132003 221152 6 - Approved Plans
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnACCESS AND PARKING The access for construction materials and equipment will be from Park Road via the existing driveway to No. 10 Park Road. The Builder is to submit written consent for the use of this access driveway and garage from the owner of No. 10 Park Road. Access for personnel will be via Allambi Rise and Park Road. Offsite parking will be required for most construction personnel. Most workers vehicles shall be parked in Allambi Rise or in the existing driveway and carport of 12 Park Road which is accessed by the 9A driveway Allambie Rise. All construction access is to be obtained from Allambi Rise via the existing easement subject to the following exceptions: a) A crane may be used for delivering prefabricated materials and the pier digging machine to the site. The use of the crane in Park Road is to occur on two (2) separate days only, first for the delivery of the pier digging machine and any prefabricated materials, the second to retrieve the pier digging machine and provide any further prefabricated materials as required. Traffic control is to be provided for the use of the crane in Park Road, in accordance with the builders Traffic Management Plan. b) Access from Park Road to the site is to be used for the purpose of a concrete pumping pipe to be located at the base of the rock retaining wall on the boundary of 10 Park Road, laid upon a composted wood chip mulch 600mm wide and 150mm thick. Any mulch contaminated by concrete or wastes shall be removed from the site. Any remaining clean mulch may be left in situ and spread to 50mm thickness. MATERIALS HANDLING As previously described all prefabricated building materials will be delivered to site via Park Road. Manual material handling will be employed throughout the construction to minimize construction activities and impact on the site, especially existing vegetation. In addition a temporary builder’s hoist a temporary scaffold platforms will be erected in the existing driveway and within the property boundaries of 10 and 12 park road including a builders hoist over the existing Driveway to accommodate the mini concrete pump waste grout receptacles and to facilitate the easy removal of waste without using or traversing the road reserve. Temporary scaffold platforms and walkways will be constructed within the property boundaries in accordance with the Tree Protection Plan & AS
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.