Skip to the record
Search everything, all in one place.

Original source · versioned page text

2014-03-25 Planning & Organisation Committee Agenda Pages 39-80

of 42

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA   25 MARCH 2014




                                                   Page 66 of 231

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                          25 MARCH 2014

           ()   Areference to an item is a reference to an item in Schedule 1.
           (m) Where this Agreement refers to 2 particular officer or job title within
                the Council (for example the Manager of Land Usa), and the title or
                duties of that officer change from the date hereof, the reference to the
                particular officer will be deemed to be a reference to the officer who
                holds the relevant duties from time to time,

           “Act” means the Integrated Planning Act 1997 and includes the Local
           Govemment (Planning and Environment) Act 1990         and the Local
           Govemment (Planning & Environment) Regulation 1991 to the extent that
           they are relevant to the Development Application by operation of the
           Integrated Planning Act 1997 or the Acts Interpretation Act 1954.
           “Agroement” means this Infrastructure Agreement.
           “Appeal” means an appeal to the Court under the Act.
           “Approved Plans " means all of the plans annexed to this Agreement,
i
           (a)  Architectural Drawings propared by ETS group {Annexure 1) and
                entitled—
                (i)  AO1 RevC Site Plan deted April 2007;
                (i)  AO2 Rev C Setout Plan (Proposed Main Building) dated April
                     2007;
    .           (iii) AO3 Rev C Main Building Setout Plan — Ground Floor dated
                 -   April 2007; '
                (iv) AO4 Rev C Main Building Setout Plan — Upper Floor Plan dated
                     April 2007;
                (v)  Utility Building Plan dated 15 February 2007; and
                (vi) Preliminary Floor Plan (Bedroom Wing) submitted to the Council
                     on 24 July 2007.
           (0)  Survey Plans: Survey Plans showing 0.85m Contour Plan No.
                HO60602B prepared by Hass Survey dated 2 October 2006
                (Annexure 2).
           “Approved Reports” means all of the reports annexed to this Agreement;   .
           being: -
           (a)  Effluent Disposal System: Site and Soil Evaluation Report for
                Proposed    On-Site   Wastewater    Treatment    System   (FPE
     Makepeace Island Infrastructure Agreemant                      Page 3 of 18

                                                                           Page 66 of 231
Log in to download the original file

2014-03-25 Planning & Organisation Committee Agenda Pages 39-80(PDF, 6MB).pdf · 6.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.