Annex 14 - Engineering Drawings NROR-2021 (small)
Attached to the e-mail DA Application - Noosa Oyster Project (3 of 3).
The original of this document is very large (10.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
LOCALITY PLAN
SITE
GOAT ISLAND SITE
NOTES
1. Drawing Data:
1.1. Aerial image. Nearmap 29/10/2020
1.2. Site Survey. Northgroup Consulting Jan 2021
1.3. Environmental Mapping. Ecological Service
Professionals 2020
2. Site Parameters
2.1. 50yr Design wave height: 0.54m
2.2. 50yr Design wave period: 2.2s
2.3. 50yr Flood velocity: 0.48m/s
SITE LOCATION HAT
MHWS
MSL
RL +0.80m
RL +0.64m
RL +0.38m
AHD RL +0.34m
MLWS RL +0.21m
LAT RL 0.0m
From MSQ 2021 Tidal Planes Tewantin Station
3. Restoration Footprint.
3.1. Landward extent defined by minimum distance
to vegetation. Extent may be modified on site
as required to ensure no impact to existing
vegetation (including dead trees).
3.2. Seaward extent defined by 1m below MLWS.
3.3. Observe all constraints and minimum distances
set out in Drawing NROR-2021-00.
35 RESTORATION FOOTPRINT SEAGRASSES 4. Reef Patch Layout.
MCH4795 4.1. Based on design modules 2 & 3. Refer
(Min 10m DISTANCE) Drawing NROR-2021-02.
4.2. Rock size 150mm to 500mm with 50% over
300mm.
4.3. Access width nominal 1m to 4m.
ROCK SUBSTRATE TO BE PLACED CLEAR OF EXISTING 4.4. Minor layout modifications may be adopted in
response to any changes in site characteristics
VEGETATION AND BELOW MHWS WERE POSSIBLE. F
l 58m
(e.g. in response to a newly fallen tree or
Nomina
changes to seagrass extent). Any modification
MANGROVES to be in line with design principles outlined in
Drawing NROR-2021-02. Any significant
changes to be reviewed by the certifying
E 4.5.
engineer.
Total Restoration Footprint area 837m2
Min 2 Min 4.6. Total area of rock 464m2
m 10m
4.7.
4.8.
Total volume of rock ~303m3
Historic survey data limited. Settlement
expected to be 0.2 - 0.5m but could be higher.
A Higher settlement expected on seaward edge
of reef.
12m to 1
LEGEND
D HAT Restoration Footprint
B MHWS Sand
MLWS Disturbance to Fish
1m Below MLWS Habitat Area
4m
Vegetation Line
Fish Habitat Area Extent
C RP Boundary
837m2 Disturbance to FHA Mangroves
Seagrass
VERTICAL DATUM: LAT HORIZONTAL DATUM: GDA94
REVISION REGISTER
- - - - - -
nd
tate La
cated S
- - - - - -
REEF PATCH END TAPERED TO REDUCE Unallo SA RIVER - - - - - -
IMPACTS TO CHANNEL FLOW NOO
- - - - - -
Min 30m DISTANCE FROM MSQ MOORING - - - - - -
0 30 A 9/7/21 Pre-lodgement comments SK BC AJ
15 REV.NO. DATE DESCRIPTION BY ENG. APP.
Meters
REEF PATCHES LAYOUT International
Coastal
Management
Restoration Footprint OFFICE 50 / G Arm, SYC Marina, Main Beach, 4217, QLD, Australia
POST PO Box 306, Main Beach LPO, Main Beach QLD, 4217, Australia
TELEPHONE +61 7 55640564 FAX +61 7 55329147
0.7m 12m to 14m 1m
WEBSITE www.coastalmanagement.com.au
3m to 6m 2m to 4m 1m to 3m PROJECT NAME
Noosa River Oyster Restoration
+0.1 to +0.3m AHD +0.1 to +0.3m AHD MHWS DRAWING TITLE
Phase 1 - Goat Island
1.5 max MLWS Restoration Site
1 LAT DRAWING No. REVISION:
NROR-2021-03 A
1m Below MLWS DRAWN : SK CHECKED :BC APPROVED :AJ
RPEQ 2876
SIZE: A3 SCALE : A3 DATE : 05 Aug, 2021
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.