Skip to the record
Accept no substitutions.

Original source · versioned page text

2503-45382 SRA - Documents referenced in conditions

Attached to the e-mail 2503-45382 SARA Response with Conditions.

of 21

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (15.7 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                    STORMWATER MANAGEMENT PLAN

Client: Noosa Shire Council                                               Location: Doonan

CONTENTS


1.0    INTRODUCTION                                                                      4

2.0    SITE DESCRIPTION                                                                  4

       2.1    Site Location                                                              4

       2.2    Existing Land-use, Topography and Drainage                                 5

       2.3    Proposed Land-use                                                          5


3.0    STORMWATER QUANTITY                                                               6

4.0    STORMWATER QUALITY                                                                7

       4.1    Water Quality Monitoring                                                   7
              4.1.1   Treatable Areas                                                    7
              4.1.2   Scenario Method                                                    7

       4.2    MUSIC Model Parameters                                                     8

       4.3    Proposed Stormwater Treatment Train                                        9

       4.4    MUSIC Modelling Results                                                    9


5.0    MAINTENANCE PERIOD                                                               10

       5.1    Bioretention Basins                                                       10
              5.1.1   ‘Construction Period’ Maintenance Requirements                    10
              5.1.2   ‘Maintenance Period’ Maintenance Requirements                     10
              5.1.3   ‘Operational Period’ Maintenance Requirements                     10


6.0    CONCLUSION                                                                       11

7.0    REFERENCES                                                                       12




                                                2                       Project No: 244035
                                                                       M25-0042 Rpt Issue A
Log in to download the original file

2503-45382 SRA - Documents referenced in conditions.pdf · 15.7 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.