SUPERSEDED - Decision Notice MCU22/0082 OPW22/0134 [As Published]
18. Directional signage must be provided to direct visitors and customers to the car parking
spaces provided on site.
19. All car parking areas and access driveways must be maintained exclusively for vehicle
parking and manoeuvring and kept in a tidy and safe condition at all times.
Bicycle and End of Trip Facilities
20. Pedestrian and bicycle facilities must be provided for the development. The works must
include in particular:
a. a total of 7 bicycle parking spaces
end of trip facilities involving 4 lockers, 1 shower cubicle and change room.
Service Vehicles
21. Service vehicle parking, manoeuvring and standing spaces must be provided on the site.
The works must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. A single AV Tractor Trailer loading and unloading zone that is located adjacent to staff
parking as to not limit the functionality of the carpark
Stormwater Drainage
22. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken in accordance with the conditions of this Decision
Notice and QUDM, and must be generally in accordance with BAX Engineering’s Grading &
Drainage Layout Plan (228-001-300 Revision C) dated 12 July 2022.
23. The development must be provided with approved Permanent signage to educate the public
on the function of the bioretention basin. The wording for the signage for each bioretention
basin is to include: “BIORETENTION BASIN - This bioretention basin reduces the pollution
of our waterways by reducing the amount of heavy metals, litter, suspended solids, and
nutrients discharged to our waterways”.
Services
24. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
25. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
26. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
27. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
28. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
29. All fill and associated batters must be undertaken in accordance with the conditions of this
Decision Notice, and contained entirely within the subject site unless written permission from
the respective landowner(s) is provided to Council.
Page 4 of 14
Document Set ID: 22208842
Version: 4, Version Date: 14/12/2022