2015-03-03 Planning & Organisation Agenda

of 147

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.2 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   3 MARCH 2015




                                                   Page 83 of 147

Budget Review 3 - Summary of Requests by Department
                      Capital
Proposed Variance
Renewal/Upgrade       ae                                   Cost Centre/Project                                              Pes                                                   eyes           inoue        Grand Total
  Bara                 Bridges                               Girraween Bridget Joint Replacement                           Girraween Bridge Joint Replacement - Renewal              $50,000                        $50,000
                      Bridges Total                                                                                                                                                 $50,000                        $50,000
                        Coastal Canals and Waterways         Munna Point Foreshore Stabilisation                           Additional Geofabric Groyne - Increase                    $45,000                        $45,000
                                                             Sunshine Beach - beach access 35                              Sunshine Beach - beach access 35 - Completed             -$29,304                       -$29,304
                                                              Teewah Beach - southern dunal restore                        Teewah Beach - southern dunal restore - Completed         -$5,344                        -$5,344
                      Coastal Canals and Waterways Total                                                                                                                             $10,353                       $10,353
                         Community Facilities                 NAC learn to swim pool — replacement pool cover              NAC learn to swim pool — replacement pool cover -         $18,000                        $18,000
                                                                                                                           Renewal
                                                              Noosa Aquatic Centre - pool cleaner                          Noosa Aquatic Centre - pool cleaner - Completed                $o                             so
                                                              Noosa Aquatic Centre 50m Pool Blanket Winch                  Noosa Aquatic Centre 50m Pool Blanket Winch -              $1,747                         $1,747
                                                                                                                           Completed
                                                              Noosa Leisure Centre - concertina door                       Noosa Leisure Centre - concertina door - Completed       -$25,000                       -$25,000
                                                              Noosa Leisure Centre — design and detail                     Noosa Leisure Centre — design and detail - Offset              $o                             so
                                                             Noosa Leisure Centre -upstairs flooring                       Noosa Leisure Centre -upstairs flooring - Offset         -$60,000                       -$60,000
                                                              Noosa River Holiday Pk- Internal refurb                      Noosa River Holiday Pk- Internal refurb - Deferred       -$60,000                       -$60,000
                                                              Sunshine Beach Skate Park - block wall                       Sunshine Beach Skate Park - block wall - Completed         $3,999                         $3,999
                                                             Tewantin Spray Park Shade Sail                                Tewantin Spray Park Shade Sail - Completed                 $1,210                         $1,210
                                                              Whole of Shire - community light poles                       Whole of Shire - community light poles - Reduction       -$80,000                       -$80,000
                      Community Facilities Total                                                                                                                                   -$200,044                      -$200,044
                         Environmental Assets                 Cudgerie - Cedar Gully Pk water feature                      Cudgerie - Cedar Gully Pk water feature - Completed       $27,332                        $27,332
                      Environmental Assets Total                                                                                                                                    $27,332                        $27,332
                         Holiday Parks                        Boreen Point Campground - wastewater                         Boreen Point Campground - wastewater - Completed           $4,201                         $4,201
                                                              Boreen Point Tennis Courts Renewal Stage |                   Boreen Point Tennis Courts Renewal Stage | -             -$20,166                       -$20,166
                                                                                                                           Deferred
                                                             RV Stopover Cooroy                                            RV Stopover Cooroy - New                                  $45,000                        $45,000
                      Holiday Parks Total                                                                                                                                           $29,036                        $29,036
                         Information Technology               Whole of Shire - corporate website                           Whole of Shire - corporate website - No Budget          -$112,760                      -$112,760
                                                                                                                           Required
                      Information Technology Total                                                                                                                                 -$112,760                      -$112,760
                         Parks & Playgrounds                  Peregian Beach - Victory Park table                          Peregian Beach - Victory Park table - Completed             -$300                          -$300

                                                                                                                                        Page 83 of 147
Log in to download the original file

2015-03-03 Planning & Organisation Agenda(PDF, 17MB).pdf · 18.2 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.