Original source · versioned page text
2015-03-03 Planning & Organisation Agenda
The original of this document is very large (18.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 3 MARCH 2015
Page 62 of 147
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 3 MARCH 2015
SCHEDULE 2
Special Conditions
1. A Development Permit for Operational Works for park landscaping and
embellishment infrastructure is to be issued prior to commencing construction;
2. Park and Park Embellishment Infrastructure to be provided
Park Embellishment Infrastructure are to be provided by the Applicant/owner as
follows:
a. generally in accordance with plans prepared by Play Environment
Consulting contained in SCHEDULE 3 consisting of:
i. Concept Plan - drawing number 14/005-S01 dated 17.11.2014 as
annotated by Council;
ii. Concept Plan - drawing number 14/005-S02 dated 17.11.2014;
b. Table 1: Park Embellishment Details:
Minimum | Park
Quantity | Stage
Park Signage, In accordance with The Noosa Plan, Planning Scheme
Landscaping 1 A .
ee and Operational Works Approval
and Lighting
e Compacted fill in accordance with Australian Standards
to above Q100 flood level;
e Play equipment (or similar):
Activity Mound 1 A o Slide,
o Boulder Steps;
o Scramble wall;
o Tyre Steps;
o Rope walk
Raised 1 A e Compacted fill in accordance with Australian Standards
Meeting Point to above Q100 flood level
Water Suppl e 2x Water Connection Points with hose cock
Pply e 1x Drinking Fountain (water mark product with the
& Connection 3 A . . : .
Points waste to be discharged into a rubble pit designed by a
geotechnical engineer
Double Swing 1 A e To be constructed from hardwood timber with 4 metre x
3 metre rubber ware pad
e Landmark Pro - 402 Portland 4 x 4m shelter (Hard wood
or pine);
e Concrete slab to be 5 metres x 5 metres x 125mm
Park Shelter 1 A concrete slab broom finish;
e Structure colour to be Noosa Green;
e Roof to be Colorbond classic cream;
e One shelter to be located on the Raised Meeting Point.
Park Table e Page Furniture Seaside Range;
Setting e Aluminium Frames with timber or perforated aluminium
Park Bench table top and seating;
Seat 4 A e Concrete slab to suit.
e In accordance with Sunshine Coast Council Open
Rebound Wall 1 Space Landscape Infrastructure Manual (LIM) Sports
and Games
Basketball Half 1 In accordance with Sunshine Coast Council Open Space
Court Landscape Infrastructure Manual (LIM) Sports and Games
15 of 20
Page 62 of 147See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.