Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Body Corporate - Deed of Engagement 13.04.2022 · 132006.823.10

of 38

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                          Page 29
NICHOLSONS     Deed of Engagement
  Solicitors


[OCR of page images]
NICHOLSONS

Solicitors Deed of Engagement

Garbage Bin Area

1. scrub out rubbish bins with disinfectant/cleanser as necessary;
2 hose and clean out bin area as necessary; 7

as place wheelie bins at collection points for Council collection; and
4

after garbage collection by Council replace bins in garbage bin area of
each Lot.

(NOTE: Bins to be put our and collected more often as required to correspond
with collection by Council if necessary.)

Fire Safety

is check fire hoses in accordance with the requirements specified in
Australian Fire Safety Regulations.

GENERAL
Grounds and gardens

Engage at the direction and expense of the Body Corporate and supervise any
contractor/s engaged in lawn mowing, care and maintenance and In general
gardening and maintenance duties relating to the vegetation on common
property.

External Window Cleaning

Engage at the direction and expense of the Body Corporate and supervise
contractors to clean the external surfaces of windows of lots (which external
surfaces are common property) three times a year or at such other frequency the
Body Corporate determines.

External Walls Maintenance and Painting

Engage at the direction and expense of the Body Corporate and supervise
contractors to maintain and paint the external surfaces of walls of lots (which
external surfaces of walls are common property) at such frequency as the Body
Corporate determines.

Pest Control and Termite Inspection

Engage at the direction and expense of the Body Corporate and supervise
contractors to carry out pest and termite inspections and to carry out any
requisite spraying or other treatment annually or at such other frequency as the
Body Corporate determines.

Timber Restaining

Engage at the direction and expense of the Body Corporate and supervise
contractors to carry out the maintenance and restaining of improvements and
structures on common property at such frequency as the Body Corporate
determines.

Page 29

Used in these records

About this file

File size
2.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Body Corporate - Deed of Engagement 13.04.2022.pdf · 2.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.