DELEGATED AUTHORITY REPORT
development. Furthermore, the number of people who can stay at the development is not
proposed to increase.
The change of use does justify consideration of how the flood hazard and coastal hazard on the
site will affect the use. The lower levels of the main building are slightly below the current 100 year
ARI flood level, while the upper floor rooms are above the Predicted Maximum Flood (PMF). If the
structure of the main dwelling is sufficient to withstand hydrostatic and debris forces during a PMF
event then this may be a suitable flood refuge.
A Flood Emergency Management Plan has been submitted showing how a flood hazard is
proposed to be managed. The Flood Emergency Management Plan identifies a number of critical
issues, including that when the first warning of 1m at Tewantin is issued, the Makepeace Island
Jetty will be inaccessible, therefore making flood free access to the jetty and mooring areas
hazardous and potentially putting lives in danger. Therefore, the emergency procedures for the
island cannot be dependent solely on the system provided by the Queensland Flood Warning
Network. As a result, it is recommended that Makepeace Island implement its own independent
alert system.
CONSULTATION
IDAS Referral Agencies
Nil
Other Referrals
The application was forwarded to the following internal council specialists:
e Development Engineer, Engineering and Environment Assessment Branch
e Environment Officer, Engineering and Environment Assessment Branch
e Ecology Specialist, Engineering and Environment Assessment Branch
° Plumbing Specialist, Plumbing Services Branch
e Senior Strategic Planner, Strategic Land Use Planning Branch
Their assessment forms part of this report.
Public Notification
The application was publicly notified for 15 days in accordance with the requirements of the
Sustainable Planning Act 2009. One (1) not properly made submission was received.
The following table provides a summary and assessment of the issues raised by submitters.
| ssues | Comments
- Makepeace Island is at times | The proposal has the potential to disrupt the
disrupting the residential amenity of | residential amenity of the neighbouring residential
the surrounding residents along Tait | houses located less than 200m away from the
Street and Cambridge Court. existing buildings on Makepeace _ Island.
Conditions are recommended to restrict noise
emissions to a more appropriate level in order to
enhance and protect the amenity of neighbouring
residents, including:
- Restricting noise levels to 5db above
FM1404/9-01/10/2013 Page 7
Page 54 of 231See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.