Council archive · source document
Appendix J - Code Assessment · RAL25/0004
PO24 Complies.
No acceptable outcome provided
Development provides for the effective drainage of lots and
roads in a manner that:- Water Quality Objectives are mandated by the
State Government. They are identified in the State
(a) maintains the natural flow regime; Planning Policy 2017 (SPP). The SPP includes the
(b) effectively manages stormwater quality and quantity; and following triggers to that are required to achieve
(c) ensures no adverse impacts on receiving waters and water quality objectives:
surrounding land.
“(2) Reconfiguring a lot for an urban purpose that
involves premises 2500m2 or greater in size and will
Editor’s Note— Requirements for the design and
result in six of more lots”.
construction of stormwater management infrastructure
are addressed in Part 9.4.9 Water Quality and Drainage
Based on the above, there are no water quality
code
objectives that are required to be achieved for this
development. However, it is noted that a bio-
retention basin will be provided at the northeastern
corner of the subject site to aid in maintaining
stormwater quality for the subject site.
Stormwater for any development on proposed Lot
1 and 2 will have a lawful point of discharge
connected to the bio-retention basin. Stormwater
from the new road will be captured and discharged
into the bio-basin. Lot 3 will be provided with a
lawful point of discharge in the south east corner of
the Lot which will drain to the drainage reserve
beyond (see Appendix E for details).
The proposed measures will provide a significant
amenity improvement to properties along the
adjoining Dianella Court by providing additional
infrastructure for stormwater discharge and a bio-
retention basin for stormwater quality management
as opposed to sheet flowing to the east under the
current scenario.
Conflicting land uses
PO25 Not applicable.
New lots for residential development do not adjoin land No acceptable outcome provided
located in the Medium impact industry zone or the Low
impact industry zone.
Rearrangement of Lot Boundaries
PO26 AO26 Not applicable.
Development provides that the rearrangement of lot The rearrangement of lot boundaries results is an
boundaries is an improvement on the existing situation. improvement to the existing situation whereby the size
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix J - Code Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 430 KB (small file)
- File type
No other editions are linked here.