Negotiated Decision Notice OPW26 0033 (As Published)
Qualified Person
12. Qualified Person, for the purpose of:
a. Supervising landscape works and preparing a landscape certification, is considered to
be a landscape architect, landscape designer or horticulturist with a minimum of three
years current experience in the field of landscape design.
b. Undertaking landscape construction and establishment works is considered to be a
person with five years current experience in commercial landscape construction
projects.
c. Undertaking rehabilitation construction and establishment works is considered to be a
person with five years current experience in revegetation and regeneration.
d. Undertaking, supervising tree works and preparing arboriculture certification, is
considered to be a person with a minimum three years current experience in tree
protection, hazard identification/mitigation and certifying AS2303:2018 Tree stock for
landscape use and either:
i. International Society of Arboriculture (ISA) certification; or
ii. A Diploma of Arboriculture (min AQF level 5).
e. Managing Fauna protection, preparing Fauna reporting and certification and
calculating compensatory habitat, is considered to be an Ecologist and Environmental
Scientist with a minimum of three years current experience in the field of fauna
assessment and management and current certification under the Queensland Parks
and Wildlife Service.
f. Supervising and certifying Bushfire Management is considered to be an Ecologist with
suitable experience or a person with Fire Protection Association Australia – Bushfire
Planning and Design certification.
Erosion and Sediment Control
13. Accepted best practice standards include International Erosion Control Association
Australasia Best Practice Erosion and Sediment Control.
14. Qualified Person, for the purpose of erosion and sediment control is a Certified Professional
in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional
Engineer of Queensland (RPEQ).
15. As a general rule, a site is determined to have achieved effective short-term stabilisation if
at the time of the plan sealing inspection:
a. Methods of stabilisation are:
• appropriate for slopes and slope lengths; and
• are consistent with best practice environmental management practices such as in
the Manual for Erosion and Sediment Control or the IECA Manual; and
b. Stormwater runoff from the site is not currently and is not likely to result in visible
evidence of sedimentation or erosion, or lead to water contamination.
Road Reserve Permit
16. This development permit provides the applicant with written authority to undertake the
prescribed works. Any additional activities that are undertaken inside Council’s road reserve
for the purpose of acting on this development permit may require a Road Reserve Permit.
These additional activities may include, but are not limited to, hoarding, pedestrian
diversions, laneway closures, etc. To apply for a Road Reserve Permit, or for more
information, Contact Council’s Road Reserve Officer at [email protected] 20 of 22
Document Set ID: 25209919
Version: 4, Version Date: 02/10/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Negotiated Decision Notice OPW26 0033 (As Published).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.