STORMWATER MANAGEMENT PLAN
Client: Noosa Shire Council Location: Doonan
4.0 STORMWATER QUANTITY
Stormwater quantity management for the site ensures a “no-actionable nuisance” design for the proposed
development. Development of the site will result in an increase in impervious area and a corresponding
increase in peak stormwater runoff. However, as the proposed development area (2.24 ha) is much smaller
than the overall catchment (287 ha) the minor increase in the fraction impervious has a negligible effect on
the overall catchment peak discharges. As the proposed development has a fraction impervious higher than
the overall catchment and is located closer to the downstream boundary (outlet) the peak discharge will
arrive at the outlet much sooner than the overall catchment. Therefore, the increase in the peak discharge
for the overall catchment will be negligible. Further, stormwater detention is not required for the proposed
development.
Refer to Figure 4-1 for the overall stormwater catchment. Refer to the Flood Impact Assessment (Report No.
M25-0045Rpt Issue A) prepared by Covey Engineers for further details.
Figure 4-1 Overall Stormwater Catchment (extract from report no. M25-0045Rpt)
6 Project No: 244035
M25-0042 Rpt Issue A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.