Original source · versioned page text
Attachment C - Stormwater Mangement Plan
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnEXECUTIVE SUMMARY Marshall Civil Engineering was commissioned by Mr Brian Williams to prepare a Site Based Stormwater Management Plan (SBSMP) to support the proposed minor change to an existing approved DA 51987.2966.04 for a Residential Development at Lot 2 on GTP 1928, 396 Lake Cooroibah Rd, Cooroibah, Qld, 4565 To satisfy alternative stormwater quality management measures, this development will incorporate a 23kL of rainwater storage per pair (x 2) habitable Glamping Tent dwellings, for use as both potable water supply and also for landscape irrigation and other external (common property) uses. This report outlines the intended stormwater strategy to be adopted on site to achieve water quality objectives and achieve non-worsening peak flow rates from the proposed development. The report is to be read in conjunction with the Engineering and Architect drawings accompanying the change application. Revision: B – 2nd August 2021 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.