Original source · versioned page text
2015-03-03 Planning & Organisation Agenda
The original of this document is very large (18.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 3 MARCH 2015 RECOMMENDATION That Council note the report by the Development Planner to the Planning & Organisation Committee Meeting dated 3 March 2015 regarding Application No. MCU14/0103 for a Development Permit for Material Change of Use for a Detached House situated at 146 Solar Road, Cooroy Mountain and A. Approve the application in accordance with the following conditions: When Conditions must be Complied With 1. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Approved Plans 2. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date A101 L Cover Sheet prepared by Southern Cross 26/11/2014 Design & Drafting A102 L Site Plan prepared by Southern Cross Design 26/11/2014 & Drafting A104 L Ground Floor Plan prepared by Southern 26/11/2014 Cross Design & Drafting A105 L Elevations prepared by Southern Cross 26/11/2014 Design & Drafting Landscaping 3. Existing trees on the site and within road reserves must be retained, except where required to be removed to accommodate the approved dwelling. In this regard, the removal of native vegetation must not extend beyond the approved building footprint. Other 4. Earthworks required on site must be carried out in accordance with Council’s Planning Scheme Policy PSP5 Engineering Design Standards, so as not to cause the additional ponding of water on any adjoining lands or concentrate or direct overland flow on to an adjoining property. 5. The approved dwelling must be serviced with a rainwater tank having a minimum storage capacity of no less than 60,000 litres. 6. External colours and finishes of the building must comprise muted/environmental tones that blend with the natural environment. B. Find the following are sufficient grounds to justify the decision despite the conflict with the Planning Scheme: 1. The proposed development is appropriately sited, will not require the removal of any existing vegetation within the Open Space Conservation zone, and is within an existing disturbed part of the site. 2. The proposed house does not conflict with any of the values intended to be protected by the Open Space Conservation zone and will not adversely impact on the Mount Cooroy Conservation Park. Page 12 of 147
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.