Original source · versioned page text
Bushfire Hazard Assessment and Management Plan
Plans and drawings: the text below has words only, no drawings.
Performance outcomes Acceptable outcomes Comments
PO7 AO7 PO7
Lot design and building siting minimises bushfire hazard risk to people Each residential lot: No building envelopes or internal road networks are nominated at this
and property. stage of the application. As such, future internal road networks within
a. includes a building envelope, identified on a plan of subdivision;
the lot must provide a layout that is of sufficient size and shape to
b. is of sufficient size and shape to allow for efficient emergency allow for efficient emergency access to buildings for fire fighting
access to buildings for fire fighting appliances (e.g. by avoiding appliances to minimises bushfire hazard risk to people and property.
battle-axe/hatchet lots and long narrow lots with long access Additionally, mitigation measures within this report include the
driveways to buildings); nomination of required setbacks to achieve a BAL29 outcome for any
future dwellings. As such, the current application demonstrates
c. where more than 2500m2, achieves setbacks from hazardous compliance with PO7.
vegetation in line with Bushfire Attack Level 29 requirements as
per AS3959; and
d. is designed so that buildings and structures are sited in locations
of lowest hazard within the lot and elements of the development
least susceptible to fire are closest to the fire hazard.
Firebreaks and fire access tracks
PO8 AO8.1 Not Applicable
Firebreaks and fire access tracks provide: Where development involves the creation of a new road and lots, No firebreaks or fire access trials are proposed nor required within the
a firebreak is provided by providing a cleared road reserve not less than 20 application.
a. adequate access for fire fighting and other emergency vehicles;
metres wide and maximum gradient of 12.5% around the perimeter of the
and
subdivision, between the created lots and surrounding vegetated lands.
b. adequate access for the evacuation of residents and emergency
OR
personnel in an emergency situation.
AO8.2
Fire access tracks are provided between the created lots and surrounding
vegetated land that:
a. have a cleared minimum width of 6 metres;
www.thereforgroup.com.au 24-0565E/BF | Sunshine Butterflies | Bushfire Management Plan | 12.03.2026 | Version 1.0 36
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.