Original source · versioned page text
2503-45382 SRA - Documents referenced in conditions
Attached to the e-mail 2503-45382 SARA Response with Conditions.
Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.
STORMWATER MANAGEMENT PLAN
Client: Noosa Shire Council Location: Doonan
7.0 CONCLUSION
This SMP demonstrates the stormwater management strategies proposed for redevelopment of the Doonan
Landfill Resource Recovery at 561 Eumundi-Noosa Road, Doonan satisfy Noose Shire Council (NSC) and
Queensland State Planning Policy (SPP, 2017) requirements.
As described in Section 3.0, the change to the overall catchment peak flows within the overall catchment will
be negligible since the proposed development area is insignificant compared to the overall catchment area
discharging downstream. Further, the peak discharge of the proposed development will arrive at the outlet
well before the overall catchment peak discharge. Ultimately, this ensures no actionable nuisance to the
surrounding properties due to the proposed development and therefore no detention measures are required
for the site.
As described in Table 5-4, the stormwater treatment measures selected for the proposed development
achieve the performance criteria set by the NSC and by the SPP (2017). Annual load reductions of TSS, TP
and TN between the unmitigated and mitigated MUSIC model scenarios have been met or exceeded. It is
considered that a conservative approach has been taken as no routing in the drainage links has been adopted.
Sufficient consideration of stormwater controls has been demonstrated by:
Compliance with the requirements of the Noosa Shire Council’s Planning Scheme (2020);
Compliance with the State Planning Policy (2017); and
Compliance with QUDM (2017).
11 Project No: 244035
M25-0042 Rpt Issue A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.