Decision Notice - Approved by Delegation of Authority DBW24 0090 · DBW24/0090

of 7

Text shows just the words. Original shows the document exactly as it was published.

                      Landscaping Works
               9.     A minimum of 20% of the site must be retained as soft landscaping.
               10.    Existing trees on the site must be retained, except where required to be removed to
                      accommodate the approved dwelling. In this regard, the removal of vegetation must not
                      extend beyond works shown on the approved plans.
               11.    Existing vegetation in the road reserve must be retained, unless written authorisation from
                      Council is granted for the clearing.
               12.    Trees to be retained must be protected from clearing or construction activities by:
                      a.      clearly marking vegetation to be retained with flagging tape
                      a.      installing protective fencing around the drip line of the vegetation
                      b.      restricting stockpiling, storage and vehicle parking to those areas which are already
                              cleared
                      c.      using low impact construction techniques around vegetation.
               13.    All landscape works must be established and maintained for the life of the development, and
                      in a manner that ensures healthy, sustained and vigorous plant growth. All plant material
                      must be allowed to grow to full form and be refurbished when its life expectancy is reached.
                      Earthworks
               14.    All earthworks and associated retaining structures/batters, both above and below ground,
                      both temporary and permanent, must be contained entirely within the subject site unless
                      written permission form the respective landowner(s) is provided to Council. All earthworks
                      must be undertaken in accordance with the provisions of Australian Standard AS3798:
                      Guidelines on Earthworks for Commercial and Residential Developments.
               15.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height.
                      All retaining walls that are publicly accessible and exceed 1.0m in height must be fitted with
                      a commercial grade safety fence.
                      Site Access and Driveways
               16.    A sealed access driveway must be provided from Attunga Heights to all parking and
                      manoeuvring areas of the development. The works must be undertaken in accordance with
                      an Operational Works approval, be generally in accordance with Alexjhobbs’ Site Plan
                      (AJH43_WD-B, Rev. B) and must include a driveway crossover in accordance Council’s
                      standard drawings (RS-049, RS-050 and any associated addendum).
                      Stormwater Drainage
               17.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge or be disposed of on-site without causing scour or damage to the subject site or
                      any adjoining properties.
                      Easements
               18.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               19.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               20.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.




                                                                                                       Page 3 of 7
Document Set ID: 23215511
Version: 3, Version Date: 29/08/2024

Used in these records

About this file

File size
154 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Approved by Delegation of Authority DBW24 0090.pdf · 154 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.