Assessment of Request
Agree
The applicant requests to add additional conditions relating to the demolition works required for
the removal of the dwelling house and any associated structures existing on site. Correspondence
has confirmed that the original approval intended to include such conditions however were
excluded due to an administrative error. The applicant does not propose any additional changes
to the approval.
Recommendation
It is recommended additional conditions be added to read as follows:
DEMOLITION WORKS
Codes of Development
39. (a) Unless specifically conditioned otherwise, all works must comply with the relevant
acceptable solutions as contained in the Waste Management Code and Water Quality
and Drainage Code of the Noosa Plan 2020.
Works
39. (b) Demolition must be undertaken in a manner that causes no detrimental effect upon the
amenity of the neighbourhood by reason of the creation of excessive noise, lighting,
air-borne hazards, atmospheric pollutants (including dust or odours) nuisance or any
other emissions in accordance with the nuisance provisions of the Environmental
Protection Act 1994.
Waste Management
39. (c) Adequate area must be provided on-site for the collection and separate storage of
recyclable, non-recyclable, vegetative and hazardous materials in their specific waste
streams during removal or demolition works.
39. (d) All waste materials must be removed from the site to avoid causing unhealthy
conditions, with the site left clean, tidy and free from any debris.
39. (e) Where a development permit has not been issued for the future use of the site, hard
surfaced areas including concrete slabs must be removed and disturbed areas must
be revegetated in accordance with PSP2 Landscaping of the Noosa Plan 2020.
Alternatively, the site must be turfed within 20 business days of completing the removal
or demolition work.
Health and Safety
39. (f) All building materials containing asbestos, including asbestos cement sheeting or
roofing and lagging, are removed from the building prior to demolition or relocation.
39. (g) Removal of building materials containing asbestos must be undertaken by a licensed
asbestos removalist.
39. (h) Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
requires a licensed asbestos removalist to give notice to Workplace Health and Safety
Queensland (WHSQ) of licensed asbestos removal work at least five days before the
work commences. Notification must be made using Form 65: Notification of licensed
asbestos removal work, demolition work or emergency demolition.
39. (i) All building materials containing asbestos products are wrapped and disposed of in
accordance with the Public Health Regulation 2006 and the Environmental Protection
Page 4 of 7
Document Set ID: 24145124
Version: 4, Version Date: 29/10/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Report MCU23 0109 01, OPW23 0123.01 & RAL23 0017.01 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.2 MB (small file)
- File type
No other editions are linked here.