Council archive · source document
Decision Notice - Approved by Delegation of Authority OPW17 0554 · OPW17/0554
Officer: Monkeith Kadhum Direct Telephone: 07 53296293 Our Reference: OPW17/0554 : JELDER Your Reference: 16003 19 February 2018 Altum Properties No 4 Pty Ltd TTE C/- Morgan Consulting Engineers Pty Ltd 1 Great George St PADDINGTON QLD 4064 [email protected] Dear Sir, Decision Notice Planning Act 2016 I refer to your application and advise that on 15 February 2018, Council decided to approve the application, subject to conditions. Details of the decision are as follows: application details Application No: OPW17/0554 Street address: 75 Resort Dr Noosa Heads Qld 4567 Real property description: Lot 7 SP 178340 No related Land Planning Scheme: The Noosa Plan (3 July 2017) Decision details Council decided to issue the following type of approval: Preliminary Approval for Operational Works - Carparking, Drainage Works, Frontage Work, Landscaping, Roadworks (Precinct F – Stage 1) CURRENCY PERIOD of approval The currency period for this development approval is 2 years starting the day that this development approval takes effect. assessment manager conditions STORMWATER SENSITIVE DESIGN AND WATER QUALITY Prior to issue of a Development Permit for Operational Works, the Detailed Stormwater Quality Management Plan must be approved as per Condition 49 of the MCU (File No 132005.1133.5). The following items of the Detailed Stormwater Quality Management Plan require amendment prior to it receiving approval: Demonstrate how concentrations for Total Nitrogen, Total Phosphorous and Total Suspended Solids in all modelled rainfall events, including events where the concentrations exceed the 90th%ile values currently recorded in the Noosa Springs Lake System, would not be considered responsible or a contributor for adverse water quality impacts, such as a cyanobacterial outbreak, within the Noosa Springs Lake System. Include staging plans which demonstrate how the water quality treatment infrastructure proposed to be completed for each stage of the development will achieve the water quality required by Condition 49 in isolation of any other stages of developed occurring. As part of this response demonstrate whether or not Bio retention Basin 2 is necessary to meet the water quality requirements. Amend the monitoring to be undertaken for a minimum period of 5 years consistent with other approvals for the site. Include reference for monitoring and analysis methods to be consistent with the 2018 version of the Department of Environment and Science Monitoring and Sampling Manual. Amend the monitoring trigger rainfall flow event to capture the first flush events – i.e. 25mm rainfall events with at least one event being captured per season (i.e. summer, autumn, winter and spring). Refer to the Water By Design Maintenance and Rectification Guidelines. Include maintenance measures to ensure the infiltration capacity of the swales and bio retention basins, as proposed by the MUSIC model used to inform the Stormwater Management Plan submitted for approval, is retained for the lifetime of the development. The following plans require amendment prior to issue of a Development Permit for Operational Works: Update detail design drawings: C12–A1, C15-A1 of by Morgan Consulting and the relevant stormwater drainage longitudinal sections to demonstrate how the water from Blocks 20, 21 and 22 (i.e. stormwater structure 6/16 will enter the swale in a manner that will not cause any scour, and will receive treatment consistent with the MUSIC model used to inform the Stormwater Management Plan submitted for approval. Detail design plans must be amended, where required to include all water quality treatment devices required for Precinct F to achieve the required water quality out outcomes, as detailed to respond to Condition 1b and to be consistent with the Stormwater Management Plan approved pursuant to Condition 49 of the MCU (File No 132005.1133.5). This includes, but is not limited to, where bioretention basin 2 is needed for Precinct F to achieve the required water quality requirements in isolation of Precinct E2 being completed, amend drawing 16003/C19 to include the required bioretention system. All vertical interfaces with the filter media within Bioretention Systems must include measures, such as a 300mm wide geofabric border with 100mm cover as detailed on IPWEQAQ drawing WSUD-001 to prevent short circuiting and runnelling of water alongside the filter media. LANDSCAPING Prior to issue of a Development Permit for Operational Works, the following items need to be addressed: Revised landscape plans must be submitted and approved which remove any formal or informal pathways from the road reserve fronting Resort Drive, specifically those shown on drawing set CTS2 Parkridge Villas. Revised landscape plans must be submitted and approved which remove any structures, including stormwater infrastructures, in the required 2m setback to Resort Drive and to include landscaping, specifically relating to drawing set CTS2 Parkridge Villas. Landscaping plans must include the planting of koala food trees and local native species within the road reserve along Resort Drive. WASTE MANAGEMENT In compliance with Condition 70 of the MCU approval (File No 132005.1133.5) the Waste Management Plan for the site is required for approval prior to the issuing of a Development for Operational Works, the following amendments/corrections to the submitted Waste Management Plan by ttm are required: References to the Sunshine Coast Council Waste Management Code need to be corrected to the relevant Codes and Planning Policies of The Noosa Plan. (Section 3) Bin Servicing Indicates collection with a front lift vehicle. This is incorrect, bins will be serviced with a rear lift vehicle and bins will be removed from the enclosures and returned by the Waste Contractor. Recycling is done weekly not twice weekly. (Section 4) On-going Management – indicates bins will be towed around the site by onsite managers. Council will not supply the attachments to enable the bins to be towed. This will be at property owners’ expense. (Appendix A – Section A.1- Refuse Calculations) Reference is made to the Sunshine Council Waste Planning Scheme policy, this need to be corrected and calculations be revised accordingly. CIVIL ENGINEERING Prior to issue of a Development Permit for Operational Works, Drawings 16003/C13–A2 and 16003/C14-A2 by Morgan Consulting require amendments to comply with Condition 96 of the MCU regarding providing 2 metres for extensive landscaped area rear Blocks 7, 8 and 9, amend submitted drawings as follow : Remove all proposed retaining walls and stormwater infrastructures (to the exception of stormwater pipeline connection to the existing gully pit) from the 2 metres landscape setback on Blocks 7, 8 and 9. Amend all relevant stormwater drainage layout plans, stormwater longitudinal sections and drawings accordingly. referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes It must be noted that a Preliminary Approval for Operational Works does NOT permit commencement of any works. Further representation to change the Preliminary Approval to a Development Permit may be made within the appeal period. After the appeal period expires, the Preliminary Approval cannot be changed to a Development Permit, and a new development application for Operational Works will be required to be made, addressing the requirements of the Preliminary Approval. A Development Permit for Operational Works has not been issued because a number of outstanding issues need to be addressed. Council may favourably consider changing the Preliminary Approval to a Development Permit via the Negotiated Decision process, if the applicant satisfactorily complies with the conditions of this Preliminary Approval. property notes Not applicable. VARIATION approval Not applicable. further development permits required Not applicable. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. Yours faithfully, Monkeith Kadhum Development Engineer Enc: Appeal Rights Approved Plans/Documents cc. Unitywater Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017 Chapter 6 Dispute resolution Part 1 Appeal rights 228 Appeals to tribunal or P&E Court (1) Schedule 1 of the Planning Act 2016 states – (a) Matters that may be appealed to – (i) either a tribunal or the P&E Court; or (ii) only a tribunal; or (iii) only the P&E Court; and (b) The person- (i) who may appeal a matter (the appellant); and (ii) who is a respondent in an appeal of the matter; and (iii) who is a co-respondent in an appeal of the matter; and (iv) who may elect to be a co-respondent in an appeal of the matter. (Refer to Schedule 1 of the Planning Act 2016) (2) An appellant may start an appeal within the appeal period. (3) The appeal period is – (a) for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or (b) for an appeal against a deemed refusal – at any time after the deemed refusal happens; or (c) for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or (d) for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or (e) for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or (f) for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person. Note – See the P&E Court Act for the court’s power to extend the appeal period. (4) Each respondent and co-respondent for an appeal may be heard in the appeal. (5) If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal. (6) To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about- (a) the adopted charge itself; or (b) for a decision about an offset or refund- (i) the establishment cost of trunk infrastructure identified in a LGIP; or (ii) the cost of infrastructure decided using the method included in the local government’s charges resolution. 229 Notice of appeal (1) An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that- (a) is in the approved form; and (b) succinctly states the grounds of the appeal. (2) The notice of appeal must be accompanied by the required fee. (3) The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to – (a) the respondent for the appeal; and (b) each co-respondent for the appeal; and (c) for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and (d) for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and (e) each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and (f) for an appeal to the P&E Court – the chief executive; and (g) for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate. (4) The service period is – (a) if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or (b) otherwise – 10 business days after the appeal is started. (5) A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6). (6) A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person. 230 Other appeals (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable. (2) The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error. (3) A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter. (4) In this section – decision includes- (a) conduct engaged in for the purpose of making a decision; and (b) other conduct that relates to the making of a decision; and (c) the making of a decision or failure to make a decision; and (d) a purported decision; and (e) a deemed refusal. non-appealable, for a decision or matter, means the decision or matter- (a) is final and conclusive; and (b) may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and (c) is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground. 231 Rules of the P&E Court (1) A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal. (2) However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court [word/footer1.xml] Page 5 of 5 [word/footer2.xml] PO Box 141 P. (07) 5329 6500 [email protected] TEWANTIN QLD 4565 F. (07) 5329 6501 www.noosa.qld.gov.au Page 1 of 5 [Attachment: image3.png (image text)] ee) NOOSA COUNCIL
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Approved by Delegation of Authority OPW17 0554Related documentApplication case desk ↗
About this file
- File size
- 320 KB (small file)
- File type
- DOCX
No other editions are linked here.