a @
                             as
                             S55
                              2%

Section 51

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 51 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                   3 MARCH 2015

                THIS DEED is made on the date stated in item 1.
                BETWEEN         the Council
                AND             the Applicant

                RECITALS

                A      The Applicant is Valkev Pty Ltd.
                B      The Applicant is the Owner of Lot 5 on SP266731 and Lot 8 on SP266743.
                Cc     The Applicant has lodged the Development Applications in relation to the
                       Subject Site referred to in Item 6.
                D      The parties have agreed that provision of park and embellishment infrastructure
                       is to be completed in accordance with the Special Conditions in Item 8 as
                       specified in Schedule 2.

                IT IS AGREED

                1      INTERPRETATION

                1.1    Nature of Deed

                       This deed may be referred to in accordance with Clause 2.
                1.2 | Commencement
                       This deed commences on the Commencement Date.

                1.3    Interpretation
                       (a)     In this deed, unless a contrary intention appears, reference to:
                              (i)     a clause is to a clause in this deed; and
                              (ii)    the singular includes the plural and vice versa; and
                              (iii)   any gender includes all other genders; and
                              (iv)    a person includes a firm, a corporation, an association and a
                                      body, whether incorporated or not and a government or statutory
                                      body or authority; and
                               (v)    legislation (including subordinate legislation) includes:
                                      (A) statutory instruments under the legislation; and
                                      (B) consolidations, amendments, re-enactments or
                                          replacements of the legislation; and
                              (vi)    writing includes any mode of representing or reproducing words
                                      in tangible and permanently visible form and includes facsimile
                                      transmission; and

                                                        4 of 20

                                                                                                   Page 51 of 147

Section 52

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 52 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                    3 MARCH 2015

                               (vii)  this or any other deed includes the deed as varied or replaced
                                      and is not affected by any change in the identity of the parties;
                                      and

                               (viii) a day is to a Calendar Day.
                        (b)    The   clause  headings   appearing   in this  deed   are  inserted  for
                               convenience of reference and do not affect the construction of the deed.
                        (c)    If any words are italicised or otherwise printed differently, this has been
                               done for convenience only and does not affect the construction of this
                               deed.
                        (d)    Whenever more persons than one constitute a party all the covenants,
                               deeds, conditions, restrictions and provisos on the part of that party
                               contained or implied in this deed bind those persons jointly and each of
                               them severally.
                        (e)    This deed is in all respects to be interpreted in accordance with the laws
                               of  the  State  of  Queensland,   and   the  parties  irrevocably  and
                               unconditionally submit to the non-exclusive jurisdiction of the courts of
                               that state and any courts which have jurisdiction to hear appeals from
                               them, and waive any right to object to proceedings being brought in
                               those courts.
                       (f)     Nothing contained in this deed affects, prejudices or derogates from the
                               requirements of any statute or from the rights, powers and authorities of
                               the Council under the provision of any statute or under any declared
                               policy of the Council.
                        (g)    An inclusive definition, or an example or particularization of a provision,
                               does not limit but may extend that definition or provision.
                        (h)    Where a word or expression is defined, other parts of speech and
                               grammatical forms of that word or expression have a corresponding
                               definition.
                       (i)     All schedules to this deed form part of this deed and a reference to an
                               item is a reference to an item in Schedule 1.
                       (j)     Terms used in the Special Conditions which are not otherwise defined
                               in Clause 1.4 (Definitions) shall have the meanings assigned to them in
                               the Council's Planning Scheme.
                1.4     Definitions

                        In this deed:

                        “Act” means the Sustainable Planning Act 2009 (the “SPA’).
                        “Appeal” refers to an appeal made under Chapter 7 of the Act..
                        “Applicant” means the person described in and having its address at the place
                       described in item 4 and includes:
                        (a)    successors and permitted assigns in the case of a corporation,
                               association or other body whether incorporated or not; and
                       (b)     executors, administrators and permitted assigns in the case of a natural
                               person.

                                                        5 of 20

                                                                                                    Page 52 of 147

Section 53

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 53 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                  3 MARCH 2015

                       “Calendar Day” means the period from one midnight to the following one.
                       “Chief Executive Officer’ means the Chief Executive Officer of the Council
                       and includes the person (if any) for the time being acting as Chief Executive
                       Officer.

                       “Commencement Date” means the date when this deed commences being the
                       date when the last party executes this deed.
                       “Council”  means the     Local Government described in      Item  3 and _ its
                       predecessors, successors, transferees and assigns.
                       “Development” has the meaning given in the Act.
                       “Development Application” has the meaning given in the Act and refers to the
                       Development Applications in Item 6
                       “Development Permit” has the meaning given in the Act and refers to the
                       Development Permits in Item 7.
                       “Force Majeure” means an event:
                       (a)    being a decree of the Commonwealth Government or the state
                              Government, an act of God, industrial disturbance, act of public enemy,
                              war, international blockade, public riot, lightning, flood, earthquake, fire,
                              storm or other event whether of a kind herein specified or otherwise;
                              and
                       (b)    which is not within the control of the party claiming Force Majeure; and
                       (c)    which could not have been prevented by the exercise by that person of
                              a standard of foresight, care and diligence consistent with that of a
                              prudent and competent person under the circumstances.
                       “Infrastructure Charges Notice” means the infrastructure charges notice/s
                       issued in respect of the Development Permits.
                       ‘infrastructure Contribution” means:
                       (a)    a monetary contribution for infrastructure; or
                       (b)    a land and/or works contribution that is infrastructure.
                       “Local Government’ has the meaning given in the Local Government Act
                       2009.
                       “Local Government Area” has the meaning given in the Local Government Act
                       2009.

                       “Lot” has the meaning given in the Act.
                       “Notice” means any certificate, demand or notice to be made, given or served
                       by a party under this deed.
                       “Owner’ has the meaning given in the Act.
                       “Park Embellishment Infrastructure” means the works to be provided as
                       specified in Schedule 2

                                                       6 of 20

                                                                                                  Page 53 of 147

Section 54

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 54 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                   3 MARCH 2015

                       “Planning Scheme” means the planning scheme of the Council applicable for
                       the subject site.
                       “Public Office” has the meaning given in the Local Government Act 2009.
                       “Purchaser” means the purchaser of the Subject Site from the Owner.
                       “Relevant Period” has the meaning given in the Act.
                       “Sell”  includes transfer,  dispose  of and   alienate and   “Sale”  has the
                       corresponding meaning.
                       “Special Conditions” means the conditions specified in Item 8 with which the
                       Owner and Applicant must comply.
                       “Subject Site” means the land described in Item 5 and includes:
                       (a)     any interest or estate in, on, over or under the land; and
                       (b)     the airspace above the surface of the land and any estate or interest in
                               the land; and
                       (c)     the subsoil of the land and any estate or interest in the subsoil; and
                       (d)     any part or parts of the land; and
                       (e)     any estate or interest created in respect of any of the above matters
                       “Use” has the meaning given in the Act.
                1.5    Other Expressions
                       If a term is not defined in this Deed it shall unless the context otherwise
                       requires, have the meaning given to it by:
                       (a)      the Act; or
                       (b)      the Macquarie Dictionary in the absence of a definition in the Act.
                1.6 — Rights and Obligations Council
                       Where rights or obligations are in respect to contributions or works those rights
                       shall be rights in favour of Council and those obligations shall be obligations to
                       Council.

                2      INFRASTRUCTURE DEED
                2.1    Application of Act
                       This Deed is intended to constitute an infrastructure agreement under the Act.
                2.2    Deed to bind successors in title

                       The Applicant as Owner consents to the obligations of the Applicant under this
                       deed being attached to the Subject Site and binding on the Applicant and the
                       Applicant's successors in title in accordance with Section 674 (When
                       infrastructure agreements bind successors in title) of the Act.

                                                        7 of 20

                                                                                                    Page 54 of 147

Section 55

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 55 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                   3 MARCH 2015

                3      APPLICANT AS OWNER

                3.1    Warranty of Ownership
                       The Applicant warrants that, at the time of signing this deed, it has entered into
                       or will enter into and complete a contract to purchase Lot 135 MCH 978 at
                       Pearsons Road, Cooroy.
                       The Applicant warrants that, at the time of signing this deed, it is the owner of
                       Lot 5 SP 266731 at 61 Lake Macdonald Drive, Cooroy and Lot 8 SP 266743 at
                       1 Wilgee Court, Cooroy.

                4      APPEAL
                4.1    Filing of a Notice of Appeal
                       The Applicant has not and does not intend to file a Notice or Notices of Appeal
                       in respect of the Development Application/s and wholly indemnifies the Council
                       in respect its costs arising out of any appeal made contrary to this clause.
                5      INFRASTRUCTURE CONTRIBUTION
                5.1    Infrastructure Agreement overrides Development Permit and Infrastructure
                       Charges Notice
                       This deed applies to the extent of any inconsistency with the Development
                       Permit/s or Infrastructure Charges Notice/s.
                5.2    Indemnity for Adjustment
                       The Applicant wholly indemnifies the Council in respect of any adjustment to
                       the amount payable under an Infrastructure Charges Notice resulting from a
                       decision on a conversation application to convert non trunk infrastructure
                       relating to the Development Permit/s to trunk infrastructure.
                5.3    Infrastructure Contribution
                       The Applicant   is required to pay to the Council the amounts    stated in the
                       Infrastructure Charges Notice/s (the infrastructure charges) triggered by the
                       Development Permit/s and levied on the basis of the Noosa Shire Council
                       Adopted Infrastructure Charges Resolution current at the time of issuing the
                       Development Permit/s; and
                       The Applicant is required to transfer the land shown as “PARK” in Development
                       Permit REC 13/0146 to the Crown without cost to the Council and to carry out
                       the  Park   Embellishment   Infrastructure in accordance with    the Special
                       Conditions in Schedule 2.
                5.4    Time for Payment
                       The infrastructure charges are payable in accordance with the infrastructure
                       charge notice/s issued relating to the development permit/s.
                5.5    Offset for Works Contribution

                       Subject to the provisions of this agreement and as specified in Schedule 2 the
                       dedication of land for park and the completion of the Park Embellishment

                                                        8 of 20

                                                                                                   Page 55 of 147

Section 56

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 56 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                   3 MARCH 2015

                       Infrastructure will wholly offset the infrastructure charge/s amount/s that is
                       apportioned to the Public Parks and Land for Community Facilities network
                       component of the Infrastructure Charge Notice/s.
                6      GOODS AND SERVICES TAX
               6.1     Interpretation
                       In this clause:
                       (a)      expressions which are not defined but which have a defined meaning
                                in GST Law have the same meaning as in the GST Law.
                       (b)      “GST Law’ has the meaning given to that expression in A New Tax
                                System (Goods and Services Tax) Act 1999.
                       (c)      “GST Amount” means the amount referred to in Clause 6.3 (Payment
                                of GST).
                6.2    Consideration GST exclusive

                       Unless otherwise expressly stated, all prices or other sums payable or
                       consideration to be provided under this Deed are exclusive of GST.
                6.3    Payment of GST
                       If GST is payable by a supplier on any supply made under this Deed, the
                       recipient will pay to the supplier an amount equal to the GST payable on the
                       supply.
                6.4 —_ Timing of GST payment
                       The GST Amount will be paid by the recipient on the same date the
                       consideration for the supply is to be provided under this Deed.
                6.5    Tax invoices
                       The recipient is not required to pay the GST Amount until the supplier has
                       provided the recipient with a tax invoice in respect of the taxable supply. If the
                       supplier has not provided the recipient with a tax invoice prior to the time that
                       the GST Amount is otherwise payable under this clause, the recipient must pay
                       the GST Amount within five days of the receipt of the tax invoice.
                6.6    Adjustment events
                       If at any time an adjustment event arises in respect of a taxable supply made
                       by a supplier under this Deed the supplier will provide the recipient with an
                       adjustment note for the adjustment immediately upon becoming aware of the
                       adjustment. Where such      an  adjustment event arises,    a corresponding
                       adjustment will be made to the GST Amount and a payment will be made by
                       the recipient to the supplier or the supplier to the recipient as the case requires.
                6.7    Reimbursements
                       Where a party is required under this Deed to pay for or reimburse an expense
                       or outgoing of another party, the amount to be paid by the first party is the sum
                       of:

                                                        9 of 20

                                                                                                   Page 56 of 147

Section 57

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 57 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                   3 MARCH 2015

                       (a)    the amount of the expense or outgoing less any input tax credits in
                               respect of the expense or outgoing that the other party is entitled to; and
                       (b)     if the payment by the first party is consideration for a taxable supply, an
                              amount equal to the GST payable by the other party in respect of the
                               payment.
                6.8    Representatives
                       In the event that liability for payment of GST in respect of a supply under this
                       Deed is imposed upon a representative of a supplier, this Clause 6 (Goods and
                       Services tax) shall nonetheless apply and any amounts to be calculated
                       pursuant to this clause shall be calculated in all respects as if the supplier was
                       liable for the GST imposed on such supply and entitled to input tax credits
                       properly allocated to the making of that supply.
                6.9    Pay As You Go (“PAYG”)
                       PAYG instalments will be deducted from payments to be made to the Claimant
                       if at the time of payment the Claimant has not provided to the Council a valid
                       Australian Business Number or if the Council otherwise reasonably forms the
                       view that deductions are required to be made under Par 2-5 of the Taxation
                       Administration Act 1953.

                7      DEFAULT BY APPLICANT

                7.1    Rights of the Council on default
                       If the Applicant fails to duly perform and fulfil any or all of its obligations in
                       respect of the Infrastructure Contribution, in addition to any other of its rights or
                       remedies at law, the Council may recover from the Applicant the amount of any
                       deficiency in payment or its costs of carrying out or completing any works.
                7.2.   Application of money
                       The Council may apply any sum recovered or received by it pursuant to
                       Clause 7.1 (rights of the council on default) as far as the sum may extend to or
                       towards all or any one or more of the following:
                       (a)     reduction or discharge of the payments or contribution payable by the
                              Owner under this Deed; and
                       (b)     reimbursing itself for the cost of works done and for any damages
                              suffered by it.
                8      NOVATION OF DEED UPON SALE
                8.1    Sale of the Subject Site
                       The Applicant must      not sell or transfer the Subject Site prior to the
                       performance and fulfilment of the Special Conditions as contained in this Deed
                       except subject to the condition that the purchaser (in this clause called “the
                       Purchaser’) shall enter into a deed of novation of this Deed or a replacement
                       Deed with the Council, whereby the Purchaser becomes contractually bound to
                       the Council to perform and comply with the Special Conditions, or such of them
                       as remain unperformed or unfulfilled by the Applicant at the time of such sale.
                8.2.   Applicant to remain liable

                                                       10 of 20

                                                                                                   Page 57 of 147

Section 58

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 58 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                    3 MARCH 2015

                        In the event that the Applicant sells or transfers the Subject Site otherwise than
                        in compliance with Clause 8.1 (sale of the subject site) the Applicant must
                        perform and fulfil the Special Conditions at such time or times as the Council
                        stipulates, even if the time or times otherwise appointed for such performance
                        and fulfilment have not then arrived.
                8.3     Release from Liability
                        In the event that the Purchaser enters into a deed of novation or such further
                        deed or agreement which contractually obliges the Purchaser to the Council to
                        perform the Covenants, the Owner shall be forever released from the Special
                        Conditions or any further liability pursuant to this Deed or otherwise arising
                        from its subject matter and the provisions of this clause may be pleaded as a
                        bar to any proceedings brought by the Council.
                9       RECONFIGURATION OF THE SUBJECT SITE

                9.1     Reconfigured lot no longer bound by special conditions
                        If the Subject Site is reconfigured under the provosions of the SPA to create a
                        lot which is provided with infrastructure and services necessary to enable its
                        use in accordance with a development approval and is not intended to be the
                        subject of a material change of use and/or further reconfiguration, then the
                        Special Conditions no longer remain attached to the reconfigured lot and the
                        Owner of the reconfigured lot is no longer bound by the Special Conditions.
                9.2     Reconfigured lot remaining bound by special conditions
                        If the Subject Site is reconfigured to create a lot comprising:
                        (a)    the Subject Site or
                        (b)    part of the Subject Site which is not a reconfigured lot referred to in
                               Clause 9.1,
                       the Special Conditions remain attached to the reconfigured lot and the Owner
                        of the reconfigured lot remains bound by the Special Conditions
                10      SERVICE

                10.1    Service by prepaid post
                        A Notice is sufficiently made, given or served by a party if left at or forwarded
                        by prepaid post in an envelope addressed to the other party or any of them
                        (where there are more persons than one person comprising the other party) at
                        the address of that party specified in Schedule 1.
                10.2    Deemed service

                        A Notice if sent by prepaid post is deemed to have been made, given or served
                        at the time when in the due course of the post it would be delivered at the
                        address to which it is directed whether or not it is actually received.
                10.3.   Proof of service

                        In proving service of a Notice made, given or served by the Council it is only
                        necessary for the Council to certify to that effect under the hand of the Chief
                        Executive Officer.

                                                        11 of 20

                                                                                                    Page 58 of 147

Section 59

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 59 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                     3 MARCH 2015

                 10.4   Form of Notice

                        (a)    A Notice given by a party must be in writing and signed by the party.
                        (b)    A Notice given by a party may be signed by an officer of that party or
                               the solicitor for that party.
                        (c)    A party receiving a Notice is not obliged to enquire as to the authority of
                               the person signing the Notice.
                 11     MISCELLANEOUS

                 11.1   Payment of costs
                        Each party shall pay their own costs, charges and expenses of and incidental to
                        the negotiation, preparation, execution, completion and stamping of this Deed,
                        all counterparts of it and any other document required under this Deed.
                 11.2.  Time

                        Time is, in all cases, of the essence.
                 11.3   Place for payment of monies
                        All monies payable to a party under this deed are payable free from all
                        deductions at the address of that party specified in Schedule 1.
                 11.4   Waiver

                        No waiver by the Council of any breach by the Owner of any of the provisions
                        of this Deed shall be implied against the Council or be otherwise effective
                        unless it is in writing under the hand of the relevant Chief Executive Officer.
                 11.5   Laches and delay
                        No laches or delay by the Council at any time or times in enforcing any of its
                        rights, powers and the like under this Deed prejudice or affect those rights or
                        powers.
                 11.6   Severance

                        If any provision of this Deed cannot be given effect or full force and effect by
                        reason of statutory invalidity that provision shall be served or read down but so
                        as to maintain and uphold so far as possible the remaining provisions of this
                        deed.

                 11.7.  Warranty of authority
                        Any person signing this Deed:
                        (a)    as attorney of any party warrants to the other parties that at the date of
                               execution that person has not received any notice or information of the
                               revocation of the power of attorney appointing that persons; and
                        (b)    as an authorised officer, agent or trustee of any party warrants to the
                               other parties that at the date of execution that person has full authority
                               to execute this deed in that capacity.

                                                         12 of 20

                                                                                                     Page 59 of 147

Section 60

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 60 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                   3 MARCH 2015

                11.8   Further assurances

                       Each party agrees at its cost to do everything reasonably necessary to give
                       effect to this deed.

                11.9   Force Majeure
                       (a)     If a party is unable by reason of an event of Force Majeure to carry out
                               its obligations under this Deed, that party must give a Notice to the
                              other party advising of the event of the Force Majeure as soon as it is
                               reasonably practicable after the event of a Force Majeure.
                       (b)     If a party gives a Notice advising of an event of Force Majeure, that
                              party’s obligations will be suspended during the period for which the
                              event of Force Majeure or its effect extends.
                       (c)    Where the obligations of the Council       are dependent upon the
                              occurrence of specified circumstances, then the Council will be relieved
                              of its obligations for so long as there is a change or deviation or non-
                              occurrence of those circumstances arising from a matter beyond the
                              Council's Control.

                11.10 Amendment of deed
                       (a)     Despite any provision of this deed, the parties may at any time agree to
                              vary the terms of this Deed
                       (b)     No modification, variation or amendment of this Deed is of any force or
                              effect unless:
                               (i)  it is in the form of an amendment Deed and has been signed by
                                    the parties; and
                               (ii) where   relevant  the  amendment     Deed   complies   with  the
                                    requirements of the Act.

                                                       13 of 20

                                                                                                   Page 60 of 147

Section 61

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 61 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                           3 MARCH 2015

                                               SCHEDULE 1

                                                Deed Details
               ITEM 1      Date                  Commencement Date in accordance with
                                                 Clause 1.4 - Definitions

               ITEM 2      Name of Deed           Infrastructure Deed In Respect of Provision of
                                                  Park and Embellishment Infrastructure for a
                                                  Development Permit for Reconfiguration of a
                                                  Lot.
               ITEM 3      Council                Noosa Shire Council
                                                 9 Pelican Street, Tewantin in the State of
                                                 Queensland
                                                  PO Box 141, Tewantin QLD 4565
               ITEM 4     Applicant              Valkev Pty Ltd
                                                 ACN 160 921 059
                                                 220 Lonehand Rd EUMUNDI QLD 4562

               ITEM 5      Subject Site           Lot 5 SP 266731,
                                                 61 Lake Macdonald Drive, Cooroy, QLD 4563
                                                 and
                                                  Lot 8 SP 266743
                                                  1 Wilgee Court, Cooroy, QLD 4563
                                                 and subject to Schedule 2, Special Condition 7,
                                                  Lot 135 MCH 978
                                                  Pearsons Road, Cooroy
                                                  Locality of: Cooroy
               ITEM 6      Development            REC13/0146, REC14/0008, REC14/0009
                          Applications           and subject to Schedule 2, Special Condition 7,
                                                  REC13/0148
               ITEM 7      Development            Development Permits for Reconfiguration of a
                           Permits                Lot: REC13/0146, REC14/0008, REC14/0009
                                                 and subject to Schedule 2, Special Condition 7,
                                                  REC13/0148.

               ITEM 8      Special Conditions     Provision of Park and Park Embellishment
                                                  Infrastructure requirements and   Offset of
                                                  Infrastructure Charges  to  be  fulfilled in
                                                 accordance with Schedule 2
               ITEM 9      Appeal                 Not Applicable

                                                   14 of 20

                                                                                           Page 61 of 147

Section 62

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 62 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                     3 MARCH 2015

                                                     SCHEDULE 2

                                                  Special Conditions
                 1.   A Development Permit for Operational Works for park landscaping and
                      embellishment infrastructure is to be issued prior to commencing construction;
                 2.   Park and Park Embellishment Infrastructure to be provided
                      Park Embellishment Infrastructure are to be provided by the Applicant/owner as
                      follows:
                       a. generally   in  accordance   with  plans   prepared   by  Play  Environment
                           Consulting contained in SCHEDULE 3 consisting of:
                            i. Concept Plan - drawing number 14/005-S01 dated 17.11.2014 as
                                  annotated by Council;
                            ii. Concept Plan - drawing number 14/005-S02 dated 17.11.2014;
                       b. Table 1: Park Embellishment Details:
                                        Minimum | Park
                                        Quantity | Stage
                       Park Signage,                           In accordance with The Noosa Plan, Planning Scheme
                        Landscaping         1         A                  .
                                ee                             and Operational Works Approval
                       and Lighting
                                                            e  Compacted fill in accordance with Australian Standards
                                                               to above Q100 flood level;
                                                            e  Play equipment (or similar):
                       Activity Mound       1         A        o   Slide,
                                                               o   Boulder Steps;
                                                               o   Scramble wall;
                                                               o   Tyre Steps;
                                                               o   Rope walk
                       Raised               1         A     e  Compacted fill in accordance with Australian Standards
                        Meeting Point                          to above Q100 flood level
                       Water Suppl                          e  2x Water Connection Points with hose cock
                                Pply                        e  1x Drinking Fountain (water mark product with the
                       & Connection         3         A                    .        .            :    .
                      Points                                   waste to be discharged into a rubble pit designed by a
                                                               geotechnical engineer
                        Double Swing        1         A     e  To be constructed from hardwood timber with 4 metre x
                                                               3 metre rubber ware pad
                                                            e  Landmark Pro - 402 Portland 4 x 4m shelter (Hard wood
                                                               or pine);
                                                            e  Concrete slab to be 5 metres x 5 metres x 125mm
                        Park Shelter        1         A        concrete slab broom finish;
                                                            e  Structure colour to be Noosa Green;
                                                            e  Roof to be Colorbond classic cream;
                                                            e  One shelter to be located on the Raised Meeting Point.
                        Park Table                          e  Page Furniture Seaside Range;
                        Setting                             e  Aluminium Frames with timber or perforated aluminium
                        Park Bench                             table top and seating;
                        Seat               4          A     e  Concrete slab to suit.
                                                            e  In accordance with Sunshine Coast Council Open
                        Rebound Wall        1                  Space Landscape Infrastructure Manual (LIM) Sports
                                                               and Games
                        Basketball Half     1               In accordance with Sunshine Coast Council Open Space
                       Court                                Landscape Infrastructure Manual (LIM) Sports and Games

                                                         15 of 20

                                                                                                      Page 62 of 147

Section 63

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 63 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                   3 MARCH 2015

                3.    Other Requirements:
                      a. All Playground equipment and soft fall surfacing is to be certified to comply
                          with Australian Standards: AS4685.1:2014 to AS4685.6:2014 and be
                          provided with a minimum 5 year warranty.
                       b. A level 3 comprehensive playground safety audit, all warranties and
                          maintenance manuals are to be provided on handover of park and
                          playground equipment;
                      c.  Boulders/Rocks to be rounded with no sharp edges;
                      d. Soft fall to be Bassett Bark, Takura Bark or Rubber soft fall (EDPM) and
                          certified;
                4. — Time for Completion
                      The Park Embellishment Infrastructure may be provided in stages as detailed in
                      special condition 2 of this Schedule 2and must be completed in accordance with
                      the following:
                      a.  Park Stage A: before the local government releases the survey plan for the
                          last plan of subdivision relating to the Development Applications and Permits
                          REC13/0146, REC 14/0008 and REC14/0009;
                       b. Park Stage B: before the local government releases the survey plan for the
                          plan of subdivision for Development Application and Permit REC 13/0148.
                5.    Payment and Offset of Infrastructure Charges
                      a.  Infrastructure charges are to be paid in accordance with the infrastructure
                          charges notice/s issued applicable to the relevant Development Permits;
                       b. The Infrastructure Contribution for the dedication of Park relevant to REC
                          13/0146 and provision of Park Embellishment Infrastructure — will wholly
                          offset the amount apportioned to the Public Parks and Land for Community
                          Facilities network component specified in the Infrastructure Charge Notice
                          for each Development Permit; and
                      c.  The offset will only apply after dedication of the Park and completion of the
                          Park Embellishment Infrastructure and hand over of the park asset to
                          Council in accordance with special condition 4.
                6.    Refund of Infrastructure Charge Payments Subject to Offset
                      Payment amounts received by Council relating to special condition 5b above will
                      be refunded in accordance with the following:
                       a. for amounts up to $150,000: the refund will occur in the December quarter in
                          the financial year following completion of the works contribution and hand
                          over of the park asset to Council;
                       b. for balance amounts over $150,000: the refund will occur in the December
                          quarter in the second (2") financial year following completion of the works
                          contribution and hand over of the park asset to Council.
                7.    Applicability Infrastructure Agreement to Lot 135 MCH 978, Pearsons Road,
                      Cooroy, REC13/0148 and Park Stage B
                      This infrastructure agreement will only apply to Lot 135 MCH 978, Pearsons
                      Road, Cooroy, REC13/0148 and Park Stage B on the provision that the
                      Applicant becomes the Owner of Lot 135 MCH 978, Pearsons Road, Cooroy in
                      accordance with Clause 3.1 Warranty of Ownership.

                                                       16 of 20

                                                                                                   Page 63 of 147

Section 64

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 64 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                           3 MARCH 2015

                                       SCHEDULE 3
                                      Concept Plans

             v4                   EIS MICPMORBOOMEIIR                    «4
               a                   zt     4  6  PRG     a a       322   Ss ezPzEER
               oe                  PY   PGE     PRET      EP      at    aE
                                   S08 - 208, 000            a           eigzee
                52             _                     aa                  peeves
               eg       re                                    |          “2 4
               ag Mm    ae oot                       i      on
               36 2                          :       oe      ll
               gt a            Rees            Pitts        :
              eRe 3            Le              sce      *   a
              ase Zz           “1                       (">
              sky =  |—~—__      3     a Bgze    ce          FA
              a      rs   ahem         Fat     ee kes a      oo
              eee                tt            pete          a
              RSF Q                    Gerke Roo                      |
               ge 9                    28:      ga A ees ge a oN        ee
               88 3  |g                            fr)
               a> Cc 2      =                        PN tat. tt 48 dt
                rs ie                         Se Maas nS                         |
                  =e is                       ;   x      Dees Ao
                * 2 ip                        ah    “a   Be eiitete aod 6
                  a                         ry   :       Bad en a4 4 fs
                     i=                    <Beag Sea. Cpe ews                  ;
                eye] :       /       |       oA       ie    Be eter     my       »
                Som  448                      a      Pree ema SY                 oR
                fas |                            UMMM St
                 zz                               OMI (eee ne
                ees |               |                 ere.           [Tf
                          J                     =          pens      pet Std eeatys
                          |       |             ie uo
                  =        gan               Aa hy fe                     Ro Sta
               9323} Se           ea              *   aes Pe AL      a tfns ee ed
               ange      Prieto atd                                  PERERA Geo
               BQne      We a ae ae  oe NO     ee aL ee 3  ieee sta g      6d eg:
               Be       Lit                oo               ae         ee        as
                 SB] fe fi LEN Oe                                    ML
              fae ol                        ed             SN            ZZ
              agttpis oe eh, ee             .             ce" 4   ‘        .
                ea 4 fens  —— re      —    %             a ht      ) P    L
              Bn    Fe                                   Festa!           et
              ee                                                             |
               Hr       ¢  ‘   ‘  ‘  ; Parca wt aT      or \                 i
                  fet ‘   ’  +. te     Cae             :       \
                   :                    oo   a        :        \
                 ou  See   a   ¢  .   4  <  « ew                \
              t  § i}        ‘             rie eZ               \        ee
              i =  i    é                4  ty                w=                rma
             eye                           a             af
              a    g                       ea        ae
                   b                      ve  €   —                  _        a
                   = rr.               Z                      Pe a, Uae          —
                           Ta        sie                  sey           |          |

                                          17 of 20

                                                                           Page 64 of 147

Section 65

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 65 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                              3 MARCH 2015

                            es —=            ~       eas Sy eg ae       ee          -
                       5                                    ,        ,   Es     ssa
              SAX. 1 Gees                 x          :   a    =   €    €         ‘ * €
                ay     =                      he           ere                     :
               ce                      |  a                share            ——
              = / pesos                  ~  i        5     o re é         rsa    . |
                   y || (es           Ah.         A        SESS                   >
                 8S || 7               @»"      G          RD:              eae     <
                Holl           FEET CR                 SSO                        a
                 2 <     3      2 Mae  ten             CORY AR
                at ord   &      n Pot ECE         .    SA Sy   iy      é- fj        ge
                Ses            £ EP E Se <p RSS       Fe) enh    eS eae
               in  2           28 (OR             et Toh BSW)                 Seas.
               288 O                       Os        ag  ‘\\ yet eae ee |       é   z
               ane Z                  Sys Hehe   OD RE      forte SSRN
               ake =                Se RCE Ne SN YDS Ec yre S                     €
               gus 1                   2”      RRR AED Noe     t ee  ETE E TS
               st: 4                   SVS eM OO\                                   «
              SSF o                     eel Sh Bee       SL     ee ah es          €    :
               ~                       \ RRR RR ne hacer
                geo ag                  Se RCA NC)
                se Q                      aS     Tt I Ve) = a pea              | ee oh
                   ¢ |:               Che      ae        jy           eG
                "ES |B)                                                  RY.
                 # Zip                ETS BU SAG         SS RAO ~y NV             Es
                   @ | 5S                SSSR      ae  RD a ee he)
                                       Sr BRS SSs Wie                           <   *
                 myst] § E:            Sel           ea eet           RPO Lc
                 eset) Fh:                  RES PRIS oO)
                 555   £              4 ee $ fone Rat TR. cen bor 1° Ls eS ihe ty € €
                 Bas                  Were REP      SAS AN Sey,                   5
                                      Ko ARSE YS thee       NIKO  fe,  RI              ‘
                 be: |   |’           REE EES SEEN                              |.
                  z°                     5 ENR a ee ee DO                              ae
                  :                   EP            OO
                         .            =     RES      RS SS, Se oN  oy a ‘a      €
                         '          Ai SERN RO                                    e's 4
                                    Co    RE RRL
                gBaz                 Ee   BRS Qi 5 4S RR       stl) > x Ae          €
                25                   i RS        t eat AS OO aes aes Peon) .
                88 ae                   a ey SOR               RY                 Sole
                                    "    RSS       _    ROS       Rul ea        =
                 Son                   ESS            CX OH       PR    Cy
                425                   Ay ey        €    NOX SP         —     he        ‘
                  3   C   roe G Soe at           @:. x€ ore          \@      e ~~
                  HRI 7                               SOO            <F:               .
                   <  Ie  € \" es /                  €    €      a
               jae. .                                         saa)       «|          |
                a4 se :   €     is      €   o"       €    «| Vee     F €
              Hi aie    -    €        .     i          €      \ te    '  €        gia * |:
               betes |    &        «    -«  iy    . aes                €.  ‘@-  €.° 4%
                seat    ¢        «   qe =              ti: 9             é    <
                   i :         «   ~    « de         «    ¢            €        f   €
                    *8       €   <   «    . a          «                      «   €    ‘
                  \(..           -  SS0C0BRORROEA                            ~~
                 5             é    a          :  ¢    3     2 €  §  FB E  FePEPeee
                 :  i               3     §  i j  : z i   i  q i  >  4 =   He
                             -               j                 §            | Bihows
                                                               5             Z2eG 2
                               a                                            “FOmozZ
                                 ‘                                            n° 83
                                                                              #3  3
                                                                               6  4

                                            18 of 20

                                                                               Page 65 of 147

Section 66

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 66 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                        3 MARCH 2015

               EXECUTED AS A DEED.

              This deed dated this    day of                            2014
               BETWEEN     NOOSA SHIRE COUNCIL a Local Government duly constituted under
                           the provisions of the Local Government Act 2009
                                                                                 (“Council”)

              AND          VALKEV PTY LTD ACN 160 921 059
                                                                           (“the Applicant” )

               SIGNED SEALED AND DELIVERED by the delegated officer         )
              for and on behalf of the NOOSA SHIRE COUNCIL:                 )

               ihiamey           re

               (ignaturey                ee

               Daisy                     ee

               In the presence of Witness being a Justice of the Peace: )

               ihvamey              rr

               (igngturey Oe

                                                  19 of 20

                                                                                         Page 66 of 147

Section 67

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 67 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                          3 MARCH 2015

             “the Applicant”
             Executed by VALKEV PTY LTD ACN 160 921 059                 )
             In accordance with Section 127 of the Corporations Act 2007: )

             (DirectoriCornpany Secrelany                (Directoy

             Signature)                                  Signature)

             Cateye                                      Date

             In the presence of Witness being a Justice of the Peace: )

             ihiamoy           rr

             ignaturey               ee

                                                   20 of 20

                                                                                           Page 67 of 147

Section 68

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   3 MARCH 2015


Strategic Land Use Planning
5    NOOSA COMMUNITY PROFILE & DEMOGRAPHIC REVIEW
Author           Principal Strategic Planner, Rowena Skinner
                 Planning & Infrastructure Department

Index            ECM /Project: Community profile / Subject: Statistics

Attachments      1.    Community Profile Noosa Shire - AEC Group
                       (76 page document - provided separatately to this Agenda,
                        2 hard copies available in the Councillors’ Room)


EXECUTIVE SUMMARY
This report provides demographic information on Noosa Shire and brings forward a
community profile prepared by AEC Group. This material provides an important foundation
for various forward planning projects including the social plan, economic plan, housing
needs analysis and the next planning scheme.

RECOMMENDATION
That Council note the report by the Principal Strategic Planner to the Planning &
Organisation Committee Meeting dated 3 March 2015 and endorse the Community Profile
prepared by AEC Group for use in policy preparation.


REPORT
1. Statistical Geography

As a consequence of local government boundary realignments in 2004, 2008 and 2014
there has been a disconnect between the boundaries of Noosa Shire Council and the
Australian Bureau of Statistics (ABS) census localities from both the 2006 and 2011 census
counts.

From the 2006 census Noosa Shire was generally contained within the four Statistical Local
Areas of Noosa Hinterland, Tewantin, Noosa - Noosaville and Sunshine - Peregian.
However this excluded “South Peregian” which was transferred to Noosa Shire in 2004.

In July 2011 (just before the last census) the ABS adopted a new Australian Statistical
Geography Standard in which the Sunshine Coast Region was a local government area.

At the 2nd level Statistical Area (SA2) Noosa Shire is included within the following areas:
•     Tewantin
•     Noosaville
•     Noosa Heads
•     Sunshine Beach
•     Peregian
•     Noosa Hinterland

However for the latter two, only part of the SA2 is within Noosa Shire. The Queensland
Government Statistician's Office has applied the following concordance to enable the
release of various estimates for Noosa Shire Council (2014).



                                                                                   Page 68 of 147

Section 69

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 3 MARCH 2015


Peregian      SA2     316051436      49.1247812% to Noosa
Peregian      SA2     316051436      50.8752188% to Sunshine Coast

Noosa Hinterland      SA2    316041433      83.9975047% to Noosa
Noosa Hinterland      SA2    316041433      16.0024953% to Sunshine Coast

This has been done without consideration of factors which might affect demographic or
socio-economic data. For instance there is no differentiation between the new master
planned greenfield community of Peregian Springs and the established beachside
communities of Peregian Beach and Marcus Beach.

At the 1st (smallest) level, there are 149 SA1s making up Noosa Shire. These Statistical
Areas align with the Noosa Shire local government area with the exception of one (being
31604143356 at Doonan) where only 22.695% is assigned to Noosa Shire. This equated to
only 22 houses at the time of the 2011 census, and 30 now.

As previously discussed with Councillors, for the purpose of the community profile the Shire
has been divided into 9 localities. These are:

   Boreen Point, Kin Kin and Cootharaba
   Federal to Ringtail Creek (including Pomona and Cooran)
   Cooroibah
   Noosa North Shore
   Ridgewood to Tinbeerwah (including Cooroy)
   Tewantin
   Noosaville and Doonan
   Noosa Heads
   Sunshine Beach to Peregian Beach

While there are many different ways this could have been done it was necessary to build up
from SA1 level and the resultant localities are by no means equivalent in size or population,
but broadly represent communities of interest. Readers of the report are cautioned that
because of the low number of Noosa North Shore residents interpreting results for this
locality can be problematic.

AEC Group was commissioned to produce a Community Profile which compared data for the
9 localities and also compared Noosa Shire with both South East Queensland, and the
State. Their report is attached and is summarised in the following sections.

2. People

The AEC report advises that since 2006 the Noosa Population has been increasing at a
slower rate than both South East Queensland’s and the State’s. Noosa’s estimated
residential population at June 2013 was 52,419 people.

From the mid 1970s to the mid 1990s Noosa Shire experienced rapid population growth.
The average annual growth rate over the 12 years from 2001 to 2013 was 2.0% and more
recently the average annual growth rate over the 2011-2013 two year period was 1.3%.
Growth over time is summarised in Figure 1 below.




                                                                                 Page 69 of 147

Section 70

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                            3 MARCH 2015


Figure 4 Estimated Resident Population Noosa Shire 1976-2011

                                                 60,000                                                                              20.0%
                                                                   Estimated residential population     Ann. Av. Growth (%)

                                                 54,000                                                                              18.0%
           Estimated Resident Population (No.)

                                                 48,000                                                                              16.0%




                                                                                                                                             Annual Average Growth (%)
                                                 42,000                                                                              14.0%

                                                 36,000                                                                              12.0%

                                                 30,000                                                                              10.0%

                                                 24,000                                                                              8.0%

                                                 18,000                                                                              6.0%

                                                 12,000                                                                              4.0%

                                                  6,000                                                                              2.0%

                                                     0                                                                               0.0%
                                                          1976   1981      1986       1991       1996   2001      2006        2011



While Queensland is aging, Noosa is aging at a faster rate and at 45.9 (in 2011) Noosa’s
median age is higher than that for either SEQ or the State. Locally the highest median age
was 54.0 at Noosa North Shore followed by Noosa Heads at 50.0 years. Even the lowest
median age at 42.3 for Sunshine Beach to Peregian Beach was higher than Queensland’s at
36.0 or SEQ’s at 38.1 years.

Figure 2 below shows that since 1991, the Shire has seen a significant increase in the
proportion of residents aged 45 years and over. Residents aged 45 years and over
accounted for 50.9% of the population in 2011.

The proportion of residents aged 65 years and over has grown from 16.5% of the Shire’s
population in 1991 to 19.3% in 2011. Looking forward 1, almost a third of all residents in the
Shire are projected to be aged 65 years and over by 2036. The proportion of residents aged
85 years and over rose from 0.9% in 1991 to 2.2% in 2011 and is forecast to be 5.5% by
2036.

Since 1991, both the number and proportion of the Shire’s residents aged between 25 and
34 years has decreased.




1
 SA1 population projections by five year age group 2013 edition provided by Queensland Treasury &
Trade


                                                                                                                                                                Page 70 of 147

Section 71

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  3 MARCH 2015


Figure 5 Residents by Age Bracket, Noosa Shire 1991-2036




Locally, Tewantin is particularly well represented by people 75 years and over, followed by
Noosa Heads, Noosa North Shore and Noosaville and Doonan. Federal to Ringtail Creek,
Sunshine Beach to Peregian Beach and Cooroibah had the highest proportion of children up
to 14 years of age.

The rate of natural increase in the Sunshine Beach to Peregian Beach area is reasonably
sound at 8 persons per 1,000 local residents (although still below the State figure of 9.9 per
1,000) but it is considerably less in other areas and in Noosa Heads and Tewantin it is
actually negative.




                                                                                  Page 71 of 147

Section 72

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  3 MARCH 2015


Only a very small proportion of Noosa’s population identified as Indigenous and of these the
majority were Aboriginal.

Approximately 72.5% of the Shire’s population were born in Australia. The figure was over
80% for the hinterland localities and as low as 70.6% for Noosaville and Doonan. The most
common places of birth outside of Australia were the United Kingdom and New Zealand.
Most localities reported having over 95% of residents speaking only English in the home.
Aside from English, generally German, French and Italian were most commonly spoken.

3. Households and Families

The AEC report shows that the most prominent family category across all localities in 2011
was “couple families with no children”. At 47.9% almost half of all families in the Shire fell
into this category, well above regional and state proportions. There was significant variance
with the highest proportions at Noosa Heads (60.0%) followed by Noosa North Shore and
Noosaville and Doonan, reflective of the high number of “empty nesters” attracted to these
localities.

Accordingly the rate of “couple families with children under 15” was less than SEQ and
Queensland rates. The highest proportions of couple families with children under 15 were in
Sunshine Beach to Peregian Beach and in Cooroibah. The highest proportion of one parent
families was reported in Tewantin.

Cooroibah reported the highest 2011 average household size at 2.8 persons per household.
At the lowest end the figure was 2.2 persons for Noosa Heads and Noosaville & Doonan.
The Shire average was 2.4 while the SEQ region and state averages were both 2.6 persons.

Noosa has a high proportion of people living on their own. Census data has shown that the
number of occupied private dwellings with usually one resident has risen from 1,802 in 1991
to 4,661 in 2011. At 2011 25.2% of Noosa households were recorded as lone person
households with the comparative State figure 22.8%.

Tewantin had close to 1,200 lone person households which represented the highest of
localities in both number and proportion. In general the proportion of lone person
households was lower in the hinterland.

Figure 3, not from the AEC report, shows the composition of households in persons for all
occupied private dwellings from the census years 1996 – 2011, for Noosa Shire. While there
has been an increase in each category, one and two person households account for roughly
two thirds of all households by 2011 and the proportion of households with three or more
residents has decreased from 37.9% to 33.6% over that time.




                                                                                  Page 72 of 147

Section 73

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 3 MARCH 2015


Figure 6 Number of households over time by number of occupants

 25,000


 20,000

                                                                 5 or more
 15,000
                                                                 4
                                                                 3
 10,000
                                                                 2
                                                                 1
   5,000


      -
              1996          2001         2006         2011



4. Housing

In 2011 the Shire reported a considerably high representation of unoccupied private
dwellings (19.3% of all dwellings) compared with 10.3% for the State.

Separate houses were generally the most common dwelling type across localities and
particularly in the hinterland where expectedly there were less attached or semi-attached
housing.

For Councillors’ interest our data shows that of building approvals issued for 12 months
since 1 January 2014, some 94% of residential approvals were for detached houses. There
were a few secondary dwellings, eleven approvals for duplexes and a total of 22 units
approved through four projects. The average floor area for new houses was close to 300m 2
and there were 39 with a floor area of over 400m2. The median project construction cost
was $279,000. Despite small household size the housing being constructed is not small.

In 2011, a high proportion of dwellings across localities were “owned outright” (more so than
State and Regional rates), this was particularly the case in Noosa North Shore, Ridgewood
to Tinbeerwah and Boreen Point, Kin Kin and Cootharaba. Some 49.3% of dwellings in
Cooroibah and 46.3% of dwellings in Federal to Ringtail Creek are “owned with a mortgage”.
There is quite a correlation between location of mortgages and location of families with
children with a slight exception for the beaches. Sunshine Beach to Peregian Beach
recorded that over a third of dwellings (36.8%) were being rented.

The median house price in the Shire has remained higher than the State between 2001 and
2014, however the gap is closing. In 2014 the Median house price in the Shire was
$481,410, while in the State was $405,000, this difference was at its lowest in 12 years.

Median mortgage repayments and median rents varied across the Shire but both were the
highest In Noosaville and Doonan locality and both at their lowest on Noosa North Shore.




                                                                                 Page 73 of 147

Section 74

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                     3 MARCH 2015


Median mortgage repayments were lower in Noosa ($1,770 per month) compared to the
SEQ Region ($1,794) and the State ($1,850). However, median rents were higher in the
Shire ($1,445 per month) compared to the SEQ Region ($1,283) and the State ($1,300).

Median rents for flats & units in Noosa generally remained higher than the State between
2001 and 2006. Although from 2007 onwards, the median rent in Noosa was equal to, or
slightly below, that of the State (with the exception of 2014 where median rents were $340
and $330 per week respectively).

Median rents for houses in Noosa remained higher than the State between 2001 and 2014.
In 2014 the median rent for houses in the Shire was $400 per week compared to $350 per
week for the State. This 2014 difference of $50 per week was at its highest in that 13 year
period.

5. Connectedness

Not surprisingly car dependency is greater in areas lacking public transport with higher rates
of families. Cooroibah recorded the highest average number of motor vehicles per dwelling
(2.2) while Tewantin and Noosa Heads were 1.5, just lower than Noosaville and Doonan.

Internet connection is quite good in Noosa Shire with each locality having between 70% and
80% of dwellings broadband connectivity.

The rates of volunteering are slightly higher in the hinterland, followed by the beaches.
Overall Noosa Shire enjoys a slightly higher than average rate of volunteering compared to
the state or SEQ.

Compared to the State or the SEQ there is a higher proportion of residents in need of
assistance with a core activity. In terms of the nine localities there is strong correlation with
the age of residents. Tewantin has 862 residents in need of assistance but it also has the
highest proportion of residents over the age of 75 years.

6. Education

The AEC report shows that residents of Sunshine Beach to Peregian Beach and Noosa
Heads (over the age of 15 and no longer at school) were over 60% likely to have finished
year 12 or equivalent. Noosaville and Doonan had the next highest rate.

Compared to the state Noosa residents were as likely to have finished year 12 or above but
the figure is slightly higher for SEQ. Residents of Noosa Shire were less likely to have only
completed year 8 or below than the state or SEQ.

Of non-school qualification, certificate level qualifications are by far the most prevalent in all
localities across Noosa. 55.9% of respondents stated their highest non-school qualification
was certificate level. Sunshine Beach to Peregian Beach and Noosa Heads had the highest
rates of bachelor degrees and post graduate degrees. On the whole however the
percentage of bachelor and post graduate qualifications in Noosa Shire is lower than that of
the state or SEQ.

The most common fields of study were management and commerce, engineering and
related technologies and health.

Post school education options in Noosa Shire are somewhat limited. Not surprisingly, the
2011 census showed a relatively low proportion of Noosa Shire residents currently studying



                                                                                      Page 74 of 147

Section 75

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                    3 MARCH 2015


at a university or other tertiary institution when compared to the state or the SEQ region.
Sunshine Beach to Peregian Beach and Noosa Heads had the highest proportions at around
15% of resident students.

Noosa Shire offers a range of government, catholic and independent primary schools and
secondary schools as well as the Flexible Learning Centre at Sunrise Beach. In 2013 the
State Government released School Infrastructure Demand Maps which display the average
annual growth of projected primary and secondary school age persons by SA2 level. These
projected growth rates (shown below) are very low and in some instances in the negatives.

                           Primary Schools                             Secondary Schools
        SA2                2011-2021             2021-2031             2011-2021             2021-2031
        Noosa Hinterland   -1% to less than 1%   -1% to less than 1%   1% to less than 2%    -1% to less than 1%
        Tewantin           less than -1%         -1% to less than 1%   1% to less than 2%    less than -1%
        Noosaville         -1% to less than 1%   less than -1%         -1% to less than 1%   less than -1%
        Noosa Heads        1% to less than 2%    less than -1%         1% to less than 2%    -1% to less than 1%
        Sunshine Beach     less than -1%         -1% to less than 1%   1% to less than 2%    less than -1%
        Peregian           less than -1%         -1% to less than 1%   2% or more            1% to less than 2%



7. Employment

The AEC report includes a table of Employment by Industry based on Place of Usual
Residence. It shows the relative dominance of the following industries across nearly all
localities:
     Retail trade;
     Accommodation and food services;
     Health care and social assistance; and
     Construction

Exceptions to the above were Boreen Point, Kin Kin and Cootharaba where 10.8% of
respondents were employed in Agriculture, forestry and fishing, and Noosa North Shore
where 11.2% were employed in Education and training.

Benchmarked against SEQ region and Queensland, Noosa residents are noticeably more
likely to be employed in retail trade or in accommodation and food services. By comparison
they are far less likely to be employed in manufacturing or public administration and safety.

In Noosa, the 2006-2011 period saw a noticeable increase in people employed in health
care and social assistance and to a lesser extent professional, scientific and technical
services and education and training. There was an increase of 212 residents employed in
the mining industry.

Data suggests that Noosa’s knowledge industries (which provides technical and specialist
services to local residents), particularly professional, scientific and technical services and
administrative and support services, reported noticeable growth in employment between
2006 and 2011.

In terms of occupations of employed residents, professionals were well represented in all
localities, as were technicians and trade workers. There were high proportions of managers
in Noosa Heads, Boreen Point, Kin Kin and Cootharaba, Noosaville and Doonan and Noosa
North Shore.




                                                                                                    Page 75 of 147

Section 76

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 3 MARCH 2015


The AEC report suggests there are clear links between occupations and key industries
across localities in the Shire. For instance high proportions of professionals are evident in
localities with stronger employment in health care and social assistance, education and
training and professional, scientific and technical services; high proportions of technicians
and trades workers are evident in localities with stronger employment in construction,
accommodation and food services, manufacturing and agriculture.

The highest proportion of white collar workers was reported in Noosa Heads, followed by
Sunshine Beach to Peregian Beach and Noosaville and Doonan. The highest proportion of
blue collar workers was reported in Cooroibah, followed by Boreen Point, Kin Kin and
Cootharaba and Federal to Ringtail Creek.

Comparatively significant occupations of employment for the Shire in 2011 were
Professionals, Technicians and trade workers and Managers. Compared to the state and
regional figures Noosa was over represented by managers, sales workers and community
and personal service workers, and under represented by clerical and administrative workers
and machinery operators and drivers.

The highest number of registered businesses in 2013 across SA2s in the Shire was reported
for Noosa Hinterland, followed by Noosaville and Noosa Heads.

The highest proportion of businesses employing five or more employees in 2013 was at
Noosaville (at over 15% of local businesses) and Noosa Heads (12.4%). The highest
proportion of non-employing businesses in 2013 was Sunshine Beach (at 70.0% of local
businesses) and Noosa Hinterland (66.7%).

Businesses in the Shire were less likely to employee five or more staff (with 9.9% of
businesses doing so in 2013) when compared to the SEQ Region (11.8%) and the State
(12.2%).

Businesses employing five or more employees were most commonly in population driven,
lower value industries such as accommodation and food services, retail trade and
manufacturing (often associated with a high proportion of part time staff).

8. Socio-economics

Median household and personal incomes were the highest in Sunshine Beach to Peregian
Beach ($1,071.2 and $584.9 per week respectively) and Noosa Heads ($1,039.0 and $580.0
per week respectively). Household incomes were also high in Cooroibah ($1,055.8 per
week).

In 2011, the Shire reported a median household income almost $200 below the SEQ
Region’s and almost $300 below the State’s. Personal incomes were also below the
benchmarks but not as significantly.

The highest rate of unemployment was recorded in Noosa North Shore (at 12.2%), followed
by Boreen Point, Kin Kin and Cootharaba (9.3%) and Cooroibah (9.2%). The lowest rate of
unemployment was recorded in Noosaville and Doonan (6.1%). The Shire’s unemployment
rate (7.5% in 2011) was slightly higher than the SEQ region (6.4%) and the State (6.1%).

Noosa Shire recorded approximately 3.6 families per 1,000 local residents having no parent
employed. This was higher than the SEQ region (3.1 families per 1,000) and the State (3.2
families per 1,000). Cooroibah and Federal to Ringtail Creek both had comparatively high
rates at 11.8 and 10.2 families per 1,000 residents respectively.



                                                                                 Page 76 of 147

Section 77

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                         3 MARCH 2015


The ABS has developed Socio-Economic Indexes for Areas (SEIFA). One of these, the
Index of Relative Socio-Economic Disadvantage (IRSD) summarises variables that indicate
relative disadvantage. This index ranks areas on a continuum from most disadvantaged to
least disadvantaged. A low score on this index indicates a high proportion of relatively
disadvantaged people in an area. A high score has a relatively low incidence of
disadvantage2.

When applied collectively across the nine localities it shows a small level of variance
between localities. In 2011 those localities considered to be more disadvantaged were
Noosa North Shore, Boreen Point, Kin Kin and Cootharaba, Tewantin and Federal to Ringtail
Creek. Scoring between 955.9 and 976.5 these were all lower than the Australian average
being 1,000.
Areas reporting lower levels of relative disadvantage were Noosa Heads, Noosaville and
Doonan and Sunshine Beach to Peregian Beach.

Noosa Shire as a whole had a score of 1,000.9 suggesting it is slightly more disadvantaged
than the SEQ region which scored 1,015.2.

Importantly however, within each of the 9 localities there is considerable variation and there
are several SA1s where the score was below 920, as low as 843 in a couple of SA1s. By
comparison there are SA1s with scores over 1100, going as high as 1145.

The ABS acknowledges that as measures of socio-economic conditions, the indexes are
best interpreted as ordinal measures that rank (order) areas and recommend using the index
rankings and deciles for analysis, rather than using the index scores. For that reason a map
has been included in the appendix of the AEC report rather than the table of scores.

For Councillors’ information the Index of Relative Socio-Economic Advantage and
Disadvantage (IRSAD) summarises variables that indicate either relative advantage or
disadvantage. This index ranks areas on a continuum from most disadvantaged to most
advantaged. An area with a high score on this index has a relatively high incidence of
advantage and a relatively low incidence of disadvantage.

Due to the differences in scope between this index and the IRSD, the scores of some areas
can vary substantially between the two indexes. For example, in an area that has parts
containing relatively disadvantaged people, and other parts containing relatively advantaged
people (as can occur through regeneration of an older suburb) it may have a low IRSD
ranking, due to its pockets of disadvantage. However, its IRSAD ranking may be moderate,
or even above average, because the pockets of advantage may offset the pockets of
disadvantage. For this reason it might be a truer reflection of the area but disguise the level
of disadvantage present for some.

While the AEC report includes the IRSD a comparative map of the IRSAD is provided below.
Both indexes could be included if Council prefers and individual maps are available for each
of the 9 localities.




2
 This is a useful index for identifying pockets of disadvantage because there is no “contamination” by
measures of advantage, however it might not give the best overall representation of a community.


                                                                                         Page 77 of 147

Section 78

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015


Figure 7 IRSAD map of Noosa Shire




                                                   Page 78 of 147

Section 79

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               3 MARCH 2015


Previous Council Consideration

Nil

Finance & Risk

Nil

Consultation

External Consultation - Community & Stakeholder

Nil

Internal Consultation

Various parts of Council including those responsible for the social plan and economic plan
reviewed and commented on a draft version of the AEC report before it was finalised.

Departments/Sections Consulted:

X     Community Services                   X   Planning & Infrastructure
      Disaster Management & Public Order       Building & Plumbing Services
      Waste & Environmental Health             DA Planning
      Community Facilities                     Strategic Land Use Planning
      Cultural Facilities                      Asset Design & Investigations
                                               Asset Planning
                                               Civil Operations
                                               Environment

X     Executive Office                         Corporate Services
      Community Engagement                     Finance
      Customer Service                         ICT
X     Executive Support                        Procurement & Fleet
      Governance                               Property & Facilities
      Human Resources                          Revenue Services




                                                                               Page 79 of 147

Section 80

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                  3 MARCH 2015


CORPORATE SERVICES DEPARTMENT REPORTS
Finance
6    DECEMBER 2014 QUARTERLY BUDGET REVIEW REPORT

Author           Manager Financial Services, Wayne Jensen
                 Corporate Services Department

Index            ECM/ Subject/ 7.06 2014/2015 Budget

Attachments      1.    Schedule of Proposed Budget Adjustments
                 2.    Revised Budget Financial Statements


EXECUTIVE SUMMARY
A full review of budget performance of all activity areas has been undertaken based on
actual income and expenditure for the 6 months to 31 December 2015, and including
additional information that has come to light since the first quarter budget review.

In summary, the forecast operating position has improved by $11,666 and the capital
program has reduced by $560,770. The proposed changes have no significant impact on
any of Council’s 3 long term financial sustainability indicators.

RECOMMENDATION
That Council note the report by the Manager Financial Services to the Planning &
Organisation Committee Meeting dated 3 March 2015 and approve the requested changes
to the budget for the 2014 / 2015 financial year, as outlined in the attached Budget Financial
statements.


REPORT
Section 170 (3) of the Local Government Regulation 2012 allows Council, by resolution, to
amend the budget at any time before the end of the financial year. Consequently, formal
reviews are undertaken quarterly in addition to monthly monitoring and reporting. These
reviews take into consideration any new information received and account for trending
movements in different budget areas based on the actual income and expenditure incurred
to date.

The revised budget statements identify statement line items that have been affected by the
proposed budget adjustments, and also show the long term impact on the financial position
and sustainability ratios for Council. The schedule of proposed budget adjustments provides
a more detailed analysis for each variance.

1.   Operating Budget Adjustments

There have been a number of changes to the operating budget based on the half-yearly
operating position, and to account for changes in accounting treatment for some line items
and for areas not included in the original budget.




                                                                                  Page 80 of 147

Section 81

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                               3 MARCH 2015


Significant changes for key elements include:

Operating Revenue
 Rates, levies and charges
     o    Change in the accounting treatment for prepaid rates following the
          recommendation of Council’s external Auditors
     o    Noosa Waters Lock & Weir levy refund of accumulated surplus
 Fees and Charges
     o    Additional parking revenue
     o    Reduction to landfill revenue following removal of the Carbon Tax
     o    Reduction to animal licencing revenue (original figures overstated)
     o    Additional revenue for planning applications
     o    Additional revenue for campgrounds due to increased patronage (partially offset
          by increased commission payable)
 Interest received
     o    Increase in forecast revenue due to higher levels of cash on hand
 Sales & other revenue
     o    Additional lease revenue following lease of Pelican Place
     o    Recovery of water charges from leased properties
 Grants and subsidies – operating
     o    Commonwealth financial assistance grant significantly less than originally
          forecast due to revised funding allocation methodology
 Contributions and donations
     o    Contribution from developer for revegetation offset under State legislation

Operating Expenditure
 Employee benefits
     o    Additional costs associated with systematic animal inspection program
     o    Salary savings due to transition to permanent organisational structure and review
          of position descriptions
     o    Increase in casual staffing for customer service area to maintain required levels
          of service
     o    Reduction in budget for salary point progression
     o    Employment of in-house electrician (fully funded from anticipated savings in
          contractor payments)
 Materials and Services
     o    Contribution towards Cooran sports facility lighting
     o    Removal of Carbon Tax liability (payment of funds collected)
     o    Contribution for Noosa River environmental protection
     o    Re-branding for Noosa Community Care (funded from reserves)
     o    Legal costs budget increased for planning appeals
     o    Fleet operational costs reduced following restructure of light vehicle fleet
     o    Water charges payable not included in original budgets
 Depreciation and amortisation
     o    Reduction in depreciation following the revaluation (decrement in asset values)
          for significant asset classes; with a corresponding decrease in the capital works
          program for renewal and refurbishment.

2.   Capital Budget Adjustments

There have been a number of changes to the capital program following completion of some
projects, additional State Government funding received, revised delivery options and
emergent works required.


                                                                                Page 81 of 147

Section 82

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                   3 MARCH 2015


Details of the proposed changes to the capital program are outlined in the attached
schedule.

The proposals include a net reduction to the renewals program of $1,602,466; including the
$1,444,310 offset to depreciation, and deferral of a range of projects that could not be
commenced within the current year. The Upgrade program has been increased by
$1,150,696 (offset by State grants of $160,000) to accommodate new projects and the initial
design stage for works to be included in future year programs.

Previous Council Consideration

Nil

Finance & Risk

The underlying imperative for this review was that there should be no degradation of the
budgeted operating result and sustainability ratios, including consideration of funding for the
capital works program and the ability to deliver projects in a timely manner.

Consultation

External Consultation - Community & Stakeholder

Nil

Internal Consultation

All business areas within Council have been consulted in compiling the proposed changes.

Departments/Sections Consulted:

x     Community Services                     x   Planning & Infrastructure
      Disaster Management & Public Order         Building & Plumbing Services
      Waste & Environmental Health               DA Planning
      Community Facilities                       Strategic Land Use Planning
      Cultural Facilities                        Asset Design & Investigations
                                                 Asset Planning
                                                 Civil Operations
                                                 Environment

x     Executive Office                       x   Corporate Services
      Community Engagement                       Finance
      Customer Service                           ICT
      Executive Support                          Procurement & Fleet
      Governance                                 Property & Facilities
      Human Resources                            Revenue Services




                                                                                   Page 82 of 147

Section 83

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 83 of 147

Budget Review 3 - Summary of Requests by Department
                      Capital
Proposed Variance
Renewal/Upgrade       ae                                   Cost Centre/Project                                              Pes                                                   eyes           inoue        Grand Total
  Bara                 Bridges                               Girraween Bridget Joint Replacement                           Girraween Bridge Joint Replacement - Renewal              $50,000                        $50,000
                      Bridges Total                                                                                                                                                 $50,000                        $50,000
                        Coastal Canals and Waterways         Munna Point Foreshore Stabilisation                           Additional Geofabric Groyne - Increase                    $45,000                        $45,000
                                                             Sunshine Beach - beach access 35                              Sunshine Beach - beach access 35 - Completed             -$29,304                       -$29,304
                                                              Teewah Beach - southern dunal restore                        Teewah Beach - southern dunal restore - Completed         -$5,344                        -$5,344
                      Coastal Canals and Waterways Total                                                                                                                             $10,353                       $10,353
                         Community Facilities                 NAC learn to swim pool — replacement pool cover              NAC learn to swim pool — replacement pool cover -         $18,000                        $18,000
                                                                                                                           Renewal
                                                              Noosa Aquatic Centre - pool cleaner                          Noosa Aquatic Centre - pool cleaner - Completed                $o                             so
                                                              Noosa Aquatic Centre 50m Pool Blanket Winch                  Noosa Aquatic Centre 50m Pool Blanket Winch -              $1,747                         $1,747
                                                                                                                           Completed
                                                              Noosa Leisure Centre - concertina door                       Noosa Leisure Centre - concertina door - Completed       -$25,000                       -$25,000
                                                              Noosa Leisure Centre — design and detail                     Noosa Leisure Centre — design and detail - Offset              $o                             so
                                                             Noosa Leisure Centre -upstairs flooring                       Noosa Leisure Centre -upstairs flooring - Offset         -$60,000                       -$60,000
                                                              Noosa River Holiday Pk- Internal refurb                      Noosa River Holiday Pk- Internal refurb - Deferred       -$60,000                       -$60,000
                                                              Sunshine Beach Skate Park - block wall                       Sunshine Beach Skate Park - block wall - Completed         $3,999                         $3,999
                                                             Tewantin Spray Park Shade Sail                                Tewantin Spray Park Shade Sail - Completed                 $1,210                         $1,210
                                                              Whole of Shire - community light poles                       Whole of Shire - community light poles - Reduction       -$80,000                       -$80,000
                      Community Facilities Total                                                                                                                                   -$200,044                      -$200,044
                         Environmental Assets                 Cudgerie - Cedar Gully Pk water feature                      Cudgerie - Cedar Gully Pk water feature - Completed       $27,332                        $27,332
                      Environmental Assets Total                                                                                                                                    $27,332                        $27,332
                         Holiday Parks                        Boreen Point Campground - wastewater                         Boreen Point Campground - wastewater - Completed           $4,201                         $4,201
                                                              Boreen Point Tennis Courts Renewal Stage |                   Boreen Point Tennis Courts Renewal Stage | -             -$20,166                       -$20,166
                                                                                                                           Deferred
                                                             RV Stopover Cooroy                                            RV Stopover Cooroy - New                                  $45,000                        $45,000
                      Holiday Parks Total                                                                                                                                           $29,036                        $29,036
                         Information Technology               Whole of Shire - corporate website                           Whole of Shire - corporate website - No Budget          -$112,760                      -$112,760
                                                                                                                           Required
                      Information Technology Total                                                                                                                                 -$112,760                      -$112,760
                         Parks & Playgrounds                  Peregian Beach - Victory Park table                          Peregian Beach - Victory Park table - Completed             -$300                          -$300

                                                                                                                                        Page 83 of 147

Section 84

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 84 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                                         3 MARCH 2015

     Budget Review 3 - Summary of Requests by Department
                            Capital
     Proposed Variance
     Renewal/Upgrade        Program                              Cost Centre/Project                                             pelt                                                  Expense        iter          Grand Total
                              Parks & Playgrounds                   Peregian Beach Pk - 3 phase switchboard                      Peregian Beach Pk - 3 phase switchboard - Completed         -$367                          -$367
                                                                   Tewantin - Martin Park skate facility                         Tewantin - Martin Park skate facility - Completed          $5,334                        $5,334
                                                                   Whole of Shire - BBQ renewal                                  Whole of Shire - BBQ renewal - Completed                  -$4,953                        -$4,953
                                                                   Whole of Shire - park shelters                                Whole of Shire - park shelters - Completed                -$2,369                        -$2,369
                            Parks & Playgrounds Total                                                                                                                                      $2,656                         -$2,656
                              Pathways & Enabling Facilities        Pomona School Road ( Pomona State School ) footpath renewal  Pomona School Road ( Pomona State School )                $80,000                       $80,000
                                                                                                                                 footpath renewal - Emergent Project
                            Pathways & Enabling Facilities Total                                                                                                                          $80,000                        $80,000
                              Public Transport                     New Noosa Bus Shelters - Design                               New Noosa Bus Shelters - Design - Increase                $10,000                        $10,000
                          Public Transport Total                                                                                                                                           $10,000                       $10,000
                              Sealed Roads                          Emergent all infrastructure renewal                          Reduce unallocated portion of funding for emergent       -$98,000                       -$98,000
                                                                                                                                 projects
                                                                                                                                 Reduce unallocated portion of funding due to          -$1,444,310                    -$1,444,310
                                                                                                                                 reduction in depreciation charge
                                                                    Noosa Heads - Noosa Parade Master Plan                       Noosa Heads - Noosa Parade Master Plan - Deferred       -$100,000                      -$100,000
                           Sealed Roads Total                                                                                                                                         -$1,642,310                     -$1,642,310
                              Sports Grounds and Facilities         Girraween Sports Ground irrigation                           Girraween Sports Ground irrigation - Completed             $1,583                        $1,583
                           Sports Grounds and Facilities Total                                                                                                                              $1,583                        $1,583
                              Stormwater Drainage                   Marcus Beach Tristania Drive Stormwater Pipe Renewal         Marcus Beach Tristania Drive Stormwater Pipe              $18,000                       $18,000
                                                                                                                                 Renewal - Emergent Project
                           Stormwater Drainage Total                                                                                                                                       $18,000                       $18,000
                              Transport and Infrastructure          Whole of Shire - Road Directional Signs                      Whole of Shire - Road Directional Signs - Deferred       -$40,000                       -$40,000
                           Transport and Infrastructure Total                                                                                                                             -$40,000                       -$40,000
                              Fleet                                Fleet Plant and Workshop Operations                           Sale of assets below anticipated amounts                                $109,000       $109,000
                          Fleet Total                                                                                                                                                                    $109,000       $109,000
        Upgrade               Coastal Canals and Waterways          Noosa Waters revetment walls - Stage 2a                      Noosa Waters revetment walls - Stage 2a -                    -$90                           -$90
                                                                                                                                 Completed
                           Coastal Canals and Waterways Total                                                                                                                                -$90                           -$90
                              Commercial Land                       Peregian Beach Land Acquistion                               Peregian Beach Land Acquistion Stamp Duty -               $38,771                        $38,771
                                                                                                                                 Increase
                                                                   Rufus Street Precinct Design                                  Rufus Street Precinct Design - New                       $130,000                      $130,000
                           Commercial Land Total                                                                                                                                          $168,771                      $168,771
                              Community Facilities                  Bicentennial Community Hall - additional school toilet (purchase le Bicentennial Community Hall - additional school toilet $24,000                   $24,000
                                                                                                                                 (purchase leased facility) - New

                                                                                                                                          Page 84 of 147

Section 85

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 85 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                                         3 MARCH 2015

     Budget Review 3 - Summary of Requests by Department
                           Capital
     Proposed Variance
     Renewal/Upgrade       Program                              Cost Centre/Project                                            PCE                                                  flats          Revenue       Grand Total
       LU} sy-arevelc)        Community Facilities                Cooroy butter Factory - condition assess                     Cooroy butter Factory - condition assess - deferral -    -$5,000                       -$5,000
                                                                                                                               Deferred
                                                                  Lifeguards Storage Shed                                      Lifeguards Storage Shed - No Budget Required            -$10,000                      -$10,000
                                                                                                                               Lifeguards Storage Shed - To Operating                   $10,000                       $10,000
                                                                  Noosa Regional Gallery Access                                Noosa Regional Gallery Access - Deferred                  $3,460                        $3,460
                                                                  Noosaville Leisure Centre Reception - Construction ($10k from des Noosaville Leisure Centre Reception - Construction
                                                                                                                               ($10k from design project & $60k additional) - New
                           Community Facilities Total                                                                                                                                  $22,460                        $22,460
                              Pathways & Enabling Facilities      Noosaville State School Precinct Pathways - TIDS funding 50/50 —_ Noosaville State School Precinct Pathways - TIDS    $85,000       -$42,500        $42,500
                                                                                                                               funding 50/50 - New
                                                                  Sunshine Beach State School Precinct Pathways - TIDS funding 50/! Sunshine Beach State School Precinct Pathways - TIDS $25,000      -$12,500        $12,500
                                                                                                                               funding 50/50 - New
                                                                  Sunshine Beach State School Safety Improvements2             Sunshine Beach State School Safety Improvements2 -       -$1,313                       -$1,313
                                                                                                                               Completed
                                                                  Tewantin State School Precinct Pathways - TIDS funding 50/50 Tewantin State School Precinct Pathways - TIDS          $210,000      -$105,000       $105,000
                                                                                                                               funding 50/50 - New
                           Pathways & Enabling Facilities Total                                                                                                                        $318,687     -$160,000        $158,687
                             Planning Scheme                      Economic Promotion & Industry Assistance                     Economic Study - New                                     $50,000                       $50,000
                           Planning Scheme Total                                                                                                                                       $50,000                        $50,000
                              Sealed Roads                        Dr Pages - Kinmond Creek Road Initial planning & design      Dr Pages - Kinmond Creek Road Initial planning &        $150,000                      $150,000
                                                                                                                               design - New
                                                                  Tewantin Cooroy Noosa Rd Stages 2-6 Design Only              Tewantin Cooroy Noosa Road Stages 2-6 Design Only -     $150,000                      $150,000
                                                                                                                               New
                           Sealed Roads Total                                                                                                                                          $300,000                      $300,000
                              Stormwater Drainage                 Seaview Ck - open drain civil works                          Seaview Ck - open drain civil works - Completed          -$3,067                       -$3,067
                           Stormwater Drainage Total                                                                                                                                   -$3,067                        -$3,067
                              Transport and Infrastructure        Eenie Creek Road / Langura Street Intersection safety upgrad Eenie Creek Road / Langura Street Intersection safety        -$0                           -$0
                                                                                                                               upgrad - Completed
                           Transport and Infrastructure Total                                                                                                                               -$0                           -$0
                              Waste-Waste Management              Noosaville Landfill                                          Noosaville Landfill Bio Basin Construction savings.     -$43,823                      -$43,823
                                                                                                                               Noosaville Landfill Sediment Control Additional         $217,758                      $217,758
                                                                                                                               Expense.
                                                                                                                               Noosaville Landfill Sediment Control Dosing and         $120,000                      $120,000
                                                                                                                               Montitoring Equipment Additional Expense.
                           Waste-Waste Management Total                                                                                                                                $293,935                      $293,935

                                                                                                                                          Page 85 of 147

Section 86

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 86 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                  3 MARCH 2015

    Budget Review 3 - Summary of Requests by Department
                      Capital

    Renewal/Upgrade   Program                       Cost Centre/Project                                 preter b                                   12.1: T ae   Revenue    Grand Total
    Grand Total                                                                                                                                      -$620,770     -$51,000   -$671,770

                                                                                                                  Page 86 of 147

Section 87

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 87 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                             3 MARCH 2015

      Budget Review 3 - Summary of Requests by Department
      Capital / Operating             Operating
      Se eel eR ray                                                                                                                                                                              Revenue / Expense
      Department                     leet      ec iaee) sat                                            Details                                                                                           eel tani-d              teva}           Grand Total
                                        Animal Control                                                                                                                                                         $130,000                 $58,131     $188,131
                                                                                                                                                                                                               $120,000                             $120,000
                                                                                                        Cost associated with systematic inspection program - to engage contract/agency staff
                                                                                                        Original budget of $420k overstated incorrect volume data used. Adjustment to revenue based                                     $58,131      $58,131
                                                                                                        on forecast - forecast registrations $197k, new registrations $15k, systematic inspections
                                                                                                        $150k
                                                                                                        Computershare - animal renewal notices postage, printing and inserts in rates notice not                $10,000                              $10,000
                                                                                                        included in original budget
                                        Community , Culture and Sport                                                                                                                                           $30,000                              $30,000
                                                                                                                                                                                                                $30,000                              $30,000
                                                                                                        Additional funding Council Contribution towards lighting upgrade Cooran Sports Facilty
                                                                                                        Savings resulting from FT Project officer filled PT                                                      -$8,063                              -$8,063
                                                                                                        Social Plan data - Noosa Shire Community Profile - AEC consulting costs shared with Strategic            $8,063                                $8,063
                                                                                                        Land Use Planning
                                        Community Culture and Sport                                                                                                                                                  $0                                    $0
                                                                                                        Contribution to Pomona Community House (sale proceeds offset written down book value)                        $o                                    0)
                                                                                                        budget savings in employee costs offset
                                        Library Program / “Dollars Making Sense" FINLIT Grant                                                                                                                                           -$16,667     -$16,667
                                                                                                        New grant - Financial Literacy Australia $46k over three years                                                                  -$16,667     -$16,667
                                        Library Program / "Noosa's War Front" QAC Grant                                                                                                                          $5,800                 -$10,861      -$5,061
                                                                                                        New grant - Queensland Anzac Centenary Grants Program - Noosa War Front project $14,481                  $5,800                                $5,800
                                                                                                        expense 2014/15 40% then 2015/16 60%
                                                                                                        New grant - Queensland Anzac Centenary Grants Program - Noosa War Front project $14,481                                         -$10,861     -$10,861
                                                                                                        revenue 75 % 2014/15 then 25% 2015/16
                                        Lifeguard Services                                                                                                                                                      $10,000                              $10,000
                                                                                                        Capital to operating reclassification - Originally 10K capital towards design & approvals for           $10,000                              $10,000
                                                                                                        lifeguard storage shed with construction funded ($65k) by SLSQ. Shed won't be a Council asset
                                                                                                        so now the 10K needs to be operational funding
                                        Management Community Facilities                                                                                                                                        -$10,000                              -$10,000
                                                                                                        Revenue & expense offset - Venue Hire budget was challenging when developed and will not                 -$5,000                              -$5,000
                                                                                                        be achieved - indirect savings identified to offset
                                                                                                        Revenue & expense offset - Venue Hire budget was challenging when developed and will not                 -$5,000                              -$5,000
                                                                                                        be achieved - savings identified to offset
                                        Noosa Aquatic Centre                                                                                                                                                         so                                    so
                                                                                                                                                                                                                     so                                    so
                                                                                                        Expense reclassification - Fitness Instrutors are enagaged as either contractor or casual staff.
                                                                                                        Trend this year for more casual staff than contractors hence the change
                                        Noosa Community Care Projects - Rebranding and Planning                                                                                                                 $50,000                              $50,000
                                                                                                                                                                                                                $50,000                              $50,000
                                                                                                        Transfer from Noosa Community Care Reserves for rebranding, business and marketing
                                                                                                        planning as per NCC Quarterly Report (I&SC Meeting 11 November 2014).
                                        Noosa Leisure Centre                                                                                                                                                     -$6,000                 $6,000            so
                                                                                                                                                                                                                                         $6,000        $6,000
                                                                                                        Revenue & expense offset - Café Sales budget challenging and will not be achieved

                                                                                                                                                              Page 87 of 147

Section 88

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 88 of 147

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                                                                                               3 MARCH 2015

      Budget Review 3 - Summary of Requests by Department
      Capital / Operating            Operating
      Sum of Proposed Variance                                                                                                                                                                LCT Wels)
      Pes ecu s9                      Cost Centre/Project                                             Details                                                                                          Tees                  ieee             Grand Total
                                                                                                      Revenue & expense offset - Café Sales budget challenging and will not be achieved, therefore            -$6,000                             -$6,000
         Community Services              Noosa Leisure Centre                                         COGS expense is also being adjusted accordingly
                                      Parking                                                                                                                                                                                      -$188,131    -$188,131
                                                                                                      Increased revenue forecast offsets changes in animal revenue and expense                                                     -$188,131    -$188,131
                                        Public Health                                                                                                                                                        $20,000                -$20,000           $o
                                                                                                      Increase casual budget to cover ytd overspend from extended staff leave                                $20,000                              $20,000
                                                                                                      Increase revenue based on YTD actuals trend                                                                                   -$20,000     -$20,000
                                       The J                                                                                                                                                                -$10,000                 $20,000      $10,000
                                                                                                      Revenue & expense offset - Venue Hire budget was challenging when developed and will not               -$10,000                            -$10,000
                                                                                                      be achieved - indirect savings identified to offset
                                                                                                      Revenue & expense offset - Venue Hire budget was challenging when developed and will not                                       $20,000      $20,000
                                                                                                      be achieved.
                                        Bicentennial Community Centre                                                                                                                                       -$10,000                             -$10,000
                                                                                                      Revenue & expense offset - Venue Hire budget was challenging when developed and will not              -$10,000                             -$10,000
                                                                                                      be achieved - indirect savings identified to offset
                                       Waste Collection                                                                                                                                                                             $149,851     $149,851
                                                                                                      Revenue reduced to recognise Council Owned Property Offset Waste Collection                                                   $149,851     $149,851
                                       Waste Holding Tanks                                                                                                                                                                           $13,221      $13,221
                                                                                                      Revenue reduced to recongnise Council Owned Property Offset Liquid Waste                                                       $13,221      $13,221
                                        Noosaville Landfill Eumundi Road                                                                                                                                   -$334,000                 $70,000    _-$264,000
                                                                                                      Landfill Cost Reduction Carbon Tax Removal                                                           -$334,000                            -$334,000
                                                                                                      Landfill Fee Loss Due to Carbon Tax Removal                                                                                    $70,000      $70,000
                                       Community Facilities                                                                                                                                                 -$31,255                             -$31,255
                                                                                                                                                                                                             -$31,255                            -$31,255
                                                                                                      Operational responsibiility for Tewantin Splash Park moved to Parks from Buildings
                                       Community Land Use Permits                                                                                                                                             $2,140                               $2,140
                                                                                                      Higher Duties for backfill position during period of extended leave                                     $2,140                               $2,140
                                       Community Properties                                                                                                                                                 $100,000                -$46,000      $54,000
                                                                                                      Water charges not budgeted for, partly recovered                                                      $100,000                -$46,000      $54,000
                                       Council Buildings and Facilities                                                                                                                                          $0                                    $0
                                                                                                      Water & Sewerage adjustments for Public Amenities and Parks - nil overall impact                            $o                                   $o
                                       Council Lease Management                                                                                                                                              $12,753                              $12,753
                                                                                                      Backfill operational position during period of extended leave                                          $12,753                              $12,753
                                        Financial and Accounting Services                                                                                                                                                          -$240,000    -$240,000
                                                                                                      Additional Interest Revenue                                                                                                  $240,000 — -$240,000
                                        Fleet Plant and Workshop Operations                                                                                                                                -$109,000                            -$109,000
                                                                                                      12 SES Trailer received by fleet to maintain and upgrade.                                               $6,000                               $6,000
                                                                                                      Tyres budget estimate allowed for 2 changes of tyres with only 1 required                             -$75,000                             -$75,000
                                                                                                      Leased vehicles have been returned                                                                    -$40,000                             -$40,000
                                        Pelican Place Lease                                                                                                                                                                         -$18,182     -$18,182
                                                                                                      Pelican Place new lease                                                                                                      -$18,182      -$18,182
                                        Public Amenities                                                                                                                                                                             $15,000      $15,000
                                                                                                      Septic Pump out charges initially budgeted for recovery can not be oncharged to property                                       $15,000      $15,000
                                                                                                      owners

                                                                                                                                                                Page 88 of 147

The text continues on section 89.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.