Original source · versioned page text
2014-03-25 Planning & Organisation Committee Agenda Pages 39-80
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 25 MARCH 2014
Page 80 of 231
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 25 MARCH 2014
| Regional Council PLANNING ASSESSMENT BRANCH
APPLICATION NO: MCU13/0064
AUTHOR: JACK LEWIS
PROJECT DIRECTOR: DENIS WALLACE
TO BE COMPLETED BY PROJECT MANAGER / REPORT AUTHOR:
« Is referral required to the Councillor Delegated Sign Off Mailbox? YES
= Has a site inspection been undertaken? YES
= Has an email request for Infrastructure Contributions calculation YES
been sent to the Infrastructure Contribution Team?
* Is an Adopted Infrastructure Contribution Applicable? YES
Material to give to the Project Director
Qo A copy of any previous edited version of the report
Qo Plans and documents recommended to become Approved Plans and Documents
Qo Location plan / aerial photographs at appropriate scales
oO Site photos (where obtained)
a= 2
PROJECT MANAGER Cc , PROJECT DIRECTOR
Signature: <P Signature: em e | Le
Position: Development Planner Position: Coordinator Planning Applications North
Date:19 November 2013 Date:19 November 2013
TO BE COMPLETED BY PROJECT DIRECTOR:
(Note: to be signed after the Councillor Delegated Sign Off referral process is completed (where applicable))
| exercise delegation in accordance with the delegations adopted by Council on 12 December
2009: K - L
g
Signature: - Date: 22 November 2013
PROJECT DIRECTOR
Page 80 of 231See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.