PROPOSED DUPLEX UNITS AT
13 GRANT STREET, NOOSA
FOR
N, R & C TOKOVIC
SEDIMENT & EROSION CONTROL
DRAWING INDEX
ESC
ESC2 NOTES & DETAILS
SITE PLAN, LOCALITY PLAN, LEGEND & MONITORING CHECK LIST
BANKASIA. AVENUE
BANKASIA. AVENUE
NATASHA AVENUE
gWUANO
ove
0. -
GENERAL NOTES
SSEOMENT ANO EROSION CONTROLS HAVE BEEN DESIGNED IN ACCORDANCE
WITH THE i€Aust “SOR EROSION AND SEOPENT CONTROL GUDELMES FOR
‘QUEENSLAND CONSTRUCTION SITES”
{CONSTRUCTION EXIT AMD SEDIMENT CONTROLS ARE TO BE CONSTRUCTED
PRIOR TO ANY EXCAVATIONS O CONSTRUCTION WORKS AKO AS NOTED
ALL LANDSCAPED AREAS ARC TO BE REVEGETATED MC ACCOROANCE WITH
LUNOSCAPE ARCHITECTS DETANS PREDIATLEY FOLLOWING CONSTOCTION
ALL EXPOSED EARTH SURFACES ARE TO BE TOPSOLED AMO SEEOCO OR
TURFED ONCE FISHED SURFACE LEVELS ARE ACEVED
EVIDENCE OF EXCESSIVE SEDMENT 15 REVEALLED LEAVING THE SHE,
THEN. REREOIAL ACTIONS ARE TO BE TAKEN TO CLEAN UP DEPOSITIONS
AN PREVENT FURTHER POLLUTION
WASTE RECEPTORS ARE TO BE ESTABLISHED FOR CONCRETE AND MORTAR
SLURRIS, PAINTS, ACIO WASHINGS, WASTE MATERIAL AND LITTER SO
THAT POLLUTANTS ARE APPROPRIATELY CONTAINED OK SITE
ROOFS ARE TO BE CONSTRUCTED AS SOON AS POSSIBLE ANO
TEMPORARY OR PERMANENT DOWNPIES ARE TO BE STALLED
AND CONNECTED TO STORMWATER ORAMAGE MMMEDIATLEY
CONSTRUCTION EXIT MAY BE SHAXEDOWN CATTLE GRID STYLE OR
GRAVEL PAD CONSTRUCTED IV ACCOROAMCE WITH SPECIFICATION
OW SHEET ESC.3
ALL FIELD INLETS AMD GULLIES TO HAVE SEDIMENT BARRICRS INSTALLED
REMOVAL OF BARRIERS TO OCCUR OMLY WHEN RISK OF SEORMENT
TRANSPORT FROM ADJACENT AREAS 1S GOWE tre TURF 1S LAID)
REFER TO SHEET (5-8 FOR SPECIFCATIONS ANO DETAILS OF
SSEOWMENT AND EROSION CONTROLS,
LEGEND
fre DIRECTION OF OVERLAND FLOW:
ae ‘DURING BULK EARTHWORKS
E8580)
SeEXE S| construction ext
925052
STORAGE /STOCKPILE
sf
meme SEDIMENT FENCE
COT (MND SHONING RECTION OF
COC CCC tenner fo
DIVERSION CHANNEL/CATCH ORAM
CHK AM
‘SEDIMENT BARRIER
SEDIMENT BARRIER - OW GRADE
S
LOCALITY. PLAN
NOT TO SCALE
ECOMMENDED |
Under no cir unistance $s may the Plan & Spec tications be departed
ne¢oast Reg
, shin
4
Development Rermit Opqr ational Works No
ay
gionai Council
\ DAILY MONITORING CHECK LIST \ D
from-withiting written approval of Council.
Ny MONITOR cHeeK MAINTENANCE PROCEDURES ten approval of Cou
1 SEORENT LEAVING STE AFTER RAWAL TAFTER RANEALL EVENT | CLEAN AND SNEEP AFFECTED AREA AO D5 Jo
<, GRANT STREET ins a0 m6 Dm on msm Dv AAA VAHL MAL BECAME Oe ne haa KPPROVED
‘AND OTHER CONTROLS AND REFER TO MAINTE bat ‘WOTES,
2 SEOMENT ARO ORT BENG TRACKED ona (LEAN AND SWEEP AFFECTED AREA AO P| nT SITE 10
~ ONTO ROAD (AM AREA WHERE IT WILL BE RETAINED ON SIT AST RUC TOO EXIT
‘AMO REFER TO MAINTENACNE NOTES. WHEELS DF VEHICLES MAY ALSO NEED
TO BE LEANED PROR TO LEAYNG STC nara
3 SEDIMENT AND EROSION CONTROLS AAS THEY OCCUR REPAIR CONTROLS IN DISREPAIR REFER TO MAINTENANCE NOTES.
1 O1SRCPAR
Signature:
(6 MORTAR SLURRIES, PAINTS, ACIOS, WASHINGS | DARLY (LEAN AND DISPOSE OF POLLUTANTS ITO aNjaPPROPRATE WASTE "|
peti ot WASTE MATERIALS ANO LITTER LEAVING RECEPTOR NO POLLUTANTS ARE ALLOWED 10 BE WASHED INTO wteD¢
SITE M AN UNCORTROLLED MANNER (ROAD FROM EITHER RAWAL. EVENTS OR ROSA OON
° . ° ° * 2 %
SITE PLAN SANT VALIDATED COMPLAINTS ABOUT AS THEY OCCUR CHECK THAT PROBLEM IS CAUSED BY ACTIVITIES FROM SITE IF SO RECTIFY
DETERIORATION OF DOWNSTREAM ENVIRONMENT IMMEDIATLEY BY REPARING EXISTING CONTROLS OR IMPLEMENTING.
SCALE 1100 ADDITIONAL CONTROLS.
6 EXCESSIVE DUST LEAVING SITE OR ANY AAS THEY OCCUR AREA OM SITE CAUSING PROBLEM 10 BE DAMPED WITH WATER WINDBREAK
ORPLAMTS ABOUT OUST LEAVING Sie USTALLATINS MAY ALSD BE REQURED ANO/OR RCPARGO ote ‘o 60 a) te
SEALE 1100 UNREDUCED
famend [Dole [Deserption Drown ie = S Date Scale erent oe No
MIKE O'REGAN & REF PaaS OF WEA. JY JuNe 00 1100 4 REE TROVE 10-1708
PTYuo Sas > -
SEDIMENT & EROSION CONTROL eA eo Oe CEO aE Designed Drown :
CIVIL & HYDRAULIC ENGINEERS ‘
SITE PLAN, LOCALITY PLAN, LEGEND | cassis 10 constucion sousiey - eo Gee COR > Mio eM Frock Sheet rarenarnant
AND MONITORING CHECK LIST Eimer, Ge bee ie ee iEVEL DATURA <u” [ores PROPOSED DUPLEX UNITS AT ESC A
och fe high Git Goost Mol Centre 9726, Emell:[email protected] lnc cree msc rm vo. asec ns was] 13 GRANT STREET, NOOSA
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Plans 10-0662.pdf [As Published]Related documentApplication case desk ↗
Approved Plans 10-0662.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.