Attachment C - Stormwater Mangement Plan

of 10

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
          design which is at the heart of the overall design concept for this Nature Based
          Development.
          The only other impervious surface proposed on this Lot is the required on-site
          parking. These parking areas will be graded so that all stormwater flows over
          flush kerbing into the adjacent existing Vegetated swales which form part of the
          Landscaping for the Development.

          5. Conclusion

          High quality urban design must contribute positively to communities, enhance
          liveability, reflect cultural identity, and promote attractive and high amenity
          communities.
          The aim of any sustainable water quality and re use policy is to “protect the
          health of ecological systems and the biodiversity they support” and also to
          “conserve areas with identified environmental and landscape values” and this
          process is enhanced by encouraging the use of alternative water sources.


3.0       PURPOSE AND SCOPE OF THE REPORT:
The purpose of this Nature Based Stormwater Management Plan is to evaluate
existing and potential stormwater impacts of the proposed development against the
requirements of the Noosa Shire Council Panning Scheme.

In particular this Stormwater Management Plan will ensure that:

         Appropriate standards are maintained on all stormwater aspects within the site.
         The surrounding area is not adversely affected nor unduly disrupted by the
          quantity for quality of stormwater during construction, operations and
          maintenance.

4.0       SITE DESCRIPTION:

Our client owns Lot 2 of a 3 Lot subdivision. Lot 0 is the Common Property under the
control of the Body Corporate and Lot 1 is another Lot facing the Lake and contains a
small number of Cottages.

This application proposes a minor change to the approved DA 51987.2966.04 to allow
the approved dwellings (x19) approved for Lot 2 to be changed and become Glamping
Tents (x 18) constructed on permanent elevated timber deck structures.

The proposed Caretakers Residence will be retained and built as a conventional
dwelling structure.



 Revision: B – 2nd August 2021
                                                                                       6
Log in to download the original file

Attachment C - Stormwater Mangement Plan.pdf · 562 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.