Attachment C - Stormwater Mangement Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn of the currently existing stormwater runoff on each Lot prior to the construction
of any dwellings.
4.0 Natural surface contour lines to the AHD
The contour lines are shown in Appendix A: Site Locality Plan.
9.0 SBSMP CONCLUSIONS:
This proposed development of 18 Glamping Tents (dwellings), the Caretakers
residence (including shed out building), the Recreation area and the 3 associated
Parking areas on this Lot 2 will actually improve the stormwater performance of the
land or will certainly not lead to a worsening of the existing stormwater performance
of Lot 2 when compared to the pre-developed state.
Once the 23kL rainwater tanks shared between 2 Glamping Tent dwellings are full
(such as during major or long rainfall events), the overflow will discharge into the
associated “Vegetated Infiltration & Level Spreader Swale” which is incorporated into
the landscaping for the site. When these vegetated swales overflow, the resultant
stormwater flows will follow the contours of the land, thus replicating the sheet flow
situation similar to how stormwater flows across the land once it is saturated and
before any dwellings or other impervious surfaces were constructed.
Ian J. Marshall JP (Qual), MIEAust, CPEng, NER (Civil), RPEQ
CIVIL ENGINEER
E: [email protected]
Mobile: 0421 044 884
RPEQ: 15254
APPENDIX A: SITE LOCALITY PLAN
Revision: B – 2nd August 2021
10